Home
1984 Columbia River Basin Fish and Wildlife Program
posted May 17, 2013
See Program (4mb) and Appendices (19mb)
To the People of the Pacific Northwest:
In 1982, the Northwest Power Planning Council unveiled its Columbia River Basin Fish and Wildlife Program. That program turned out to be one of the most important efforts to save a natural resource currently going on in this nation. It is designed to protect and restore the once teeming fish and wildlife populations which have been seriously depleted by hydroelectric development in the Basin.
In many ways, this innovative program is far more than the Council's program. It truly belongs to the people of the Pacific Northwest. As the program developed, the Council heard oral testimony and received written commenlfrom people from all over the region. These included Indian tribes, fish and wildlife agencies and other resource managers, utilities and federal power agencies, environmental groups, scientists, and businesses, as well as private individuals. The Council reviewed and took into account all of this testimony as it developed the program.
Then, a year after the program was adopted, the Council reopened the program for amendment and received 140 proposals from individuals and organizations throughout the region. In addition,the Council staff proposed changes.Once again,the Council went through an intensive public review process. The result is this amended program.
The Council will continue to reopen the program in the future to the people of the North west to allow changes which reflect knowledge gained through study and practice and new scientific technology.Thus,the program will remain vital and effective in its efforts to preserve the Basin's resources. Throughout this process, our goal will be to recognize our debt to the past at the same time we are making an investment in our future.
ISAB Review of NOAA Fisheries’ 2010 Low Flow Fish Transport Operations Proposal
posted May 17, 2013
On February 25, 2010, NOAA Fisheries requested ISAB assistance with a question related to a low flow transportation proposal for the spring 2010 juvenile salmon outmigration. Current river forecasts predict a low flow year for 2010, prompting NOAA Fisheries to propose maximizing the transport of Snake River juvenile steelhead and spring/summer Chinook in the month of May. The ISAB's review is attached.
ISAB Conclusions
- Multi-species Perspective
Based on ecological principles and considering the uncertainties of the data, using combinations of transport and in-river migration with spill spreads the risk across species, stocks, and the ecosystem, while offering an approach that can shed light on uncertainties in the longer-term dataset. - Operational Changes – Lessons Learned
The ISAB concluded (ISAB 2008-5) that a mixed strategy of spill and transport during the critical spring migration period allows learning from spill conditions and supports potential advances in knowledge to improve decision-making in the future. This conclusion remains as valid in 2010 as in 2008. A mixed strategy in low-flow conditions provides an important opportunity to learn from the concurrent spill and transport mix of recent years. - Addressing Uncertainties – Lamprey
There remains a gap in knowledge of the effects of various spill-transport operations on downstream juvenile Pacific lamprey migration. Development of a suitable means of tracking migrating juvenile lamprey is a critical need. Information on Pacific lamprey response to hydrosystem operations, including spill-transport, would be vastly improved if mark-recovery methods were available for juveniles. - Addressing Uncertainties – Sockeye
Studies to examine the relative benefits of spill and transport for sockeye were initiated in 2009 and anticipated to continue in 2010. These studies could provide important additional information to reduce uncertainties relevant to sockeye juvenile migration. - Addressing Uncertainties – Straying
Out-of-basin straying remains a concern for some steelhead stocks. The reports that steelhead transported from the Snake River on barges have a higher straying rate and lower homing rate than fish migrating in-river adds to the concern. Information is needed to inform efforts to minimize the number of out-of-basin strays spawning in Lower Columbia tributaries. - Spill as the Baseline – Ecological and Evolutionary Considerations
The premise that spill more closely mimics natural situations and ecological processes than maximum transportation leads to a mixed strategy of concurrent spill and transport to conserve diversity and future potential of the ecosystem.
Thus, the ISAB conclusion is the same now as it was in 2008. From a scientific standpoint, a mixed strategy for spill and transport is best supported by the available science. Ecological and evolutionary considerations provide an important framework in support of this strategy.
NOAA Fisheries request for ISAB review
On February 25, 2010 NOAA Fisheries requested ISAB assistance with a question related to a "low flow" transportation proposal for the spring 2010 juvenile migration. These are review materials leading to the completed ISAB review:
posted 3/30/10
posted 3/16/10
- FPC clarifications to March 12 discussions
- FPC Review of NOAA document "Factors affecting sockeye salmon returns to the Columbia River in 2008"
posted 3/12/10
posted 3/5/10
- Presentations from March 12 meeting
- NOAA request letter
- NOAA supporting document
- NOAA Final transport analyses
- NOAA 2008 sockeye returns
- FPC analysis: Review of the NOAA Transportation analyses and potential effects of reducing spill for fish passage in May and beginning the transportation program earlier in the spring and supporting analyses
- FPC analysis of proposed juvenile fish passage operation for 2010 in the Snake River
- ODFW spill transport questions
- John Day Stray summary
- Muir et al 2001, Survival of Juvenile Salmonids Passing through Bypass Systems, Turbines, and Spillways with and without Flow Deflectors at Snake River Dams
- Roby et al 2007 final season summary
- Snake River steelhead straying (Peery)
Background
For 2010, the Columbia River Basin appears to be facing a very low water year. The latest river forecasts estimate flow at The Dalles Dam to be only 71 percent of the 30-year average. The current flow forecast for the Snake River is approximately 65 kcfs. NOAA Fisheries believes new information in a 2010 Northwest Fisheries Science Center Report demonstrates there is significant benefit to maximizing the transport of Snake River juvenile steelhead and spring/summer Chinook under low flow conditions in the month of May. Information from 2007 (the most recent low flow year) is generally consistent with transport data used to structure transport operations under the 2008 FRCRPS Biological Opinion.
The ISAB recommended, in their Snake River Spill-Transport Review (ISAB 2008-5), that “whenever river conditions allow during the late April-May period, a strategy allowing for concurrent transportation and spill is prudent.” Taking into account the ISAB’s recommendation, NOAA Fisheries looked at the data from the 2007 low-flow year and determined that if flow conditions in 2010 were similar to 2007 (i.e., <65 kcfs), it would not be “prudent” to continue spilling water in May at the three collector projects as in 2007.
NOAA's question to the ISAB: Has NOAA Fisheries correctly interpreted the ISAB’s recommendation? If not, please further explain your reasoning in the 2008 recommendation.
The ISAB intends to complete its review by early April in time to inform management decision for the salmon migration season.
Natural Gas Advisory Committee June 7, 2013
posted May 14, 2013 by Massoud Jourabchi
Tentative Agenda
Natural Gas Advisory Committee
June 7th, 2013
9:00 AM to 12:30 PM
Instructions for GoToMeeting provided below
- Welcome and introductions 9:00 to 9:15
- Northwest Gas Outlook - (NWNGA) 9:15 to 9:45
- Shale Gas- alternative scenarios (CEC) 9:45 to 10:15
- NAMgas model- (CEC) 10:15 to 10:45
- Draft Environmental Costs (Council staff) 10:45 to 11:00
- Break
- Straw man proposal 7th plan forecasted prices 11:10 to 12:00
- Result of fuel price poll
- Comparison to other forecasts
- How different future fuel prices are created in
Council’s Regional Portfolio Model (council staff) 12:00 to 12:20
- Next steps 12:20 to 12:30
If you are not able to attend in person, please join us meeting using GoToMeeting.
https://www1.gotomeeting.com/join/822067040
2. Use your microphone and speakers (VoIP) - a headset is recommended. Or, call in using your telephone.
Dial 1 877 309 2070
Access Code: 822-067-040
Audio PIN: Shown after joining the meeting
Meeting ID: 822-067-040
Mason County PUD No. 3 Renewable Demand Response Pilot
posted May 13, 2013
This is a report on the results of the Mason County PUD No. 3 water heater pilot. This Northwest pilot involved 100 water heaters. Control of the water heaters was used to explore the potential for peak shaving and renewable integration.
This report is available at http://www.masonpud3.org/conservation/docs/rdr1_pilotproject_mcpud3_finalreport.pdf.
PNUCC Identifies DSM for Capacity in NRF
posted May 13, 2013
The Pacific Northwest Utilities Conference Committee released it's Northwest Regional Forecast. The NRF identifies Demand-Side Management as a peaking capacity resource of focus to Northwest Utilities.
The report can be found at http://www.pnucc.org/sites/default/files/file-uploads/2013%20Northwest%20Regional%20Forecast_0.pdf.
council members test
posted May 13, 2013 by Melissa Shavlik
Melissa you can put content here or add it directly to the OpenTemplate template.
Flexibility Metrics Meeting
posted May 13, 2013
This meeting focused on the current state of flexibility metrics. There was a dual focus of what is currently being done in utility planning processes and what metrics are being used in research.
Agenda
- 8:30 - 9:00 AM - Welcome and introduction - Ben Kujala (NWPCC)
- 9:00 - 9:30 AM - Avista's flexibility overview - James Gall (Avista)
- 9:30 - 10:00 AM - Methods and metrics to assess power system flexibility - Aidan Tuohy (EPRI)
- 10:00 - 10:30 AM - Roundtable discussion on flexibility metrics in utilities
- 10:30 - 10:45 AM - Break
- 10:45 - 11:15 AM - Optimizing flexibility in the short-term and the long-term - Daniel Kirschen (UW)
- 11:15 - 11:45 AM - Path Union CRDC: A new approach to assessing flexibility requirements - Michael Schilmoeller (NWPCC)
- 11:45 - 12:30 PM - Roundtable discussion on flexibility metrics in research
posted May 13, 2013
The May 2, 2013 meeting focused on the current state of flexibility metrics. There was a dual focus of what is currently being done in utility planning processes and what metrics are being used in research
Contact Ben Kujala (503-222-5161) for more information.
ISRP Comment on the Yakama Nation's Response for the Klickitat Master Plan (#1988-115-35)
posted May 10, 2013
[Email sent: Friday, May 10, 2013 12:03 PM]
Tony and Mark,
The ISRP considered the Yakama Nation’s response to our questions about the Klickitat segregated steelhead harvest program. Based on the Yakama Nations’ response, we understand that this segregated steelhead program is funded through the Mitchell Act and operated by Washington Department of Fish and Wildlife. Consequently, this work is not part of the BPA funded Yakama Nation Master Plan and thus appears to be outside the Council and ISRP project review process.
This situation is common where a Fish and Wildlife Program hatchery interacts with non-Fish and Wildlife Program hatcheries including PUD, Idaho Power, and Mitchell Act funded hatcheries. In past Step Reviews, the ISRP has not based a final Step recommendation on whether a Fish and Wildlife Program hatchery has comprehensively evaluated cumulative interactions with these other hatcheries or justified the other hatcheries’ actions. That said, the segregated steelhead program potentially has significant impacts on Klickitat steelhead and spring Chinook populations. The ISRP and ISAB have recognized the need for analysis of the cumulative effects of multiple programs at the subbasin, province, and basin levels. The ISRP is not aware of a comprehensive effort to address this cumulative effects issue, which extends well beyond this Klickitat Step Review.
The ISRP looks forward to reviewing the Yakama Nation’s Step Three submittal for the Klickitat Master Plan. This Step Three submittal should include responses to the ISRP qualifications #2 McCreedy Creek Steelhead Supplementation and #3 Spring Chinook Integrated Harvest and Colonization, and address steelhead monitoring issue R1.2. raised in the Step Two review (ISRP 2013-01). The Klickitat Master Plan’s segregated steelhead monitoring proposes to use the proportion of smolts with hatchery parentage (<5%) observed in smolt samples as the primary guidepost. In the Step Two review, the ISRP concluded this monitoring was insufficient. The segregated steelhead program’s effects on natural populations extend beyond introgression, especially density dependent ecological effects. The response of May 1, 2013 from the Yakama Nation specifically states they would continue to use the decision tree and introgression level for steelhead monitoring. In addition, the Step Three submittal should establish a monitoring design that recognizes and addresses disease, predation, and competition risks as well as genetic risks.
Sincerely,
Rich Alldredge
Draft Fiscal Year 2015 budget and Fiscal Year 2014 revisions
posted May 10, 2013 by Sharon Ossmann
Dear Northwest Citizen:
The Council, which is funded through the Bonneville Power Administration, holds budget increases to less than three percent per year during Fiscal Year 2014 and Fiscal Year 2015. The Council's Fiscal Year 2014 revised budget of $10,565,000 is 2.7 percent higher than the current year 2013 budget of $10,283,000. The Council's Fiscal Year 2015 budget has a projected increase of 2.2 percent to $10,794,000.
The Council is seeking comments on the proposed draft budget. In order to be considered at our July 9-10, 2013 meeting in Seattle, Washington, written comments should be received at the Council's central office by June 28, 2013. We also will allow time for oral comment on the budget at the June 11-12, 2013 Council meeting in Missoula, Montana. In addition, the Council will schedule consultations on request.
The Council expects to adopt the budget at its July meeting. Any questions on this draft budget should be directed to Sharon Ossmann, director, Administrative Division, at the Council's Central Office, 851 S.W. Sixth Ave., Suite 1100, Portland, OR, 97204.
Sincerely,
Stephen L. Crow, Executive Director
Draft Sixth Power Plan public hearings and transcripts
posted May 10, 2013
| Sept. 14, 2009 | Pasco, Washington | Transcript |
| Sept. 15 | Spokane, Washington | Transcript |
| Sept. 28 | Eugene, Oregon | Transcript |
| Sept. 30 | Seattle, Washington | Transcript |
| Oct. 13 | Boise, Idaho | Transcript |
| Oct. 13 | Missoula, Montana | Transcript |
| Oct. 14 | Idaho Falls, Idaho | Transcript |
| Oct. 14 | Portland, Oregon | Transcript |
Download a file
posted May 10, 2013
Error loading MacroEngine script (file: downloadFile.cshtml)LBNL Mass Market DR and VG Integration
posted May 10, 2013
This Lawrence Berkeley National Labs report focuses on the use of DR for variable generation integration. This subject definitely applies to the Northwest because of the high penetration of renewables in regional balancing authorities.
The link for the report is
http://eetd.lbl.gov/EA/Ems/reports/lbnl-5063e.pdf.
Draft Sixth Power Plan Comment
posted May 10, 2013
Error loading MacroEngine script (file: draft6thPlanComment.cshtml)Draft Sixth Power Plan Comments
posted May 10, 2013
| 2910 LLC | Our country and the whole world is looking for leaders in the battle to fight global warming and establish non-fossil-fuel energy streams. The Northwest has several natural advantages that can hel... |
| Abel, Jerian | I appreciate your efforts on energy efficiency and focus on renewables, and I would like to see those efforts fortified with a reduction in greenhouse emissions. Although your draft plan is admirably... |
| Abraham, Sandra | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Adams, Mayor Sam | Attached as a PDF. |
| Aegerter, Bob | see attached |
| Albert, Kathy | It is very necessary that the Council include stronger efficiency standards that account specifically for the cost of carbon and puts the Nonhwest back on a path away from coal power. Coal creates 4... |
| Albertson, Glen R. | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Alcoa (Jack A. Speer) | On page C-14 of the Draft Plan, the last sentence states, " This total (Aluminum DSIs) includes power provided by Chelan County PUD to Alcoa's Intalco plant". Chelan PUD does not provide power to A... |
| Alter, Susan | Coal is dirty energy. Do not use coal!!! Sincerely, Susan Alter |
| Altshuler, John | I appreciate what you have done so far, but to consider coas as a major source of energy and to continue the negative alteration of our environment MUST STOP NOW! No more mountain top removal! No more... |
| Alvarado, Dr. Arlene | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Anderson, Brian M | I appreciate the work that's been done so far in the draft. It's good. It's pointing in the right direction. I would strongly encourage movement on an area that seems have been side stepped - coal.... |
| Anderson, Don | Oregon law calls for a 75-percent cut in 1990’s greenhouse gas emissions by 2050, a figure the council has determined will only be reached with a virtual elimination of coal from the power system. And... |
| Anderson, Leslie | we have wind. we have waves. we have water. we have solar power. hydrogen power is on the horizon. we don't need coal-fired plants that pollute and contribute to global warming. when greed kills our w... |
| Anderson, Lynn | The northwest is going to be growing tremendously in the next few decades, and it is extremely important that we plan for more renewable energy. I was recently in Germany for the first time, and they... |
| Anderson, Theodore L. (Tad), PhD | see attached |
| Andrews, Jim | The U.S. needs to cut its greenhouse gas emissions. In Oregon, that means closing the Boardman coal-fired generating plant. The least expensive source of new power is conservation. |
| Antich, John | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Arakawa, Clarice | Please close the dirty coal producers. We need this help with our environment, we can not put off this important issue any longer. |
| Arcana, Judith | Oregon, like the rest of this country - and the world - must stop using coal as a fuel source. You already know all the reasons, so I won't belabor them here. I'm writing to add my name/voice/op... |
| Armon, Caroline | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Armstrong, April | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| artists4action | To the members of the NPCC: I believe you are legally required to take ESA listings into account with your plan. So, I hope: YOU TAKE DOWN THE FOUR DAMS ON THE SNAKE & start accelerating your pla... |
| Artley, Dick | Dear NPCC members, The draft 6th Power Plan for the electricity needs of Washington, Oregon, Idaho, and Montana does not recognize the reality that global climate change continues to get worse an... |
| Asami, Shinya | The State and all the municipalities should seriously look into adopting pyrolysis technology which will turn all the municipal waste, including all the non-recyclable plastics and medical waste, into... |
| Bailey, Rep. Jules Kopel | see attached |
| Bain, Don | Wind Diversity The temporal diversity of production at different wind sites across the NW is a key issue which needs to be better addressed in the Plan regarding regional wind integration, utility ... |
| Baker III, David L. | I am opposed to the power plan. Salmon have been under attack in the past and now in the present. They need to be protected for us and future generations. The impact of Dams and gold mines are not ... |
| Baker, Stephen | No Coal. No short-term approaches to a long-term problem. Once spoiled, the environment and Oregon's natural beauty are gone forever.........long after the last coal is burned up. The time is ripe ... |
| Banks, Wesley | The new power plan should have a strongly support conservation of power as a resource. It should not encourage nuclear power via tax breaks or continued public support of any liabilities engendered... |
| Barnhart, Richard | Dear Sirs: Thank you for your work on increasing energy efficiency. I hope that you take a strong stance against greenhouse gases. Coal should have no place in creating more energy in the the Northwe... |
| Baumgartner Books | No more coal. Get wise. |
| Bayne, Christopher J | The notion that we have the right to deplete the natural resources of planet Earth for the convenience of our generation, and the next one or two, could be characterized as criminal. It is to be expec... |
| Bell, Daniel | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Bender, Tom | I strongly appreciate the sensible emphasis on efficiency as mechanism for meeting load projections. I urge you to take stronger leadership addressing the combined issues of global warming, peak oil,... |
| Bender, Tom | The proposed 6th Power Plan is good, with its strong emphasis on efficiency. It would be far better if existing coal plants were removed from the mix, because of their huge pollution issues and being... |
| Benner, Steven | |
| Bennett, Henry | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Bergen, Marie | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Berry, Erik | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Beschenbossel, Victoria | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Best, Richard & Wendy | To the formulators of the Draft Sixth Power Plan: We urge you to phase out coal fired greenhouse gas emissions under the Plan to match requirements in effect for the States of Oregon and Washington... |
| bettylattie@yahoo.com | The time has come for oregon and its people to choose ecologically sound power sources. Coal-fire plants do not meet that criteria. We can and must change our power sources, very, very soon. Let's... |
| Bhakti, Sara, Ph.D. | Att: Mr. Mark Walker, Director of Public Affairs Please adopt a regional power plan that emphasizes clean and green energy sources. Especially, make a truly meaningful effort to phase out coal thu... |
| Bhakti, Sara, Ph.D. | Just one coal plant - Centralia's Big Hanaford Power Plant - is generating our state's biggest cloud of global warming pollution. I encourage the phasing out of coal plants in my state of Washingt... |
| Bianchi, Don | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Birck, Kim and Bill | Thank you for the opportunity to comment on the power plan. I will make this short and sweet. Minimize coal use! Maximize use of alternative and renewable fuels. Maximize energy conservati... |
| Birkel, Steven J | I support planning that will rid our region of Coal based electricity generation. The Northwest has available many alternatives for clean, low-carbon generation - our energy generation plans should b... |
| Birnel, John | Please consider having a net decrease in emissions by phasing out the Coal Powered Plant. Our grandchildren deserve no less. |
| Bitner, Patricia | I was present at the public hearing held in Eugene Oregon on September 28. I would like to make the following comments regarding the Sixth Power Plan. Many comments on September 28 reflected conce... |
| Blade, Tina | I understand that the 6th draft of the power and conservation plan would stabilize carbon emissions by meeting virtually all of our new electricity needs over the next 20 years with energy efficiency ... |
| Blair, Linda | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Blake, Amy | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Blakely, Patrick | We need to push forward with alternative, renewable energy solutions. One idea thst seems to have marit is tidal energy. Another is wind and yet another is solar. If we don't move ahead on clean energ... |
| Blakey, Carole | It is imperative that the plan would stabilize carbon emissions by meeting virtually all of our new electricity needs over the next 20 years with energy efficiency and renewable energy. However I am ... |
| Blank, Dee | Dear Northwest Power and Conservation Council, Last winter, the snow piled up on tree branches far heavier than I have ever seen it in the 20 years I have owned and lived in this house. A lot of t... |
| Bloom, Elizabeth | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Blume, Dan | I come from North Dakota. Coal Country. Western N.D. has at least 10 coal fired electrical generating plants and many are 500 megawatts each. I am a pipefitter and have worked on most of them. ND also... |
| Bolane, Peter | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Boldt, Lana Mcgraw | Your efforts to encourage energy conservation and alternative energy sources are commendable. But it nothing more than window-dressing unless you get compliance. That will only come with the additio... |
| Boles, Shawn | It would seem to be obvious to all but the intentionally oblivious that coal is inappropriate as a basis for energy production. |
| Bonneville Power Administration | |
| Boom, Diana | Thank you for your work so far. However, the plan needs to address our use of coal. We need to reduce our reliance on coal. Please include a goal that reduces greenhouse gas emissions which can be... |
| Boring, Grit | While nations from the whole world gather next month, trying to agree on new and strickter CO2 remission standards in an effort to stop or even reverse global warming, we in Americas's Northwest ought... |
| Boucher, Samantha | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Bourcier, Lee Ann | I sure appreciate your efforts on energy efficiency and focus on renewables, but I'd also like to see those efforts fortified with a reduction in greenhouse emissions, particularly the use of coal ... |
| Bowden, Susan | Support a Strong Clean Energy and Climate Bill Dear Mark Walker, The Clean Energy Jobs & American Power Act (S.1733) is a historic step forward towards a clean energy economy that works for ever... |
| Brady, Irene | Global warming is such a drastically urgent problem that we cannot afford to consider coal or other dirty fuels as feasible power sources. Please alter your plans to allow us to eliminate coal entire... |
| Brady, Sean & Alicia | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Breen, Carol | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Brinkerhoff, Dr Merlin | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Brooks, Jon | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Brost, Patty | We need to eliminate the coal plants that produce electricity to meet the standards that have been set for 2050. These plants are producing too much of the pollution of our state to be considered "cle... |
| Brown, Jason | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Brown, Jeremy | Thank you for the opportunity to comment on this plan, which for a large part is a surprisingly progressive plan. I strongly support the components that deal with renewables and conservation, while ad... |
| Brownstein, Richard J. | The Council should address the continued and future use of coal in the region and make recommendations for its use to be eliminated as soon as pracicable |
| Bruner, Linda | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Bruner,Jean | via voicemail, see attached |
| Buchner, Scott | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Buhl, Carolyn | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Burgard, Donald | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Burgard, Donald J. | No coal - eventually - please. Emphasize energy conservation, efficiency, and renewable energy sources - immediately - please. Measure energy cost by accounting for the price of carbon emissions - i... |
| Burkhart, David | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Burkholder, Bob L. | Please include the following comments in the record of the Public Hearing for NPCC's Six Draft Power Plan: Remember to take in account the fact that over the centuries millions of salmon and steelh... |
| Burwell, Julia | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Butler, Judy | We cannot risk being wrong on this issue. We must reduce our carbon emissions now. 350 parts per million is what many scientists, climate experts, and progressive national governments are now saying... |
| Callaway, Phillip | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Callison, Rhonda | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Camp, Tracy | I am writing to urge the council to include a clear path for reducing the regions dependency on fossil fuels and in particular coal power generation as a base-load component. We will continue to have... |
| Campbell, Merle & Mary | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Caplan, David | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Carey, Catharine | I support clean energy, specifically the development and use of alternative and renewable energy sources, conservation, and energy efficiency. I strongly oppose increasing the supply of low-cost elec... |
| Carey, Robin | Council Members: Couldn't make the hearing, but want you to know that, in my view, global warming is a much, much bigger deal than people at the moment believe. Most of us are still comfortably i... |
| Carlson, Caitlin | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Casacky, Teresa | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Chapin, Anthony | The primary objective in energy efficiency goals is the reduction of pollution. Let's remember that while creating new policy. Let's create policy that gives us the quickest road to clean energy. ... |
| Chapman, Ted | I will make this brief and simple: Oregon's energy future should involve the cleanest energy sources possible (as should the nation's and the world's). Obviously, the elimination of poluting types of ... |
| Chase, Pamela | " I want the Council to take steps to phase out Coal Power, cut Co2 efficiency, and include stronger efficiency standards." |
| Chetwood, William E. | There must be adequate considerations for the passage of fish to their historic spawning grounds and a open passage back to the ocean. If there is no workable provision for this, that works, then rem... |
| Chick, Yvonne | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Christ, M'lou | A good start, but you forgot to declare that we must get rid of the coal plant in our energy source mix. It's just too bad for the environment. Increasing conservation is great, adding some new alte... |
| Christensen, Ann | Thank you for this opportunity to comment on Draft Sixth Power Plan. You are moving in the right direction by using conservation and renewables and phasing out coal plants. I urge you to go further. A... |
| Christensen, Tom | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Cilimburg, Amy | November 5, 2009 I would like to comment briefly on the draft 6th Northwest Power and Conservation Plan. I attended the hearing for the Northwest Power and Conservation Council meeting in Missoul... |
| Cimo, Bonnie | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Citizens for Clean Energy, Inc. | Dr. Walker, Thank you very this great opporunity to provide comments. My name is Lt. Colonel (retired, US Army) Richard D. Liebert, chairman of Citizens for Clean Energy, Inc., a diverse grassroot... |
| Citizens Utility Board of Oregon | Meeting with Bob Jenks and Jeff Bissonnette, Citizens Utility Board of Oregon. Melinda Eden and Joan Dukes, NPCC Main subjects discussed: --Public hearing held in Portland on 10/14 --Draft Six... |
| citizenvern | It sounds like the latest energy plan is great! Awesome. I do think we need to form some sort of plan for weaning ourselves off of coal though. Thanks for all of the great work though! |
| Clark, James | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. As a previous commercial salmon fisherman, the health of the local salmon runs is an important i... |
| Clark, Pamela | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Clawson, Chip | Please focus on conservation and renwable energy and include as little coal as possible. |
| Claypool, Lynda | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Clough, Dr Bradley | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Coal Free Northwest | We applaud the Northwest Power & Conservation Council for creating an energy roadmap that shows how we can meet our energy needs over the next 20 years with no increase in greenhouse gas emissions. Bu... |
| Coal Free Northwest | See attached cards. |
| Coatney, Jeremy | I honestly appreciate that you are trying to increase energy efficiency and focus on renewable energy sources, but we need strong measures to reduce greenhouse gases. Set legislation to reduce gree... |
| Cody, Ben | There isn't much more important than saving salmon, this should take priority over the needs of the power industry. Take out dams, restore habitat. |
| Cole, Kathleen | Dear Council, I have been closely following the work that your commitee has been doing this year to conserve our NW resources and meet future energy needs. I hope that in the weeks ahead, that you ... |
| Coleman, Bill | Sir; There is absolutely no proof that greenhouse emissions affect global climate. Until the time that this can be proven beyond doubt, and during this difficult economic period it would be nothin... |
| Collings, Dustin [Shane] | dear Person, thank you for empowering people who want clean energy; we adore what you [are] doing! |
| Collison, Sharon | Short term greed should not be allowed to lead to long term destruction. There is NO CLEAN COAL. I already have asthma and find it hard to breathe. Please stand up for people now and stand up for t... |
| Collison, Sharon | " I am an asthma sufferer and I live in Oregon, and I want the Council to adopt a clean Power Plan. I would like us to get the "clean" gasoline that the other states receive. Since under George W. w... |
| Columbia Energy Partners LLC (Peter Blood) | |
| Conger, Kurt | Proceed carefully and perform both capacity and energy calculations with integrity. Do not over simplify the task of balancing instantaneous demand and production. Commenters who would quickly abandon... |
| Connor, Michael | Great Plan, BUT, here's what's needed: NO COAL!!! NO NUCLEAR!!! Be patriotic Americans and switch to SOLAR Distributed Generation. |
| Cook, Donald | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Cooper, Katherine | You have done wonderful work towards Oregon's future. Please look again at the use of Coal in this plan. We can find a better option for our children and grandchildren. Thank You Katherine Cooper |
| Corbin, Linda | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Corelli, Nina | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Corey, Margie | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Cosimo, Rosario | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Couche, Stephen | Dear Walker, The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energ... |
| Cox, Ellen | I am writing to request that the NWPCC's final plan provides for the following: --Preserves strong energy efficiency and renewable energy targets --Sets goals to reduce CO2 emissions in the re... |
| Cox, Thomas | The NWPPC should do everything within its power to eliminate power sources that are major creators of greenhouse gasses, and replace them with green, renewable alternatives. The Centralia coal=powere... |
| Craig, Edward | We are the generation that gets to pay for the excesses of our forefathers. We get to see the predicted dire consequences bear fruit and kill our children. We get to see the climate change our elders ... |
| Crawford, Noelle | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| CREDO CitizenLetter | CitizenLetter attached plus list of addressees who sent it. |
| CRITFC | |
| Cronin, Darcy | I want to take a moment to let you know how important it is to my family to stop using dirty coal power in Oregon. I want my children to rely upon cleaner energy sources. I understand that economics a... |
| CTUIR DNR | |
| Cuevas, Nicole | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Current, Jon | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Currey, C | Coal IMO should receive NO SUBSIDY at all. Let the coal industry sink or swim w/o "socialism" and "welfare" as it wants private individuals to do. If there is to be subsidies, then they s/b going ... |
| Curtis, Colleen | No Coal |
| Dahlgren, Mr. Shelley D., PhD | Fossil fuels have to go, and the sooner the better. Coal especially is a huge polluter. The global warming and ocean acidification caused by burning coal and oil are well documented. I personally ... |
| Dana, Sam | Increasing energy-efficient does not equate to reducing carbon emissions, it just reduces demand from current (historic) uses. Overall demand continues to increase as new demands, such as powering ele... |
| Darienzo, Mark | I appreciate your efforts on energy efficiency and focus on renewables, but would like to see those efforts fortified with a reduction in greenhouse emissions. |
| Darsonval, Lisa | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Dave Krick/Greenworks Idaho/Sustainable Community Connections of Idaho | Northwest Power & Conservation Council: Thank you for the opportunity to give feedback on the 6th Power Plan. Things being normal, this plan is aggressive if not historic as compared to previou... |
| David, Williams | I think that its way past time to evolve past the dark age'es and start producing our energy in a more sustainable manner. Coal is only cheaper because they don't include all the cost associated with ... |
| Davidovich, Nadia | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Davis, Albert | Mr. Walker: I do not want to see enforced conservation as has occurred in certain other states. While developing better energy efficient devices for heating and cooling is very desired, the public ... |
| Davis, Joan | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Davis, Mr. Galen | To the members of the NPCC: Thank you for the opportunity to provide input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. Its proposal to meet all new demand for el... |
| Dawson, Elizabeth | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Day, Richard A. | Dear NW Power and Conservation council, I believe that we need to be even more agressive in moving away from coal as a supplier of future energy needs and toward natural gas, an available in USA sour... |
| DeJohn, LeeRoy | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Deldin, Ellyse | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Delleney, Katherine | Please stop ignoring the elephant in the room...COAL. Please make your good plan GREAT and have an exit strategy for our coal dependence. We cannot live another 21 years with the massive emmissions ... |
| Deniro, Elizabeth | I strongy support the removal of the lower 4 dams on the Snake River, and the healthy wild salmon provisions. The NPCC's Draft 6th Pwer Plan provides for meeting the power needs of the people and busi... |
| Detman, Thomas R. | Sometime during the 1970's, Saudi Arabia's oil minister, Sheikh Ahmed Azki Yamani, reportedly said: "The stone age did not end for lack of stone, and the oil age will end long before the world runs ... |
| Dettmann, James | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| DeVagno, Joan | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Devine, Robert | Dear Northwest Power and Conservation Council, From what I hear, the sixth draft of your future power plan for the Northwest is an enormous improvement in terms of moving our region from fossil fue... |
| Dianne, Ensign | To the members of the NPCC: The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand for electricity in the Northwest with conservation and renewables is excellent... |
| Dickenson, Rep. Sue | As a legislator and a citizen very concerned about climate change, I applaud the council's recognition of energy efficiency and conservation as the first fuel and see the possibility of having many me... |
| Dickie, Bruce | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Dickie, Bruce | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Digman, Joe | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Donnelly, Pete | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Donofrio, Mac | Preserves strong energy efficiency and renewable energy targets Sets goals to reduce CO2 emissions in the region—three states in the region have already done this Phases out coal-fired power plants ... |
| Doty, Edward | Please adopt a clean regional power plan. |
| Dougherty, Janet | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Dougherty, Mary Ann | Mark Walker, Director of Public Affairs Northwest Power and Conservation Council, I'd like to thank the Council for its work on the Power Plan. However I believe that our dependence on coal must b... |
| Douglas, Aaron Kirk | I'd like to have someone connect the dots explaining to me how we are going to burn coal at the same time we are drastically reducing our greenhouse gas emissions? Something has to give: it should be... |
| Douglas, Joan | We need to put saving the salmon/steehead from extinction as a top priority. I would pay more for power if we removed dams to support this desire; even during these tough economic times. This fish is... |
| Doulis, Tom | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Dowd, Cristin | IF NOT NOW; WHEN? THE DOOR TO OUR FUTURE IS CLOSING; ARE WE GOING TO STAND BY AND WATCH IT CLOSE? PLEASE HELP BUILD A SMARTER FUTURE FOR OUR COUNTRY. |
| Doyle, Lynn Patrick | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Drahos, Janice | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Drais, Daniel | see attached |
| Dray, Patricia | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Driese, Maureen | time is of the essence now we cannot afford to wait to get to acceptable carbon levels for the planet Oregon has traditionally been viewed as the "environmental state" we must keep this tradition... |
| Drissell, Eric | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Duehren, Derrick | Please make plans to shut down the Boardman coal plant within 5 years. The Earth can take this level of polution no longer. |
| Dukelow, Dianne | Please keep coal outand greener in |
| Duncan, Angus | See attached |
| Dunham, Janet | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Dunn, Laura | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Early, Dr. Kathie | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Easterday, John | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Ebel, Kevin L | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Edith, Wyrick | We can't afford to continue our dependence on coal as an energy resource. It produces 23 percent of the region’s electricity but spews out 87 percent of the region’s pollution. The Northwest Power ... |
| Edwards, Karin | Please consider the impact of coal pollution as you decide the future of green power. Thank you! Sincerely, Karin Edwards |
| Eggen, Carol | it's not good enough to stablise emissions, we need a plan to significantly reduce them and that means phasing out the use of coal to supply energy. In addition to conservation there are clean energy ... |
| Ellersick, Steve | Where is Dixie Lee Ray when we need her? We need an engineer, scientist leader to create a plan and implement nuclear power again in the Pacific Northwest. I see no such planning in the 6th draft, w... |
| Ellis, Joell | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Energy Northwest | Please see PDF attachment. |
| EnerNOC, Inc. (Melanie Gillette) | Dear Mr. Walker and NWPCC Staff, EnerNOC, Inc. appreciates the opportunity to provide some brief comments on the Council's Draft Sixth Power Plan (Sixth Plan). We have actively participated in the ... |
| Erickson, Keith | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Estes, Wayne | Please take this present planning opportunity to fully end use of coal in the Pacific NW. Wayne Estes |
| Esteve, Gregory | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Estrin, Mildred | The 6th Power plan needs to incorporate much more alternative energy options than it presently does.This will save consumers money and help restore much needed salmon habitat. |
| Eugene Water and Electric Board (EWEB) -- Bill Welch and Jason Heuser | TO: The Northwest Power and Conservation Council FROM: Bill Welch and Jason Heuser DATE: November 2, 2009 SUBJECT: Comments on the Draft Sixth Power Plan Conservation Targets EWEB... |
| Evanoff, Renee | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Eventoff, Franklin | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Eventoff, Franklin | It’s critical that ensure the Council approves a final plan that provides the region with a path to meet growing power needs, wean us from dirty coal, bring endangered salmon and steelhead back from t... |
| Faget, Crispin | I GATHER THE COUNCIL WILL STABILIZE CARBON EMISSIONS. THIS IS AN IMPROVEMENT BUT NOT ENOUGH. IT IS IMPORTANT TO TARGET A REDUCTION IN CARBON EMISSIONS. |
| Falk, Karen | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Farrell, Dr. David | The plan needs to go further. The million-ton elephant in the council’s room is coal, which produces 23 percent of the region’s electricity but spews out 87 percent of the region’s pollution. The draf... |
| Fay, Mary | Thanks you for this opportunity to comment on the proposal for energy policies. First, set strong goals to reduce Co2 emissions.One way to reduce is to phase out all coal-fired plants. Acccount... |
| Feder, Melanie | " I would like the COuncil to adopt a Power Plan that includes stronger efficiency standards and to cut cO2 emmissions and reduce our dependency on coal." |
| Ferguson, Zachory L. | Concerned Parties, There was a time and place for coal in this nations energy policy. It ended on the east coast with the nineteenth century. Too long have greedy energy companies foisted popular myt... |
| Findling, Sharon | There is NO such thing as clean coal. |
| Finnell, Daralene | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Finnell, John | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Fisher, Laurie | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Fitzgerald, Liam | PLEASE create a strong plan that responsibly ends our reliance on coal. We need a plan that reduces pollution, puts a price on carbon emissions and has the strongest energy efficiency targets possibl... |
| Fleisher, Marc | Thank you for the opportunity to provide my input on the 6th Power Plan. It's OK as far as it goes but it could be immeasurably strengthened by a greater emphasis on what is good for salmon, on the on... |
| Ford, Walter E. | Is the US ever going to build some of the new "Green" Nuclear Power Plants at Hanford? And if so When? |
| Forrest, Kim | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Forsyth, Carolyn | While the draft plan does a good job at emphasizing conservation and renewables, it stops short of fully realizing Oregon's potential to drastically lower its greenhouse gas emissions by shutting down... |
| Foster, Jackie | I hope the plan will preserve strong energy efficiency and renewable standards and phase out coal-fired power plants. |
| Foster, Randy | We do not need more coal fired power, we need more solar and wind generated power, and more research for wave technology. Coal is outdated and dealdy. It also destroys the land it is removed from whic... |
| Franklin PUD | |
| Franklin PUD | As we discussed I'm sending you the language I quoted for my comment. The Draft's language is currently as follows: CONS-11. In recognition of the higher goal for industry-sector conservation,... |
| Franklin PUD | Hi, I was happy to see the comments of Tom Karier in PNUCC Report Sept 3 and Sept 9. I am glad to see Mr. Karier realizes the consequences if California utilities are allowed to unbundle wind generat... |
| Franklyn, Gregory | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Freeman, Douglas | Coal produces 23 percent of the region’s electricity but spews out 87 percent of the region’s pollution. Oregon law calls for a 75 percent cut in 1990’s greenhouse gas emissions by 2050. This figure w... |
| Fugere, Angie | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Fulghum, Christian | Thank you for this opportunity to comment. Please consider the long term effects of your decision. It is important that as the stewards of the environment which sustains us, we think not only in te... |
| Furlong, Roger | This is in reference to the Draft Sixth Power Plan. I'm strongly in favor of a plan that: * Includes strong energy efficiency and renewable energy targets that remain unchanged * Sets goals to... |
| Gagnon, Ronda Lee | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Galbraith, Susanne | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Gamba, Mark | Greetings, Unfortunately I will be unable to attend your hearing in Seattle. It is very important to me that as you look to the future you are very clear on the critical issues. As a race, a nation... |
| Garcia, Tony | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Gardner, Ben | Clean energy is important for America's future. Not only from an environmental stand point, but also from an economical one. Simply investing in clean energy will lend to it's growth providing me clea... |
| Gazzuolo, Michael | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Gearry, Marceline | There is no such thing as clean coal. Don't bring it into Oregon. |
| Gehe, Graham | energy derived from coal is neither clean nor green. |
| Gehring, Wendy | Make coal obsolete. |
| Geldaker, Carol | I would support action to take out our use of coal. It seems that I have heard the pollution of the coal plant has been identified. The company wants extensions, exceptions etc. In the meantime, th... |
| Gendvil, Derek | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| George, Barton | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Geren, Don | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Gessaman, Kathleen Z. | Dear Council Members: The plan to meet new electricity needs over the next 20 years with no net increase in greenhouse gas emissions and no new fossil-burning power plants is admirable. The dra... |
| Giese, Mark M | I support the plan moving away from any new fossil fuel production. I support the move to energy efficiency and renewable energy as the resources of first choice in the region. While the draft ... |
| Gilbert, Toni | Do all you can to cut carbon emmissions. The survival of the planet is at stake. Toni |
| Gilleon, Laurie | Please help ensure a clean energy future for the Northwest. Make sure that the NWPCC’s final plan: Preserves strong energy efficiency and renewable energy targets Sets goals to reduce CO2 emissi... |
| Gimre, Kerensa | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Ginn, Judy | I understand that your plan will stabilize current emissions but not actually reduce emissions. While I applaud what the plan does and how difficult it must be for you to do this, I strongly urge you... |
| goldsmith, dell | Dear Staff: A focus on renewable energy is, of course, the thing to do but we need to stop burning coal if we and many other living things are to survive on our fragile planet. Please cut your ties ... |
| Gols, L | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Goot, Yvette | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Gordon, Ingrid | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Gordon, Julia | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Gould, Laura | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Gracey, Erik | Dear NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand for electricity i... |
| Grant, David | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Grant, Jeannette | It is time for you to cut your ties to coal for electicity, there is entirely too much polution from using coal and we must lower all these sources if we and generations following have any chance of c... |
| Graser-lindsey, Elizabeth | My family has been following the climate change and peak oil issues carefully and we observe that the science of the situation indicates that WE NEED TO TURN AWAY FROM COAL NOW if our children are to ... |
| Gray, Jana | I'd like to see the State of Oregon generate it's power from Wind, Solar and other renewable sources, and not build any more new Coal plants. |
| Griffith, Jennifer | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Gritzner, Ingeborg | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Grob, Diana | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Groh, Jan | I strongly believe that we can meet all of our power needs now and in the future without the Boardman Coal plant (or any coal) in the mix. We can do this through a combination of new green technologie... |
| Grossman, Ellen | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Grove, Darlene L. And John D. | To: Northwest Power and Conservation Council From: Darlene L. and John D. Grove PO Box 77 Stevensville, MT 59870 406-777-2423 We appreciate the opportunity to comment on the futur... |
| Gunderson, Eric | I urge the Northwest Power and Conservation Council to eliminate coal from its plan for future power generation. There is absolutley no way we will meet goals for reduction of greenhouse gas emission... |
| Guth, Dorothy | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Guth, Robert | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Halbedel, Tricia | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Hall, Camille | Please cleanup our existing coal power plants, such as the one currently operating in Boardman, OR. Soot from this plant clogs the airways in Portland, leaving soot and ash on cars and patios as far s... |
| Hall, Jessica | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Hall, Jewel | Now, not in the year 2030, is the time to start planning our exit from a coal-dependent energy policy. It's time to make a good plan great. |
| Hall, Michael | I laud your efforts to promote energy self-sufficiently through the increased use of renewable resources. This is much appreciated! Nevertheless, to help Oregon reach its 2050 emissions reduction t... |
| Hamilton, Roger (Western Grid Group) | see attached |
| Hanks, Laura | It's totally ridiculous for Oregon to rely on coal power, when we have ample wind, water & solar resources. Phase out Boardman, starting now! |
| Hannah, Roger | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Hansen, Carol | Work and plan for the future. Clean energy now. Please do everything technologically possible to protect our air and water and reduce global warming. Thank you. |
| Hansen, Carol | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Hanson, Duane | Hey Guys, Let's all be serious here. The decisions arrived at now will affect the future directly and severely. Will it be cuts in pollutions WE KNOW are killing the very planet we rely o... |
| Hanson, Lynn | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Hardt, Dr. Mark | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Harmon, James | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Harris, Bruce | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Harris, Chris | It's time to get real about the future ... and coal is NOt it! |
| Harvey, Barbara | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Hatch, Nick | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Hausrath, Alan | Dear Northwest Power and Conservation Council, I'm writing to comment on the Draft Sixth Power Plan. First off, thank you very much for producing a forward looking, conservation and energy efficie... |
| Hawkinson, Colby | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Hayden, Bobby | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Hayes, John | Northwest Power and Conservation Council: Thank you for your outstanding effort regarding energy efficiency and a new focus on renewable sources. I hope you will agree that this is the appropriate ... |
| Hegg, Nancy | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Heinkel, Lisa | ---------------------------------- To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. I... |
| Hekate | I congratulate the Council members on their excellent plans to stabilize CO2 emissions through intensive energy conservation. That is a good beginning. However, the commission's plan fails to addres... |
| Helgeson, Kathryn | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Helgeson, Les | Given the tremendous investment in "green power" in the norhtwest, it makes little sense to continue operating pollution spewing coal plants. |
| Henderson Jr, Edward M. | see attached |
| Hendin, Judith | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Henken, Jim | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Herbert, Emily | Because of the majority contribution to CO2 production from coal, it is time to remove coal from the future mix of energy sources in our region. Please take this on directly and rule out coal in our ... |
| Herron, Matt | see attached |
| Heumann, Michael | see attached |
| Hewitt, Pam | |
| Heydenreich, Robert A. | I do appreciate that the power plan includes provisions for energy efficiency and renewable energy. These are important features. However, I would like to see you go a step further by phasing out be... |
| Heyneman, Amy | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Hiestand, Kathryn | Dear Northwest Power and Conservation Council, I am writing to you as a person concerned for the future of clean air and water. As guidelines are made that launch our decisions for energy sources and... |
| Higgins, Marvin | To the Northwest Power and Conservation Council. We are asking you all to give you full support to measures that will significantly increase the use of clean, renewable energy (such as wind and solar... |
| Highlow, Percy | via voicemail, see attached |
| Hine, Patricia S. | Dear Council Members, There's no time to waste here. Please get serious and be PROACTIVE about getting us off oil-based energy. We have the technology and the will. This is big opportunity for the ... |
| Hirsch, Robin | It is time to progress forward with clean energy and job stimulus in the non polluting energy industry. We now have an administration that is environmentally concearned and could assist without bow... |
| Hixenbaugh, Brenda | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Hlavna, Robert | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Hockley, Len | We need to get rid of coal burning power plants as soon as possible. |
| Hodges, Thomas | I want to urge Director Walker to adopt a clean regional power plan. |
| Holloway, Kathleen | Good work on your energy plan for the Northwest but you need to more agressively work to reduce energy generated by coal. Any forward-thinking plan needs to address the issue of coal-fired plants. T... |
| Hopfenbeck, Paul | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Hopkins, Tom | I'll be short. It is important that the Power & conservation plan take the elimimation of coal fired power generation in Oregon into consideration. Cheap is expensive in terms of pollution and the r... |
| Hopper, Janelle | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Horn, Darryl | Firstly thank you all for your efforts on behalf of myself, my family, and Oregon. I find it inspiring the task you have taken up and faced and will overcome. I pledge my support and want you to know ... |
| Houck, Kendall | While there are many admirable goals established in the current Draft Plan, it still relies far too heavily on the continued use of coal fired electrical plants. Any 20 year planning document for the... |
| Houston, Abigail | " I would like to urge the Council to adopt a clean regional power plan." |
| Howe, Marty | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Hoyt-mcbeth, Stephen Michael | Dear Mr. Walker, Thank you for the opportunity to comment on the NW Council's Draft Sixth Power Plan. While I applaud the Council for its aggressive energy efficiency targets, I think the plan coul... |
| Huffman, Vernon | We should be planning for the end of using nonrenewable resources, like coal and uranium, to generate power. Conservation of electricity can go a long way, especially if we use direct sun for heat - s... |
| Huffman, Vernon | To do our part to sustain human life on Earth, we should aggressively work to meet all our needs from renewable resources without disrupting natural cycles. This means a dramatic change in American li... |
| Hughes, Randall | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Hull, Doree | I am really disappointed that the Pacific Northwest, land of abundant hydro-electric power, is still involved with the production of electricity with coal. It is time to move away from this polluting ... |
| Hunt, Dennis | In order to bridge the gap to future energy independence, we must build clean nuclear power plants, and use available resources such as coal and gas today. If we drive up the cost of energy now, that... |
| Hunter, Christopher | As a concerned citizen of Oregon I appreciate the Northwest Power and Convservation Council's efforts on energy efficiency and focus on renewables but would like to see those efforts fortified with a ... |
| Hurd, John | Uranium 238 (U-238) is a principal ingredient in the nuclear cycle. It is subject to "chain of custody" in that it must be sequestered from human contact. At issue is just how long it might be poss... |
| Hutchison, Susan Povey | NO MORE COAL !! |
| Huth, Kyle | see attached |
| Huth, Kyle | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Hutton, Ms. Robbie | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Idaho Conservation League | |
| Idaho Consumer-Owned Utilities Association | 11/5/2009 Comments on 6th Power Plan by the Idaho Consumer-Owned Utilities Association: Dear Council Members, The Idaho Consumer-Owned Utilities Association (ICUA) represents 14 rural elect... |
| Idaho Falls Power | |
| Idaho Power Company | |
| Ignatovich, Cynthia M. | Please do everything you can to save the salmon! I grew-up in Oregon and it is just tragic what has happened to our salmon. Save the salmon is important to Oregon's economy and the health of all of Or... |
| Independent Economic Advisory Board (IEAB) | See http://www.nwcouncil.org/library/ieab/ieab2009-3.htm |
| Industrial Customers of Northwest Utilities | |
| Jackson, Jeff | While the draft plan has some good elements, it needs to be strengthened. The plan should reflect the best and latest climate science and be tailored to meeting regional carbon-reduction goals. The ... |
| Jacobs, Nikki | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Jaffee, Daniel | To the Council: I am writing to urge you in the strongest possible terms to eliminate coal from any new power planning for the Pacific Northwest. While I strongly appreciate your good work to dat... |
| Jankowski, David | In a "Petro-Dollar" economy its really REALLY hard to preach non-scarity and abundance, but, I know so c alled "free" energy s the reality. The early scientists of elestromagnatic theory Maxwell and... |
| Jarvis, Heidi | I live on Whidbey Island in the state of Wa. It is truely a special place. Part of what makes the area so beautiful is the overall abundance of nature's bounty. Part of that is the knowledge that the ... |
| Jatul, Chris | I'm impressed with the idea that we can save 58% on our need for more energy through efficiency. I support the goal as well as going with wind and natural gas instead of coal. Why is there no mentio... |
| Jenner, Maureen | 1)Bravo NW Council for the plan moving Idaho away from any new fossil fuel production. 2)I support the move to energy efficiency and renewable energy as the resources of first choice in the regio... |
| Jennings, Gerry | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Jimenez, Ben | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Johns, Bill | It used to be that available power drove the NW economy especially eastern Washington. New power sources were agressively sought and developed. Now your plans call for less energy use and the use of u... |
| Johnson, Maile | We urgently need an energy plan that switches us off dirty coal, restores salmon and steelhead runs, electrifies transportation and helps to reduce growing power needs, while meeting them. |
| Johnson, Mark | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Johnson, Michael | A little honesty would be appreciated here. There is no such thing as clean coal, and likely never will be. Even though we have lots of the stuff, that doesn't change that reality. It's time that s... |
| Johnstad, Mark | This plan should focus upon four priorities. 1. Improve energy conservation; 2. Support renewable energy production; 3. Make certain that any increase in renewable energy production is mat... |
| Johnston, Holly | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Jones, Jill M. | As a citizen of Washington State who is concerned about my children's future, I helped collect signatures for the green energy initiative. I also grew up attending a school that sat in the shadow of a... |
| Jones, Nora | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Jones, Stephen R And Elizabeth | Please take action to stop the expansion of the use of coal. It is imperative that we limit carbon dioxide emissions if the planet and is to survive. We must do this for our children and grandchildr... |
| Joos, Sandra | The draft power and conservation plan from the Northwest Power and Conservation Council is a good start. Your work is appreciated, but is not finished. The plan needs to go further by including a pla... |
| Joos, Sandra | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Joos, Sandra, PhD | I applaud the fact that the draft plan would stabilize carbon emissions by meeting virtually all of our new electricity needs over the next 20 years with energy efficiency and renewable energy. ... |
| Joyce, Mary Anne | t is tiem to stop using coal and reduce greenhouse gases. |
| Kail, C.A. | Although it may have been a bit of a financial hardship, most people across the U.S. (the wealthiest country on Earth) continued to buy gasoline for their vehicles even when the price per gallon nearl... |
| Kaiser, Deborah | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Kaiser, Robert | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Kallas, John | Dear Mark, Please do anything it takes to keep coal and other CO2 energy sources out of future energy generation plans. We should be moving in the direction of energy conservation and clean source... |
| Kameenui, Brenda | I attended the NW Council hearing in Eugene, and I was pleased by the emphasis on conservation. Thank you for your work. My great hope is that the Council will further Oregon's move to clean energ... |
| Kameenui, Brenda | I submitted a comment but forgot to mention the extremely important notion of protecting wild salmon. The final NW plan needs to address this crucial issue. Scientists conclude that removing the fou... |
| Kane, Tom | |
| Kaser, Sam | 1. WE MUST TEAR DOWN AND IGNORE OBSTICALS ( NRC ) AND FORGE AHEAD WITH NUCLEAR POWER AND ADD NUCLEAR TO OUR FUTURE PRODUCTION PLANS. 2. WE MUST PRESERVE OUR EXISTING DAMS, AT LEAST UNTIL NUKES HAVE... |
| Kaufman, Laura | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Kaye, Leslie | I want this energy plan to be clean, efficient and green. There are no longer ANY viable excuses for this to not happen! I absolutely support the building up of wind power plants; I absolutely desire ... |
| Keebler, Wesley | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Keele, Van P. | see attached |
| Kempster, Brent | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Kendall, Kay | Please adopt a clean regional power plan. |
| Kennedy, Charles | I appreciate your efforts on energy efficiency and focus on renewables, but would like to see those efforts fortified with a reduction in greenhouse emissions. I believe a carbon tax should be placed ... |
| Kerlick, David, PhD | see attached |
| Kersting, John | Hello, Thanks for the opportunity to comment on our future energy plans. As a concerned consumer, former journalist, social studies teacher and parent, I urge you to take a long view on developing... |
| Key, Nuin-tara | I support the recent draft power and conservation plan which outlines a comprehensive vision for the next 20 years and I support the council's vision for meeting our region’s rising electricity demand... |
| Keys, John E. | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. Please do more to help recover Salmon! The 6th Power Plan is, in many respects, a good p... |
| Kincaid, Lois | I have perhaps a unique perspective on pollution in Oregon. Last Wednesday I was with my hiking group at Cloud Cap, 7000' or more elevation, on the east side of the Mt. Hood. We could see many of th... |
| Kincaid, Patricia M | You have done a good job on your vision of the next 20 years. Thank you. I am concerned about coal plants. Coal produces 23 percent of our region’s electricity but spews out 87 percent of the ... |
| King County, Washington | To the Northwest Power and Conservation Council: Please see attached letter offering comment on the Draft Sixth Power Plan, submitted on behalf of King County Washington, by Executive Kurt Triplett... |
| King, Carolyn | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is generally a good plan. The proposal to meet all new demand for electric... |
| King, Marina | I urge the Northwest Power and Conservation Council to take a stronger stand than just staying the course on emissions due to our power usage. We need to cut greenhouse gases and particulate pollutant... |
| King, Sara | Hello, As someone who is very concerned about global warming and our carbon output, I would like to see this plan strengthened in the following ways: (1) Increase Energy Conservation. (2) The... |
| Kintzele, James | Dear Ladies and Gentlemen of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all ... |
| Kirchner, Roger | Keep up the good work. |
| Kirkham, Jesse | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Kish, Lester A. | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Klebl, Susan | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Klempel, Rachel | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Klopp, Mrs. Basey | RE: Draft 6th Power and Conservation Plan I am writing to urge you to create a final plan that provides our region with a path to meet growing power needs, wean us from dirty coal, bring endangered... |
| Klure, Justin | Attached please find comments submitted on behalf of Pacific Energy Ventures. |
| Knapek, Kevin | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Knapp, Kristan B. | Thank you for the opportunity to comment on your draft Sixth Power Plan. I appreciate your attention to renewable resources and energy conservation as the foundation for a sustainable energy future. Y... |
| Knight, Katie | The time to rely on coal as an energy source is past. We need to phase it out asap because the greenhouse gasses are threaten to destroy the habitability of our planet. Reduce CO2 emissions by sett... |
| Knodt, Michael | I am writing in the hopes that the NWPCC 20 year energy plan 1 will enact actions which reduce carbon emissions. Merely stabilizing pollution is not enough to avoid the severe impacts coal power plan... |
| Kohler, William Lee | Ultimately Solar Power Satellites are the only limitless and non polluting source of electricity that we can develop and that can supply the worlds energy needs without producing warming. It's an ide... |
| Kohout, Carolynn | "Clean Power can profitably become economically advantageous by partnering solar equipment businesses with city and county government to attach solar panels on all civic buildings. This means schools... |
| Kohout, Carolynn | "The system needs to build their own wind mills/wind machines like those that were put to use in CA. It is important to reconfigure our power sourcing to put in place alternate ways of energy using t... |
| Koller, Carson | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Komisar, M. | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Konigsberg, David | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Korenko, Dr. Michael | I am troubled by the lack of recognition in this report of nuclear power. Hydro-electric, wind, solar and nuclear are the old green options. The dams are limited to their current capacity, solar ... |
| Korter, Sharon | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Kovalicky, Tom | Lets take a good hard look at Habitat instead of Hatcheries, and couple that with the Electricity producing technology of the future. We can have both....... tom Kovalicky |
| Krasnowsky, Frank | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Krochmal, Greg | Coal power as we know today is very dirty and contributes to a lot of negative greenhouse problems that we cannot afford to continue for us or our grand children and their grand children, it must be s... |
| Kruer, Curtis And Stephanie | We ask that you ensure a clean energy future for the Northwest by requiring that the NWPCC’s final plan: 1. Preserves strong energy efficiency and renewable energy targets 2. Sets goals to reduc... |
| Krumper, Michael | It would be very desireable to invest in the development of wave power off the Oregon Coast. It is also desireable to decrease the use of coal because of its high carbon emission. Were new carbon scri... |
| Kundiger, Marjorie | We need to take serious Action now. No nuclear power plants until we have a safe place for waste-not just promises. |
| Lagergren, Ginna and Ken | Subject: Sources of Power Please decrease, (even more than planned), the use of fossil fuels and nuclear energy. Please use more solar and wind and geothermal to make power. Also, please encourage ... |
| Laieski, Caleb | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Laitner, Larry | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Lamar, Dylan | It is reassuring that the Power Plan is taking such a firm stance in recognizing energy efficiency as the least-cost option to decrease energy demand. I urge you to go further to draft a plan whic... |
| Lamb, Eli | Mark - I strongly feel we need to be more proactive in reducing our use of coal. Recent developments have opened up new reserves of natural gas that leads me to believe we can rely upon it as a transi... |
| Lane, David | Oregon law calls for a 75-percent cut in 1990’s greenhouse gas emissions by 2050. If we are to reach that goal, we must start now to wean our power industry off of the use of coal. Please chart a co... |
| Lanoff, Howard | Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand for electricity in the Northwest... |
| Lanskey, Marcus J. | I applaud your goal of meeting all new electricity needs over the next 20 years with no net increase in greenhouse gas emissions and no new fossil-burning power plants. In particular, with the aggress... |
| Lara, Peggy | Dear Mark Walker, While I certainly appreciate your efforts on energy efficiency and focus on renewables, I would like to see those efforts fortified with a reduction in greenhouse gas emissions, par... |
| Larco, Dorothy | Dear Me. Walker: For a number of years I've been paying something like $7 a month extra on my electric bill in order to support Portland General Electric's investing in solar and wind power. Obviou... |
| Leach, Elizabeth A. | Mark Walker Director, Public Affairs Northwest Power & Conservation Council Portland OR Dear Mr. Walker and Council, Please do not consider coal as a source of energy in the future. Coal is a ... |
| Leary, Victoria | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Legry, John | We can’t afford the fiction of “clean” coal anymore. Coal is dirty. It cannot be cleaned within the foreseeable future by any known technology - all lies, wishful thinking and futuristic theory cert... |
| Legry, John | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Lehman, Eric | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Leinova, Avery | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Lesley, Dawn | Please strengthen this plan's emphasis on a statewide transition away from coal, starting right away! Coal is not the future, and so-called "clean coal" is an oxymoron, just ask the folks living near... |
| Levin, Brian | Future generations deserve our attention to the details that will impact their lives. |
| Lewis, Bob | We should continue to use coal. It is plentiful and efficient! Coal is a great fuel and until we can get nuclear power plants past the wacko's coal is a great second choice! |
| Lewis, Marilyn | Just a short plea to the Power and Conservation Council: Please phase out dirty coal plants. Let's find cleaner ways to power this state. Thank you. Marilyn Lewis, Port Townsend, Wash. |
| Lifton, David | It is high time to put a lid on coal emissions and the most effective way to do that is to reduce the amount of coal we burn. As far as I know there is no "clean" way to use coal for electricity produ... |
| Light, Ted | I am happy to see the new power plan seek to meet additional load growth through efficiency. The Council should, however, be leading the discussion and analysis to determine what is necessary to meet... |
| Linda De Sitter, MD | We appreciate that you are supporting renewable energy BUT please alos push to cut CO2 emmisions! This means getting rid of EXISTING coal power plants. Thank you. |
| Lindberg Bogaard, Amy | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Lindholdt, Dr. Paul | Restoring healthy populations of salmon and steelhead is important to the ecology and quality of life in our region, and critical to the fishing businesses and communities in the Northwest and across ... |
| Lindsey, Joel | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Linton, Joann | Lets stabilize carbon emissions by meeting virtually all of our new electricity needs over the next 20 years with energy efficiency and renewable energy. America & the world needs to reduce our carbo... |
| Littlewood, Ann | Oregon needs to move away from coal and the pollution it creates. More specifically, it is past time to close down PGE's Boardman plant, the major source of air pollution in the Columbia Gorge. Please... |
| Locklear, Clyde Alan | The Northwest Power and Conservation Council's draft plan is totally unacceptable in its continuing reliance on coal-powered electricity generation. Coal, which produces 23 percent of the region’s el... |
| Logan, Catherine | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Logan, Dr. Jesse | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Lokan, Kim | It is good to see that the report recommends increasing energy efficiency and conservation as a means of meeting future demand as well as reducing CO2 emissions. I would like to see the report provid... |
| Lommasson, Cynthia | A major reduction in dependence on coal must be considered in any plan concerning our energy future. Coal creates a disproportionate amount of pollution. We must invest in totally clean alternatives f... |
| Louchard, O'Neill | There is no such thing as "clean coal" and due to the toxicity in the air from them, I support closing coal-powered plants. This does not mean I support nuclear plants. Wind, solar, hydro, and findi... |
| Louden, Jeanene | These are difficult times to be charting an energy future. The polarization between those who think current generation methods are known and reliable and those who think it is time to take a leap into... |
| Lovejoy, Patricia And Michael | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Lucas, Lisa | Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand for electricity in the Northwest ... |
| Lunte, Paul | It's time to plan on eliminating coal power plants entirely and replace the lost production by developing renewable, green energy sources and increasing energy efficiency standards. Including coal pow... |
| Lyman, Debbie | I will make my comments very short. I do not want to see the creation or expansion of coal fired power plants. I want goals to be met for renewable energy and I want you to set strong targets for le... |
| Lynch, Erin | Dear Mark Walker, I have been following the Northwest Power ans Conservation Council's Power Plan and I commend you on the focus of energy efficiency and renewable energy. However, I would like to... |
| Mackey, Jim | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Mackie, Peggy | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Madison, Bartley N. | Puget Sound Energy has hit the nail on the head. They said in their comments: "The council should consider "responsible" Nuclear generation. Additional coal plants without carbon capture and seques... |
| Magne, Robert | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Maher, Cindy | I appreciate you efforts on energy efficiency and focus on renewables, but I would like to see those efforts fortified with a reduction in greenhouse emissions. Thank you! |
| Mainwaring, Edward | This plan should include a provision for the removal of the four lower Snake River dams. This is deemed necessary for Salmon recovery by most scientists that have examined the issue. Salmon are part... |
| Marceron, Dennis | I am pleased that you all are looking to maximize efficiency standards and how to implement the use of new, energy efficient equipment. However, stabilizing current global warming emmissions is not e... |
| Marshall, Sharon | To the committee: Your efforts are much appreciated, but the time to wind down our coal powered electric plant in Boardman is now. We can't afford to continue to pollute and have a responsibilitly t... |
| Marshall, Thomas | As a Seattle City Light customer, I would like to see the northwest's electricity come from renewable and clean sources. This is our opportunity to close the existing coal plants. They're always going... |
| Martin, Ron | Help put the Northwest on the right track toward a clean energy future! The draft plan would stabilize carbon emissions by meeting virtually all of our new electricity needs over the next 20 years ... |
| Martin, Ron | To the members of the NPCC: As a resident if the Oacific Northwest, I am writing to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal ... |
| Martynowych, Denis | see attached |
| Maskus, James & Kristen | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Matera, Stephen | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Matthews, Dr Jonathan | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Matthews, Jonathan C. | The Northwest has an abundance of energy efficiency and renewable energy resources that will help the region meet future energy demand without impairing clean water and air. NWPCC'S final plan should ... |
| Maunder, Jim | Comments to the Northwest Power Planning and Conservation Council on their 6th Power Plan, October 13, 2009 Introduction I’m Jim Maunder, Manager of Member Services, Ravalli County Electric Coopera... |
| Maynard, Linda | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Mazzarella, Jo Ann | I applaud the elements of the plan regarding eliminating coal-generated electricity in the Northwest. The carbon dioxide emitted by coal plants is contributing to the destruction of our planet and dam... |
| Mcbride, Dennis | Oregon law calls for a 75-percent cut in greenhouse gas emissions by 2050, a figure the council has determined will only be reached with a virtual elimination of coal from the power system. And while ... |
| McCann, Al | Move on and help Washingyon State to become GREEN and to reduce greenhouse gasses and to get away from Coal Energy - which produces CO-2. Get rid of the Coal burning energy plants. Make Washington St... |
| Mcclay, Mauria | Let’s keep coal out of our energy future A draft power and conservation plan from the region’s official power-planning agency gets plenty right in its vision of the next 20 years: The Northwest Pow... |
| Mccracken, Mary | I'm in disbelief that we are continuing to ruin places by extracting coal and then polluting the air by burning it when we should be repowering with solar, wind, geothermal. I have solar collectors f... |
| Mccracken, Rhiannon | While I appreciate your efforts on energy efficiency and focus on renewables, I think it is very important that we see those efforts fortified with a reduction in greenhouse emissions. Without the eli... |
| Mcdonald, James | While I commend you for your work on efficiency goals, I must add my voice as an advocate for eliminating our use of coal. I for one am willing to pay higher rates for a cleaner environment. Please he... |
| McElfresh, Stephen | ---------------------------------- To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It... |
| McGaughy, Loann | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Mcgilvra, Mary | We need to start eliminating the use of coal and it pollution from our region and we need to start doing it now. Coal should be aggressively eliminated starting immediately. Our region needs to dedi... |
| McGlone, Colleen | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Mcgowan, Wendy S. | To the Northwest Power and Conservation Council, Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. Its proposal to ... |
| Mcgrath, Lincoln | coal is so 19th century. seriously. |
| Mcguire, Timothy M | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| McHugh, Alexandria | I care very much about the environment and our home. I appreciate the work you are doing to protect us, and hope this will eliminate the use of coal. |
| Mcintyre, Jenifer | To the members of the NPCC: Hi. Yes, I live in Seattle, but my view would be the same no matter where I lived in the Pacific Northwest. Please, we can make stronger changes at a faster pace. Peo... |
| Mclaughlin, William C. | I'm writing to ask you to add my voice and opinions for your Draft 6th Plan. I would like to advocate for the following points and acctions: First, the phasing out of coal fired plants. There ... |
| Mcnamara, Rebecca | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Mcwilliams, Jon | Dear Mark: As we move in the direction of using alternative energy, it is time to reduce facilities that continue to have high levels of pollution. That is definitely true with the Boardman Power Pla... |
| Medeiros, Sylvia | I am urging Mark Walker to not maintain the status quo to further cut carbon emissions and phase out coal power. thank you. |
| Medley, Jay And Elizabeth | The Northwest Power and Conservation Council's plan to meet our region’s rising electricity demand is definitely forward-looking, with impressive efficiency standards and new clean energy, including n... |
| Melville, Beth | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Mensing, Kathy | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Merkel, Alison | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Merrill, Rodney L. | The Northwest Power and Conservation Council draft power and conservation plan gets plenty right in its vision of the next 20 years but it does not go far enough if we are serious about eliminating di... |
| Merrill, Sarah | Dear Northwest Power and Conservation Council, Thank you for the opportunity to comment on the 6th Northwest Power and Conservation Plan. I applaud the goal of no net increase in CO2 emissions and... |
| Merryman, Nancy | Dear Council Members, Please take on the coal plant issue and make eliminating coal-powered electricy plants a priority. This issue will only get solved if we force the issue on all fronts and is ... |
| Messenger, Tom | Council, While I really appreciate your efforts on energy efficiency and focus on renewables, but it be a better plan if it were fortified with a reduction in greenhouse emissions. Specifically,... |
| Michaels, Christopher | We want the Council to adopt a clean Regional Power Plan. Please also cut back on coal which will also reduce CO2 emissions. |
| Michele Blankenheim | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Micheletti, Dustin | The 20-year plan looks great, but more needs to be done to eliminate our dependence on coal power, whether by closing gross-polluters like Boardman, or by heavily subsidizing alternative power sources... |
| Millage, Michael | We need to reduce greenhouse gas emissions as soon as possible. According to the National Center for Atmospheric Research it is too late to avoid significant warming in this century but we could blunt... |
| Miller, Eric R | see attached |
| Miller, Glenn | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Miller, John | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Miller, Robin | Good job with the efforts to increase renewable energy in Oregon and making energy production more effecient. I would also like to see less dependence on coal power. It is just too polluting. Thanks, ... |
| Milliken, Gerry | Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand for electricity in the Northwest... |
| Mills, Ashea | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Minchew, Jackie | All that you will hear about the need to reduce greenhouse gas emissions, rather simply stabalizing them, is true and reason enough to begin phasing out coal as an energy generating source in Washingt... |
| Mintkeski, Walt | I wish to congratulate the Northwest Power and Conservation Council for producing a draft power and conservation plan for the next 20 years which calls for meeting our region's electricity demand with... |
| Mintz, Sara | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Misley, Ryan | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Mobeck, Melissa | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Moehling, Kelly | We need to get away from coal as an energy source. It causes too much pollution for the gain. We should utilize cleaner sources of energy. |
| Monheim, Jeff | Montana stands at an important juncture in the arena of energy development. She can bow under to pressure from the coal industry to continue harvesting this dirty, CO2 emitting mineral "because it is ... |
| Monroe, Molly | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Montana Environmental Information Center | |
| Montana Public Service Commission | See attached comments. |
| Montgomery, Edith | This is a good plan as far as it goes but coal needs to be eliminated as a power source. You can draw up a plan that will be a leader in the nation. |
| Moore, Margaret | I want stronger efficiency standards and I don't want coal. BPA still uses coal. The sky is falling re: carbon dioxide - there is too much in the air. See: The United Nations Scientists' Report ... |
| More, Janie | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Morgan, Dr susan | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Morgan, Juliana | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Moriarty, Eric | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Morley, Donald | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Morris, Arvia | The 6th power plan for the Northwest seems comprehensive in that is discusses the human energy needs of the region in the context of the need to reduce greeen house gas emmissions and restore habitat ... |
| Morris, Arvia | Fossil fuels are ruining our climate. I support measures which reduce or eliminate our dependance on fossil fuels in the Northwest and in the nation. I support clossing coal buring power plants and ... |
| Moulton, Francis | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Mountaineers | Sorry, not sure you system liked the filename in my previous attempt, so I am trying again. |
| Mr. Shelley D. Dahlgren, PhD | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Mueller, Gary | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Mulhbradt, Bruce | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Murray, Susan | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Musser, Mallory | see attached |
| Myers, Jo | Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand for electricity in the Northwest ... |
| Nahill, Brad | I'd like to applaud the Council's recommendations to meet new electricity needs over the next 20 years with no net increase in greenhouse gas emissions, investing in efficiency, and promoting renewabl... |
| Nash, Heyward | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Nash, Janet | To the Northwest Power and Conservation Council: Your work is appreciated, but not finished. The plan needs to go further. The million-ton elephant in the council’s room is coal, which produces 23... |
| Naze, Christopher | Every time that the entrenched status quo has told Americans that something cannot be done, Americans find a way to do it. When we discovered that fleurocarbons were eating a whole in the ozone, indu... |
| Neer, Steven | REMOVE COAL FROM OREGON'S ENERGY MIX. This source is much to dirty! |
| Neil Mages, ND | 1)Coal, which produces 23 percent of the region’s electricity but spews out 87 percent of the region’s pollution. 2)Oregon law calls for a 75-percent cut in 1990’s greenhouse gas emissions by 2050,... |
| Nelson, Guy; Team Lead, Utility Geothermal Working Group | Thank you for the opportunity to comment on the Draft Sixth Power Plan. There is no discussion on the economics of geothermal heat pumps and their potential benefits to meeting the Region's energy ef... |
| Nelson, Kris | The power plan should be applauded for its emphasis on the untapped resource value of energy efficiency available to offse the need for new generation and, potentially, for replacement of the dirtiest... |
| Nelson, Thomas & Marianne | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Newlin, John K. | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Newman II, Will | I urge you to take a good plan and complete it to make it a great plan. A clear, rational, scientific evaluation shows that coal cannot be a part of any rational energy future. It is dirty, heavily... |
| Newman, Joe | We need much more clean energy for the Northwest and Nuclear is not clean so I am talking about wind, solar and conservation. Conservation is not getting anywhere near the attention it deserves. W... |
| Newton, Jason | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Noble, Steve | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Noe, Phillip | Thanks for your work to reduce our emissions. We must do more to protect the only habitat our future generations will have. I was shocked to hear that coal fired plants spew out 87% of our region's ... |
| Noland, Stacy | see attached |
| Nordt, Kevin | |
| Norman T. Baker, PhD | Dear Members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Norris, Dr. Kaye | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Norsen, Bob | We lived in Seattle the prior 51 years, until last year. We are still affected by what Seattle does to our ecology. Seattle is in a unique area where suitable GEOTHERMAL heat energy is available... |
| Northwest Energy Efficiency Council | see attached |
| Northwest Food Processors Association | |
| Northwest Gas Association | |
| Northwest Requirements Utilities | |
| Northwest Resource Information Center | See attached |
| Northwest River Partners | RiverPartners’ comments on the draft power plan are enclosed. |
| NorthWestern Energy | See attached. (Technically submitted before the comment period began, so wasn't part of the online collection of comments until we re-reviewed all submissions in Sep 2010.) |
| Nuessle, William and Charlotte | We appreciate your good work on energy efficiency and renewables but what is also really needed is a focus on cutting greenhouse emissions. Such as coal. |
| Nuessle, William and Charlotte | o the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand for... |
| Nunez, Kelsey | I'd like to start out by saying that I support the plan and it's move way from new fossil fuel production--we cannot afford (economically, socially, or environmentally) to continue to rely on fossil f... |
| NW Energy Coalition | see attached |
| NWEC and SOS | |
| O'brien, Don | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| O'steen, Barbara | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| O’Neil, Carol | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Olson, Cathy | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Onward Oregon | One year ago the ship flipped over. If there had been no-one left that cared about God and Earth there would be nothing left to save anywhere in short order, even, by now perhaps. The time for sense... |
| Oregon Department of Energy | |
| Oregon Interfaith Power and Light, A project of Ecumenical Ministries of Oregon | |
| Oregon Wild | We urge the council to emphasize energy conservation and non-hydro renewables to meet energy demand. Climate change makes this path so important. New energy from coal or LNG must be avoided. Hydro is ... |
| Oset, Robert | see attached |
| Ost, John Andrew | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Ostrer, Allison | I want clean energy developed in the northwest. That means moving away from fossil fuels AND nuclear energy. Converting to nuclear energy would be like quitting tobacco to take up crack. What we need ... |
| Otis, Anne | Please, close down all coal plants as soon as possible. It is possible and necessary. Thank you. |
| Oxford, Rex | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Pace, Charles | see attached |
| Pacific Power | see attached |
| Paden, Charles | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Panagoulis, Kadin | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Parker, J.T. | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Parkinson, Kitsie | Thank you for the work you have done to start to turn us toward a better energy future. The emphasis you have put on efficiency and development of renewable energy sources is admirable! However, the... |
| Parrish, Elaine | " I want to urge the Council to adopt a clean regional Power Plan and to get away from coal completely. " |
| Partridge, Dixie & Jerry | As energy demands and costs have gone up consistently, one of our biggest concerns is that in the effort to encourage and increase conservation in the use of less energy, the "powers that be" would co... |
| Pasquiou, Thierry | There is no such thing as clean coal. Reducing the emissions by stockpiling large quantities of extremely toxic chemicals which eventually may leak is not a viable option for coal burning. There are a... |
| Patchell, Rebecca | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Paul, Alex | I feel the dams should be removed on the Snake River to allow salmon to spawn there again. The dams are old and inefficient and I agree with the CCA position below. The beauty of conservation through ... |
| Pauley, Stephen M | Sirs, Power production from the four lower Snake Dams is out of synch with power needs. You have maximum reservoir storage in spring when little power is needed, and minimum storage in summer and f... |
| Paulsen, James | I'll be brief. I am concerned about climate warming, a compounding and growing issue on Montana forests, trout streams and rivers, and its world impact. Reducing coal-bruning power plants needs to be ... |
| Paylor, Stephen | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Peach, Hugh Gilbert | see attached |
| Pemble, James | I would like to urge Director Walker to expedite the creation of a clean and green regional power plan for the northwest corner of our country. I'd like to see Washington take the lead in this effort... |
| Peres, Todd | Urging you to shut down the filthy Boardman plant as well as the other PGE coal fired facilities in Montana. |
| Perez, Martha | I am a former employee of Bonneville Power Administration, Energy Efficiency office, of the Portland branch. I would like to dedicate this testimony, in memory and honor of all victims of Hurricanes K... |
| Perrotti, Edward David | The facts are clear, indeeed. We can do more for the planet and ourselves by simply reducing the energy footprint that we all have. First and foremost, any emisson reductions begin at home. Surely... |
| Peterson, Beau | We have the resources, the know how, and the ethical obligation to move quickly away from coal as a source of energy. Please do the right thing and look at the amazing opportunities in alternative fo... |
| Petrofsky, Erica | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Phillips, Stuart | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Phillips, Stuart | The plan does nothing to actually reduce our carbon emissions or lessen our current dependence on the coal-fired power plants that account for nearly 90% of our electric system’s global-warming emissi... |
| Pierce, Wilbur | As a citizen of Washington, I'm not an expert on how to solve the complex power planning issues we face. However, I would like to make my voice heard in what I feel the plan needs to accomplish (bey... |
| PNGC Power | |
| PNUCC | We have reviewed your draft Power Plan and provide the attached response for your consideration. This draft reflects a tremendous amount of time and effort of Council members and staff combined - an... |
| Poirier, J. | I would like the Council for the Draft Power Plan to be based on the truth of our resources, not our pocketbooks. Specifically we have to cut CO2 emissions and face the reality of water shortage. I ... |
| Polarity Center of Salem | Close Boardman and develop Solar energy power stations here in Oregon... Our air and watyer have been compromised long enough...PGE should bear the brunt of the cost...I am a shareholder also. Public... |
| Polcyn, Dr. Iam | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| PolicyInteractive | see attached |
| Polk, Nora | Northwest Power and Conservation Council, Your very good draft could become a great plan. It can build on its already-solid foundation of efficiency and clean energy and build toward a low-carbon e... |
| Pollock, Thomas | I live and vote in Portland, OR. I would like you to know that my family and I do our best to conserve energy, recycle, and support clean, renewable energy for a decent future for us all. Please inclu... |
| Post, Randall | Stay environmental and as green as you mpossibly can! |
| Poulsen, Pamela | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Powell, Erik | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Powers, Kelly | We need to close the coal fired plants for many reasons - pollution, pollution and pollution. It hurts our lungs and air, it spoils Mt. Rainier National Park, it gets in our water and food-chain. We m... |
| Poyourow, Michelle | Director Walker, Please consider strengthening the greenhouse gas reduction targets and incentives in the next power and conservation plan. I am willing to pay a little more for my own electrici... |
| Prentiss, Alex | Thank you for your efforts to encourage energy efficiency. I believe the job now is to focus on renewables and a reduction in greenhouse gas emissions. To that end I urge you to phase out all coal gen... |
| Public Power Council | see attached |
| Public Utility District No. 1 of Cowlitz County, Washington | |
| Puget Sound Energy | Thank you for the opportunity to comment on the Draft 6th Power Plan. Please find Puget Sound Energy’s attached comments. |
| Puich, Renate M. | see attached |
| Pushkara | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Quinlan, Sean | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Quinn, Larry | Sadly, coal is the culprit. |
| Raether, Paul | I appreciate your efforts on energy efficiency and focus on renewables, but would like to see those efforts fortified with a reduction in greenhouse emissions, i.e. phase out coal ASAP if not sooner. ... |
| Ransel, Katherine | Dear Council Members: I was delighted to hear that the Council has demonstrated that we need no new fossil-fueled power plants and has proposed to meet the next 20 years of Northwest electric deman... |
| Raunig, Christi | The 6th draft of the plan is not bold enough. Please consider taking a more determined stance on the future of our area including increasing conservation efforts and discouraging coal plant operation... |
| Ravi, Rajaram | Let us look forward and harness the forces of nature - solar, wind and geothermal to make energy the right way.. Civilizations thrived for centuries before the advent of Fossil fuels and coal..and wil... |
| Ray, Dr. John W. | See attached. |
| Ray, Gisela | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Ray, Gisela | Let's phase out the coal power plants. They are the dirtiest power producers around, cause illness and agravate haze. We can do better if we muster the will to really get serious with conservation and... |
| Raymond, Dolores | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Real, Marisa | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Redwine, Marilyn | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Reed, Jayne | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Rehn, Debra | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Reich, Dr Arnold | Please begin to decrease our use of coal and fossil fuels. We should follow Europe and other progressive countries and also decrease our dependence on imported oil. Develop and foster new sources of... |
| Reichert, Cheryl | We greatly appreciate being able to do net metering with the 2000 watt solar panels on our house. We feel good about generating clean energy, and we are pleased that while we are saving on our power b... |
| Renewable Northwest Project | |
| Repp, Robert | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Republicans for Environmental Protection | Please accept the following brief comments from Republicans for Environmental Protection (www.rep.org) regarding the draft Sixth Northwest Power Plan. We commend the council for its impressive draf... |
| Rhiger, Daniel | Dear Mark Walker, We must guard this precious resource and economic resource, one of the world.s best food sources, and keep it plentiful for the generations to come. We are capable of produci... |
| Richards, Ron | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Richardson, Gail & John | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Rider, Barbara | I'd like to see Washington state help individuals with purchase of small solar or wind powered solutions with more tax credits and rebates. As an example, we live a few miles west of the foothills of... |
| Riener, Lisa | Comments regarding the Draft 6th Power Plan: Thank you for taking these comments. As a Region, we must preserve and expand the 6th Power Plan draft. We must push for the plan’s clean energy targe... |
| Riener, Lisa | Hello Mark Walker: Northwest Power and Conservation Council, Many people have attended the public hearings on the draft Sixth Northwest Power and Conservation Plan. I support the region’s offici... |
| Ries, Shelley | your work on energy efficiency and renewables is admirable, but we must also include a focus on reduction of current levels of greenhouse gasses |
| Riley, Erin | I'm writing to implore you to consider removing the lower Snake River dams in an effort to increase green energy replacements and help in with wild salmon recovery. The salmon are dying in the Columbi... |
| Rimbos, Peter | I believe the stated clean energy targets are good and feel they should be maintained, if not improved. It appears the draft plan would only stabilize, not reduce, greenhouse gas emissions, thus not w... |
| Rimbos, Peter | I commend the Council on its draft plan since it emphasizes meeting nearly all the region's power needs through both energy efficiency and renewables. This could help stabilize our greenhouse gas emis... |
| Ritchie, Norm | Thank you for this opportunity to be heard. The 6th Power Plan is generally a good plan, but it must go further and move faster. The Council must be a strong leader to craft a bright future for our... |
| Robinson, Julie | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Robinson, Shane | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Rodine, Marcia | It's time to restore the habitat for our salmon and steelhead by removing the four lower dams on the Snake River. Now is the time before it's too late. Thank you for your consideration and approval.... |
| Rogers, Ruth | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Rogulja, Karen Magnuson | I hope the Council will consider adopting a plan that reduces our CO2 pollution in accordance with the targets established by Northwest states and the scientific community. The final 6th Plan should... |
| Rokas, John | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Rolland, Seth | I like your plan of meeting all new electric demand with energy efficiency and renewable energy. However i would like to see the plan encourage the closing of the coal fired plants that make so much ... |
| Rollins, Eldon | I have heard a few lame-witted arguments implying that alternative energy would not be reliable enough to rely on. There is just barely enough validity to some to lend false credence to the whole. ... |
| Ronald W. Martin, Jr | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Roos, Carolyn | This comment comes from CHP discussions emerging from within the RTF as a way to analyze CHP botrh both its efficiency gains and its power generation: Proposal to the Northwest Power Plan 1. Rec... |
| Roppo, Phil | Dear Mr. Walker: I am sorry that I don't have the time to provide in depth comments to the Council on the Draft Sixth Northwest Power Plan, but I would at least like to make a few comments: 1. W... |
| Rose, Sarah | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Rose, Sarah | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Rosenthal, Gerritt | To the NWPCC: You are to be commended for getting a start on the shift to cleaner and more sustainable energy. But it is clear that we have to do something about coal, if not in the immediate short t... |
| Rosin, Leah | Dear Bill, Bruce, Joan, Tom, Dick, Rhonda and Jim, I am a native Oregonian, and I care about how our region is powered. I talk to too many people within this state who wrongfully assume that all o... |
| Ross, Fred | I would like you to reconsider how the council is approaching coal burning as a source of energy. Everyone acknowledges that we cannot get to our goals in the next 20 - 30 years while still burning c... |
| Ruby, Kevin | I agree with everything the Columbia and Snake Rivers Campaign says and does, including this statement: "Restoring healthy populations of salmon and steelhead is important to the ecology and quality o... |
| Russell, William P. | To : Northwest Power and Conservation Council (NPCC) Thank you for a chance to give my input on the new Plan. In many ways, it is a good plan. The push for conservation and renewable power is e... |
| Ruston, Mitchell | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Rutherford, Mark | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. My name is Mark Rutherford and I own a fly fishing guide/ outfitting company "Wild River Guid... |
| Salazar, Monica | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Saletta, Antoinette | The proposal from the Northwest Power and Conservation Council indicates our region’s rising electricity demand for new clean energy will be met with impressive efficiency standards, and without build... |
| Samela, Rastic | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Sammeth, Michele | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Samuel Jr., Terrence D. | I am getting older and the future belongs to my children and grand children. I would like to leave them a legacy of good health and an environment that enhances their lives. Included in that desire is... |
| Sargent, George | Dear Mr. Walker: Please take further efforts to reduce our usage of coal-based energy. The costs of using coal just aren't worth it, with all the pollution it creates. |
| Sargent, Martha | This plan needs to go further. The million-ton elephant in the council’s room is coal, which produces 23 percent of the region’s electricity but spews out 87 percent of the region’s pollution. The dra... |
| Sargent, Todd | I appreciate their efforts on energy efficiency and focus on renewables, but would like to see those efforts fortified with a reduction in greenhouse emissions. |
| Saude, Debra J | To whom this concerns, Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand for el... |
| Saude, Debra J, | Dear Council Members; Though the current draft of the 6th Power and Conservation Plan would stabilize carbon emissions by meeting virtually all of our new electricity needs over the next 20 years w... |
| Saylor, Julia M | Thank you for considering my comments. In the NWPCC final plan, I feel strongly that the following should be reflected in the final NWPCC plan: At the top of my list is that coal-fired power plant... |
| Scarff, Steve | Dear Sirs: The Draft Sixth Power Plan needs to establish targets that will greatly reduce our region's CO2 emissions, thereby doing our part to mitigate climate change due to greenhouse gases. One... |
| Schaad, Mary | Hello; I live in Bozeman, MT and I'd like to express my support for the energy future that the 6th Power Plan prepares for and will help to create. Thank you for your inclusion of important points r... |
| Schlacter, Judith | members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand for electri... |
| Schmidt, Mindy | Oregon law calls for a 75-percent cut in 1990’s greenhouse gas emissions by 2050, a figure the council has determined will only be reached with a virtual elimination of coal from the power system. And... |
| Schneider, Jerry | It seems to me that electrified transportation possibilities are not given nearly enough attention as a future driver of the demand for electricity. Plug-in hybrids are mentioned (barely) but there ar... |
| Schossau, Pamela | We HAVE to make a change sooner rather than later, and reduction--or better yet, elimination--of use of coal is the change we can make that will have the biggest impact. Please plan to get coal out of... |
| Schreiber, James | I have spent 45 years, as a field service engineer, in and around all forms of heavy industry in the United States and the world. I have seen first hand the good, the bad and the ugly of them all. ... |
| Schupbach, Sherry | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Schure, Linda Helding | Hello: The following are my comments on the on Draft Sixth Power Plan. Thank you so much for this opportunity to comment and good luck. The Northwest has an abundance of energy efficiency and re... |
| Schwane, Walter | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. A proposal that meets demands for electricity in the Northwest through conservation and ren... |
| Scott, Steven Brian | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Scramlin, Sheryl | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Seabrook, Kathy | Dear sirs and madams, When it comes to Carbon Dioxide, there is no such thing as clean coal. I would like to see real alternatives, like combination's of wind, solar, geothermal and of course t... |
| Seamons, Joe | Thanks for your efforts, but your plan needs to go further. The elephant in the room is coal, which produces 23 percent of our region’s electricity but spews out 87 percent of its pollution. Your draf... |
| Seattle City Light | see attached |
| Sechrist, Shelley | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Selander, Spencer | We need a plan that reduces carbon emissions, primarily by eliminating dependence on coal-fired power plants; while the draft 6th Power and Conservation Plan represents progress, it is inadequate. ... |
| Senic, Daniel | see attached |
| Sennett, Clinton | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong ener... |
| Sennett, Clinton | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Sevaly, Jim | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Shade, Pat | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Shanklin, Monica | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Shapiro, David | I appreciate the work you're doing to increase energy efficiency and your focus on renewable energy sources. But your plan needs to chart a path towards elimination of coal-burning plants. These plant... |
| Shawn, Susan | Thank you for focusing, in your power plan, on renewable energy, and to some extent, clean energy. I appreciate that work, and support that direction. I think we probably also need to focus way more... |
| Shepherd, Lee | I urge the use all energy resources, hydro, nuclear, and coal, to keep prices low during these trying economic times. Please reject the clearly partisan, opportunist, alarmist climate change nonsense... |
| Shewell, Jarom | Thank you for this opportunity to comment. While the current draft plan is an encouraging start toward clean energy, sadly it falls far short. The time has long passed for half-measures and token re... |
| Shinn, Nancy | Dear Sirs: Please increase our renewable energy options. Make them a priority. We can put many people to work building these facilities. And please take our coal powered plants out of commissi... |
| Shippey, Mike | Oregon has a history of progressive environmental regulations, established in recognition of our outstanding landscapes. I believe further development of coal burning power plants in our state would ... |
| Shores, Karen | Please work diligently to phase out coal fired plants.... We don't like to have our breathing air polluted. They are major contributors to Global warming which is upon us... not in the future. ... |
| Showalter, Glenn | I support the position of the NW Energy Council. |
| Showalter, Thomas E | Iam a retired science teacher . I grew up in northern Illinois in a home that was heated bt Bituminous coal. Most homes cooked on iether coal or wood fired stoves as the only gas available was propane... |
| Shurgot, Michael W. | Dear NPCC: I have been active in environmental work for The Mountaineers and the Sierra Club for over 25 years in the Seattle area. Among the many issues I have worked on are expansion and protectio... |
| Siegel, Craig | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Siegle, Anne | Adopt a final regional power plan that includes stronger efficiency standards, accounts specifically for the cost for carbon, and puts the NW on a path away from coal power. |
| Sierra Club | see attached |
| Sierra Club supporters | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Sierra Club supporters | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Sierra Club supporters | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Sikes, Elizabeth | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. Its proposal to meet all new demand for... |
| Sikorski, Wade | I strongly encourage Northwest to take the strongest measures to reduce climate change. My family owns a ranch in southeastern Montana, and it is very clear to me that we are already suffering harm f... |
| Sill, David M. | The Final Plan absolutely must contain definite steps to remove the 4 Lower Snake River Dams. Studies have shown beyond any doubt that removal is economically and biologically sound and necessary with... |
| Silverberg, Aaron | I have been an advocate for renewable energy generation for more than 30 years (since the Reagan administration dismantled the Carter administrations efforts to establish long-term alternative energy ... |
| Silverforb, Judith | Oregon law calls for a 75-percent cut in 1990’s greenhouse gas emissions by 2050, a figure that will only be reached with a virtual elimination of coal from the power system. And while the no coal pla... |
| Simonsen, John | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Siren, Kevin | Rec'd via voicemail: Please adopt a power plan that includes stronger efficiency standards, accounts specifically for the cost of carbon and puts the region on a path away from coal power. |
| Sjoding, David | See 3 attachments |
| Sjoding, David | Two of the attachments may not have made it into the system per the e-mail response - This may be duplicative here is the last of the 3 attachments |
| Sjoding, David | Two of the attachments may not have made it into the system per the e-mail response - This may be duplicative |
| Skari, Arlo | My family and I farm in north central MT approximately 20 miles from the Alberta border. We are concerned about the drying up of the west in the long run; It is touch and go now to get sufficient moi... |
| Skuja, Maris | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Slifer, E. | Move away from fossil fuels and full steam ahead on renewables! |
| Smith, Brian | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Smith, Jeff | We are entering an era that demands we change the way we generate and use energy. The era of cheap energy is over. And we should ensure that the United States never goes to war again to secure its ene... |
| Smith, Jerry | We pay EWEB our utility to keep us green. NO ONE NEEDS TO SUFFER FROM AIR POLLUTION. THE WORLD IS IN GREAT DANGER NOW FROM CARBON IN THE ATMOSPHERE, COAL IS THE MAIN CONTRIBUTOR IN OREGON. NO MORE C... |
| Smith, Laurie A. | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Smith, Robert D. | I live in a small city by a river that has overflowed its banks twice in two years for the first time in a half century. The cause was torrential rains so great that the dam created to control them wa... |
| Snake River Alliance | Comments to the Northwest Power and Conservation Council on Draft Sixth Power Plan by Snake River Alliance November 6, 2009 On behalf of the Snake River Alliance, its membership and its Board of ... |
| Sneddon, Sharon | I think we are heading in the right direction, but hope the coal plant in Centralia can be phased out soon. Energy needs must be met entirely with renewable sources such as wind, solar, tidal, and oth... |
| Snohomish Public Utility District | See attached. |
| Snyder, David A. | The draft Northwest Power and Conservation Council power and conservation plan is on target in its plan to meet our region’s rising electricity demand with efficiency standards and new clean energy, ... |
| Solomon, Arthur | I am worried about coal. Is there anyway to get away from the coal power? Perhaps we could charge for carbon emissions. The costs for carbon emissions should be higher. |
| Sondhi, Gunthild | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Spearing, Joan | I urge you to make a good plan better. |
| Speers, Alice & Doug | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Spencer, Barbara | Coal is dirty. Please make the council's energy plan clean and green. |
| Spiecker, Katya | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Spitz, Paul | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Springfield Utility Board | |
| Stahl, Charlotte | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Stanik, Valerie | Thank you for your good work. Please consider that we need to decrease greenhouse gases in our region for the most effective strategy to fit with increasing renewable energy sources. |
| Stansbury, Katherine Anne | Now, not in the year 2030, is the time to start planning our exit from a coal-dependent energy policy. The Northwest Power and Conservation Council’s very good draft could become a great plan. It c... |
| Stark, John M | Do not go out on limb and rely too much on new green energy systems. |
| Steele, Kaye | Please continue to work on this further as we need really clean fuel. |
| Steffen, Alex | Our region's commitment to clean energy and limiting greenhouse gas emissions are laudable, but we need to go farther. We need to become the nation's leader in greenhouse gas reductions in the energy ... |
| Steitz, Jim | I write to urge Northwest Power and Conservation Council to make more aggressive use of efficiency and conservation to cut the region’s use of fossil fuels. These cuts must be as rapid and aggressive ... |
| Stempf, Debbie | My whole family and my grandparents before our generation enjoyed the outdoors with clean water and air. This enjoyment includes the animals and fish inherent in the system. We need to have thes... |
| Stephen, Amy | The overwhelming preponderence of credible science shows that greenhouse-gas buildup has the potential to drastcally destabilize weather and, thereby, entire bioregions. This being the case, PGE's dec... |
| Stevens, Henry | Coal is one of the most polluting forms of energy that we use today. Between the potential negative effects of global warming, and the need to find new and better energy sources for the future in any ... |
| Stewart, Deborah | Dear Mark Walker, As a 30-year resident of Washington and with children and grandchildren here, I feel very strongly that we must not only prevent increased green-house gas pollution, but reduce our ... |
| Stewart, Eugene | We need more energy. We should look at all sources and pick the sources that are proven. Hydro-make the dams fish friendly. Nuclear-If it works so well in France, why not here? Coal-Our most abund... |
| Stewart, Lon | I support your efforts to increase the Northwest’s available energy through energy efficiency/conservation measures and renewable energy technologies. The Plan could be more forward thinking by requi... |
| Stewart, Margaret Macdonald | Northwest Power and Conservation Council members, My name is Margaret Macdonald Stewart and I've lived in Ketchum, Idaho for 38 years. After reading much of your recent draft Power Plan I have only... |
| Stolzberg, Karen | Even if coal is scrubbed and tidied up as much as possible, there is no way around the devastating environmental damage done by the extraction. There are alternatives. Let's get smart about our ... |
| Strauss, Catherine | Would like to urge Northwest Power to decrease C02 emmissions and move away from coal power. |
| Streeter, Dave | Dear Northwest Power and Conservation Council, I am very concerned about climate change. I believe that the costs in cash and intangibles that more volatile weather will incur are far greater than... |
| Streng, Ramie | Thank you for what energy efficiency and renewable programs you are supporting, I'm just hoping you can work to strengthen cutting emissions of fossil fuels and help reduce climate changing effects of... |
| Strothkamp, Dr. Ken | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Stumbo, Lava\onne | "I want to urge the Council to adopt a clean regional power plan. " |
| Sukkau, Nicholas | To Whom It May Concern: Please initiate policy that supports Oregon's law that calls for a 75-percent cut in 1990’s greenhouse gas emissions by 2050. To do this, we must completely eliminate our r... |
| Sunrise, Elizabeth Anne | I'm concerned that a dirty coal plant is in our region. We need to reduce global warming emissions and stop using dirty coal for our energy needs. Many signs of global warming are occuring around th... |
| Surdi, Leonard | As the leading signature gatherer for the clean energy initiative for Whatcom County back in 2007 I kept on hearing from all types of people (liberal, conservative, libertarian, etc.) that now is the ... |
| Susan, Bennett | Did the coal plant emissions cause my cancer or my neighbors breast cancer? How about my friends child's birth defect? Maybe. It's possible, even probable or likely, who can be certain? What scienc... |
| Suter, Paul | Northwest Power and Conservation Council: Conservation and other measures are great in our efforts to reduce energy consumption. However, I urge you to be as strong, clear and far-sighted when it ... |
| Swan, Linda | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Swan, Linda | We need to end our reliance on coal and move toward more sustainable, clean energy resources • We applaud the Council for showing we need no new fossil-fueled power plants and for proposing to meet ... |
| Swanson-davies, Linda | Thank you so much for your efforts to focus on renewables and energy efficiency, but we need a big reduction in green house emissions NOW, please, and certainly need to get out of coal ASAP! |
| Swenson, Chris | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Switalski, Adam | To whom it may concern, I am writing to support a clean energy future for the northwest. As you know, coal power plants emit large amounts of greenhouse gases into the environment which... |
| Switzer-tatum, Paulette M. | The coal industry needs to be cleaned up and greened up before it gets my support. Mountaintop removal mining has to stop - it ruins communities and environments. These elements have to be factored in... |
| Szynskie, Mary Kay | It is no longer necessary to rely on coal burning for our generation of electricity. it is the least responsible way to create electricity. We do have it in our capacity to stop polluting with coal bu... |
| Tacoma Power | Please see Tacoma Power's comments attached. |
| Taylor, Amanda | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Taylor, Amary B. | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Taylor, John | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Taylor, Llew | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Taylor, Mason | We don't need to burn coal. |
| Teherani-Ami, Sima | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Templar, Janet | We need a better plan than this |
| Thayer, Judith | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Thompson, Gerald | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Thompson, Martin E. | We are very fortunate indeed to have the natural resosurses, such as the Columbia River, natural wind and a fair amount of solar, in the Pacific Northwest. We have imported coal from outside the regi... |
| Thompson, Sylvan | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Three Pines Neighborhood Association | Dear Mr. Walker: Energy alternatives to coal are becoming more cost feasible. Bio-fuels are (finally!) being shown NOT to provide a positive return on our investments, whereas solar and wind ARE p... |
| Thrower, Ashley | Coal produces 23 percent of the region’s electricity but spews out 87 percent of the region’s pollution. Your draft plan, admirably aggressive in its pursuit of energy efficiency and renewable-energy ... |
| Thurman, Carolyn | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Tiffany, Greg | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Till, Richard | Mr. Walker, I applaud the Northwest Planning Council on its decision to take global warming seriously and focus energy planning on conservation, efficiency, and renewables. The Council can still ma... |
| Till, Richard | To the members of the NPCC: I previously submitted comment on the 6th Power Plan. These comments supplement my prior submission. Of particular importance, this supplemental comment explains the nee... |
| Timmons, Jack | Please go back to the drawing board and do what was asked of you. Produce a plan that will reach 75% reduction in contaminants. That means finding a way to phase out all coal fired power production ... |
| Tipperman, Mark | I am writing to urge you to prohibit the use of coal to meet the areas's energy requirements. The adverse consequences of coal are too severe and cannot be mitigated. |
| Tomlanovich, Anne | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Torrence, Paul F. | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Towanda, Trisha | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. Thanks for your work to come up with a plan to meet the electricity needs of the Northwest ... |
| Trauth, Melissa | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Trembley, Andrea | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Trembly, Andrea | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Trieschamann, Mary | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Trimmer, Rosemary | • We applaud the Council for showing we need no new fossil-fueled power plants and for proposing to meet the next 20 years of growing Northwest electric demand with 5,800 average megawatts of new e... |
| Trojan, Liz | Yes, let's close Boardman. Next let's form a People's Utility District. We'll all benefit from lower rates. |
| Trolinger, Charlotte | Conservation and renewable energy sources are at a developmental stage whereby it’s feasible for us to meet the energy challenges of the next 20 years as we MUST if we want our children’s children to ... |
| Trout Unlimited | see attached |
| Troyer, Tony | The benefits of cheap, on-demand energy are undeniable. Every modern convenience was created by some form of it. As long as there is a solution to continue delivering it, I will be supporting it. Gove... |
| Truman, Kessley | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Tucker, Laurie | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Uphill, Thomas R. | I understand the issues with power generated coal. I do know that a more holistic view of coal is necessary. High qualitity coking coal at least for the short term is necessary of the production of st... |
| Vailmackin, Richard J. | Please work to eliminate fossil fuels. Thank you. |
| Valigura, Anita | thank you for this opportunity to comment. i am an ordinary citizen( 60yr old widowed grandmother). i happen to be very commited to seeing renewable energy and reduced carbon. i also pay carbon credit... |
| Valum, Ben | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Van Fleet, Doug | The Council's draft Sixth Power Plan needs to include cuts to carbon dioxide emissions and address the problem of coal power. The draft plan needs two additional pieces: 1) It needs to address climat... |
| Van Laeken, Donna | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Van Sant, Julie | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Vanek, Josh | I applaud the planning processy NWE's undertaken, and appreciate the service the company provides. As a customer, I've listed my top three priorities below: 1) I'd like NWE to preserve strong energ... |
| Varnau, David | No to coal fired power plants in Washington. As interim source of fuel while renewable energy sources are coming on line, why not natural gas instead of coal--in view of all of the natural gas deposi... |
| Vasko, Bruce | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Veirs, Scott | It saddens me that the complete power plan PDF itself does not even include the words “orca” or “killer whale.” Yet again, our regional iconss -- the endangered southern resident killer whales --are... |
| Villaume, John M. | Please. It's time to recognize that we can't continue to suffocate ourselves. And coal does that. It's pollution suffocates me. I have asthma. I moved back to my home in Oregon from Egypt. Let me t... |
| Villaume, Mary Lyn | I am very impressed with how much electricity the plan proposes to save through conservation and expansion of renewable energy sources. I am expremely disappointed that the current plan does not ma... |
| Villinger, Beverly | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Vinny | It is time to build more nuclear, geothermal and wave energy plants to meet the ever-growing power demands here in Oregon. In addition, invest in more biomass plants instead of solar and wind power p... |
| Vo, Jackie | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Voeller, Estelle | The Council is to be commended for its very solid foundation for future clean energy and conservation plan. Now please make it stronger by addressing the high levels of greenhouse gas emitted by coal... |
| Vogel, Mary | I'm sorry I could not stay to testify verbally last night as I had signed up to do. Due to a recent injury, my own energy was flagging badly and I still needed to walk home. Here's what I had planne... |
| Voss, Britta | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Wadsworth, John | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Wagner, LiDona | Thanks for all the work you've done. Please go one stept further and eliminate coal. |
| Walker, Fern | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Walker, John | I haven't read your proposal, but I would like to encourage use of clean energy and conservation. |
| Wallis, Angela | Please revise the power plan so that it enables the reduction of green house gas emissions, especially those from our coal plants. Thank you, Angela Wallis |
| Walraven, William | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Warren A Bentley, MPhil, PhD, (Cantab) | While I very much appreciate your work on promoting energy efficiency and the use of renewables, I know from my doctoral research in dendrochronology how important the reduction in greenhouse emission... |
| Washington Environmental Council | |
| Washington PUD Association | |
| Watson, Cecilia | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Watson, Vicki | to: Northwest Power & Conservation Council members: Thank you for drafting a plan intended to stabilize carbon emissions by meeting all our new electricity needs over the next 20 years with energy... |
| Wayne, Lawrence | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Wchultz, William | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Webb, Dean | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Webb, Dean | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Webb, Randall | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Weber, James | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Weber, John | I believe the plan is heading in the correct direction. Conservation and energy efficiency should be the heavy lifters. I believe renewable energy generation should be brought on-line as soon as possi... |
| Weintraub, Dana (Mr.) | I encourage you to seriously consider the numerous benefits of emphasizing energy conservation, which carries more bang for the buck. We have literally squandered thirty some-odd y... |
| Welch, Joshua | Cut ties w/ Coal. |
| Weliky, Carol | Need to cut C02 emmissions further and move away from/phase out coal power - I know there's no magic bullet, but we need to start working on this now. Thank you. |
| Welsh, Bob | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Weltzien, Dr. O Alan | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Wendt, Jackie | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Wennlund, Karen | Encourage Mr. Walker to adopt a clean energy plan, specifically to phase out coal and encourage renewables, and phase out nuclear power. |
| Wenz, Celeste | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| West Coast LLC | Clean Energy, Clean Air! |
| West, Rusty | Let's keep extremely focused on the fact that our decisions today, will affect our Children, Our Children's Children, and the very future of Planet Earth. The goal for now is to REDUCE global emiss... |
| Western Montana G&T | |
| Westphal, Natasha | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Westphal, William | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| White, A. E. | We need to move beyond the old ways afore year 2000 of dirty coal plants emitting decades of highly polluted aftermath, and instead put the region on course to close the dirty coal plants once and for... |
| White, Carol | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| White, Maria | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| White, Penelope | Ever since the Carter administration I have been wanting to install solar power. This summer I finally had solar panels installed on my roof which should cover my electricity use - my home and water ... |
| White, Ward | I wanted to urge the Council to adopt a clean Regional Power Plan. I won't go into anymore details about it, but I think it's extremely important that we have a clean Regional Power Plan and I think... |
| Whitmarsh, Stanley & Donna | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency t... |
| Wichar, Den Mark | Save salmon. Take down the four dams. Power lost can easily be made up with alternative clean energy sources. |
| Wickham, Brooke K | To the members of the NPCC: Thank you for the chance to offer input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. Its proposal to meet all new demand for electri... |
| Wienker, Nancy Scott | Warren Buffet's Corporation took down their damn in the Klamath watershed beginning in November of 2008. If Pacific Corp headed by Warren Buffett can see the wisdom in taking down damns in the Klamath... |
| Wiles, Nadine | Thanks to the council for taking initiative on cleaning up Oregon's power supply to lessen the CO2 emissions. I would hope that you will take a closer look at the coal plant that supply energy, becau... |
| Wilhelm, Janus | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand fo... |
| Williams, P | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Willis, J. | I am interested in methods that would lessen our CURRENT (not only future) dependence on coal-fired power plants for energy; as illustrated on page 10-9 of the online draft, coal power plants account ... |
| Willis, Peggy | Re: Comments on Power Plan to NPCC: Thank you for the opportunity to provide comments on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. Its proposal to meet all new... |
| Wilson, Brian | The Northwest is on the cusp of being a national leader in addressing climate change, and improving our health and environment. I applaud the Council's decision to include strong energy efficiency tar... |
| Wing, Pierrette L. | Mr. Walker, Please put teeth in our regional power plan, including stronger efficiency standards than we have now, accounting for the cost of carbon as a priority, and weaning ourselves (the Northwe... |
| Winnett, Sharon | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Winters, April | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Wittman, Therese | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Wolf, Joseph | The problems caused by coal do not represent a reasonable risk in a world that so desperately needs to slash carbon immmissions. Let's put our money into renewables especially solar where we and the e... |
| Wong, Elaine | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
| Wong, Ella | I would just like to support Mary Vogel's comments from Oct. 14, 2009. "NWPPC Testimony I'm Mary Vogel and I live in downtown Portland in a studio apartment where I have never paid more than $1... |
| Wood, Douglas | I am writing to urge you to use the most energy efficient, least damaging to the environment, methods of power production, and to ensure that you push for as much greenhouse gas reduction as possible ... |
| Wood, John | I was up in the hills above Dufur, Oregon today. I could see every detail on Mt Hood clearly. It is about 15 miles west. I could see Mt Adams clearly about 60 miles north, and behind it was Mt Rainier... |
| Woodall, Linda | Any responsible action would include reducing the amount of harmful substances put into the air and water. I ask that you include provisions for reducing carbon emissions. Please take serious consid... |
| Woodfield, Marion | Coal is only the answer if the technology is found to render it clean. If we can spend billions and billions on our war machine, fly to the moon, explore the universe (on and on), then surely we can f... |
| Woodruff, Liz | November 6, 2009 Mark Walker, Director of Public Affairs Northwest Power and Conservation Council 851 SW Sixth Avenue, Suite 1100, Portland, OR 97204. Dear Council Members and Staff of the NWP... |
| Wright, Linda A. | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Wright, Patti | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan is, in many respects, a good plan. It's proposal to meet all new demand ... |
| Wright, Peter | Hi Thank you for accepting my comment There seems to me little doubt that climate change is real and is mostly cause by human action. We are wise to reduce the activities that contribute to greenhou... |
| Yake, Bill | To the members of the NPCC: Thank you for the opportunity to provide my input on the 6th Power Plan. The 6th Power Plan has its good points. It's proposal to meet all new demand for electricit... |
| Youngberg, Eric | Dear Mark, I am unable to attend your important meeting on Wednesday. Please know that I am a firm believer in the cessation of coal burning energy plants. This type of mercury causing pollution ... |
| Yurk, Rick | Let's take coal out of the picture completely, let's retrofit Boardman to use another fuel stock. Let's look at distributed power ideas, and natural gas or biofuel fuel cells. Let's be aggressive, inn... |
| Zackheim, Hugh | I support a NPCC Power Plan that: -- Preserves strong energy-efficiency and renewable-energy targets -- Sets goals to reduce CO2 emissions in the region -- Phases out coal-fired power plants -- ... |
| Zheutlin, Cathy | I appreciate the efforts you have made to make our world sustainable. Your plan needs to go further. The state of Oregon must cut greenhouse gas emissions, even more than your plan proposes and one ... |
| Zuniga, Suzanne | The plan should have stronger efficiency standards in order to CUT CO2 emissions and plan for phasing out coal completely. Solar energy could be more viable if it was better supported and subsidie... |
| Zupicich, Maryln | The Northwest is on the cusp of being a national leader in addressing climate change and improving our health, environment, and energy future. I applaud the Council's decision to include strong energy... |
Draft Northwest Power Plan recommends mostly energy efficiency to meet future demand for electricity and reduce risk of future electricity shortages and high prices
posted May 10, 2013
PORTLAND, Oregon — The Council invites public comments on its Draft Sixth Northwest Power Plan, which envisions that 58 percent of the new demand for electricity over the next five years could be met with energy efficiency. Over the entire 20-year horizon of the power plan, energy-efficiency, which is the most cost-effective and least-risky resource available, could meet 85 percent of the Northwest’s new demand for power.
“Energy efficiency is the keystone of the power plan,” said Chair Bill Booth, an Idaho member of the Council. “The Council has identified an impressive amount of low-cost energy efficiency, and we’re looking forward to hearing comments about our analysis of that potential.”
The Northwest Power Plan, which the Council revises every five years, advises the Bonneville Power Administration, the federal agency that is the region’s largest electricity supplier with 147 utility customers. Bonneville’s administrator is required to make decisions about future electricity supplies that are consistent with the Council’s power plan. The plan also serves as a regional blueprint to assist electric utilities in their own planning within their service territories.
The Draft Sixth Power Plan calls for achieving 1,200 average megawatts of efficiency over the next five years, or a little over 200 average megawatts per year (one average megawatt is enough electricity to power about 700 homes for a year). In comparison, the Fifth Power Plan called for achieving 700 average megawatts of efficiency over the five-year period from 2005 through 2009, or about 140 average megawatts per year. Through 2008, efficiency improvements totaled 762 average megawatts, exceeding the goal after just four years.
The new plan predicts that demand for electricity will grow by 2,058 average megawatts between 2010 and 2014. If the 1,200-megawatt goal is achieved, energy efficiency could meet 58 percent of the anticipated demand growth. Looking beyond the first five years, the plan predicts that demand for electricity will grow by about 1.2 percent per year over the next 20 years and identifies 5,800 average megawatts of new energy efficiency that could be available over that period to meet 85 percent of that demand. The average cost of the efficiency is half the cost of new power plants.
Future advances in research and technology could lead to transmission upgrades, smart-grid energy management, and power-storage improvements. In addition, the Plan identifies energy efficiency in homes, businesses, and industries in a variety of applications including appliances, consumer electronics, lights, motors, electrical equipment, and building construction.
In addition to efficiency improvements, the plan identifies generating resources including power plants fueled mainly by wind and natural gas to meet the new demand. The plan anticipates no new coal-fired power plants over the 20-year planning horizon.
Since 1983, when the Council issued its first power plan, the regional investment in energy efficiency reduced demand for electricity by 3,700 average megawatts and resulted in only about half as many new power plants being built as would have been without the efficiency improvements. This significant reduction in demand for power, which is equal to the amount of electricity consumed today by all of Idaho and western Montana, saved consumers more than $1.6 billion in electricity costs in 2007 alone compared to the cost of the same amount of electricity from power plants fueled by wind, natural gas, or coal. The reduced demand also means that carbon emissions from the region’s power system are about 14 million tons per year lower than they would be if the demand were met with power from plants that burn fossil fuels.
The new plan, the sixth since the Council issued its first plan in 1983, is posted here, with instructions on how to comment. Public hearings will be held in the four Northwest states over the next two months.
During the public-comment period, the Council is asking for special attention on the following issues:
- Rising prices of electricity over the next 20 years and ways that utilities can help to reduce the effect on their customers’ monthly bills, including development of conservation, renewable resources, and demand-response programs;
- Load-growth projections for the region - short-term (2010-2015), medium-term (2010-2020) and long-term (2020-2030) – and the extent to which the Council’s economic forecasts adequately incorporate uncertainty;
- Conservation targets, the feasibility of achieving those targets, and major sources of uncertainty in achieving them;
- The analysis and evaluation in the Plan regarding future capacity needs and the resources to meet peak load demands in the winter and summer;
- Integration of wind power into the region’s power system and incorporation into the plan of strategies and resources necessary to meet projected future wind power development; and,
- The adequacy of energy and capacity resources, reliability of the regional power system, and appropriate measures of each.
The Council is an agency of the states of Idaho, Montana, Oregon and Washington and is directed by the Northwest Power Act of 1980 to prepare a program to protect, mitigate and enhance fish and wildlife of the Columbia River Basin affected by hydropower dams while also assuring the region an adequate, efficient, economical and reliable power supply.
- Bill Booth, Chair, 208-772-2447
- Melinda Eden, Power Committee Chair, 541-938-5333
- John Harrison, Information Officer, 503-222-5161
Draft Sixth Power Plan
posted May 10, 2013
- Draft Plan and Appendices (replaced by final 6th Power Plan)
- Comments received through Nov 2009
- Public hearings transcripts, video, draft presentation
- Press release
2012 Columbia River Basin Fish and Wildlife Program Costs Report
posted May 9, 2013
This report is available for public comment. This is the 12th year the Council has reported to the Northwest governors on Bonneville’s fish and wildlife costs. The purpose of the report is to provide information, not to assess or comment on the costs. Information in the reports is provided by Bonneville and is not independently verified by the Council.
Comments will be accepted through 5pm Friday, June 7, 2013. Comments may be submitted by email to comments@nwcouncil.org (please write Fish and Wildlife Costs Report in the subject line), or by mail to Mark Walker, Director of Public Affairs, Northwest Power and Conservation Council, 851 S.W. Sixth Avenue, Suite 1100, Portland, OR, 97204.
Flexibility Assessment Methods
posted May 8, 2013 by Ben Kujala
May 2013 Flexibility Metric Meeting
This meeting focused on the current state of flexibility metrics. There was a dual focus of what is currently being done in utility planning processes and what metrics are being used in research.
Agenda
- 8:30 - 9:00 AM - Welcome and introduction - Ben Kujala (NWPCC)
- 9:00 - 9:30 AM - Avista's flexibility overview - James Gall (Avista)
- 9:30 - 10:00 AM - Methods and metrics to assess power system flexibility - Aidan Tuohy (EPRI)
- 10:00 - 10:30 AM - Roundtable discussion on flexibility metrics in utilities
- 10:30 - 10:45 AM - Break
- 10:45 - 11:15 AM - Optimizing flexibility in the short-term and the long-term - Daniel Kirschen (UW)
- 11:15 - 11:45 AM - Path Union CRDC: A new approach to assessing flexibility requirements - Michael Schilmoeller (NWPCC)
- 11:45 - 12:30 PM - Roundtable discussion on flexibility metrics in research
Subbasin Dashboards
posted May 8, 2013
1987 Columbia River Basin Fish & Wildlife Program
posted May 7, 2013
This is a scanned version of the Council's 1987 F&W Program.
Appendices A and B are part of the overall program, appendices C-E listed separately.
- Program (26mb)
- Appendix C (6mb)
- Appendix D (15mb)
- Appendix E (6mb)
To the People of the Pacific Northwest:
The Columbia River Basin is both the source of an extensive network of hydropower resources and the home of a unique assortment of fish and wildlife. In the past, the two have not coexisted without conflict. During the past 50 years, as the hydropower system has grown, the fish and wildlife in the basin have suffered. With its publication in 1982, the Columbia River Basin Fish and Wildlife Program represented the genesis of a concerted effort to rebuild the species that have been harmed by hydropower development and operation. Now, nearly five years later, the publication of the 1987 program provides an opportunity to assess the accomplishments of the past five years and to set a course for future actions.
The program's motto is: ''A debt to the past ... an investment in the future". The 1987 Fish and Wildlife Program describes not only the effort to repay that debt but also the initial returns on the investment. Perhaps the greatest return has been the developing cooperation and consensus among previously dissident factions in the basin. The program is proof that a cooperative effort between hydropower and fish and wildlife interests can yield positive results—results that are beneficial to the economic and social well-being of the Pacific Northwest.
A consensus on a process for rebuilding fish and wildlife in the basin now exists, and it is time to put that process to work to produce tangible results. This program should mark the continuation, not the culmination, of those cooperative efforts. It signals the beginning of a new era of cooperation where all parties share a mutual goal: a healthy basin where the needs of hydropower production and fish and wildlife resources are treated in concert, not in conflict, with each other.
The Council would like to thank former Idaho Council member Larry Mills for his extensive contributions to the fish and wildlife program. Mr. Mills, who retired from the Council shortly before the new program was adopted, was instrumental in shaping the Council's fish and wildlife policies.
Greenhouse Gas Symposium Agenda
posted May 3, 2013
Register for tickets at Eventbrite
AGENDA
- Welcome (Bill Bradbury, Council Chair) 10:00 am – 10:10 am
- Carbon Primer (Charlie Black) 10:10 am – 10:30 am
- GHG Emissions by the Regional Power System 10:30 am – 11:15 am
- Status, including comparison with other regions - Gillian Charles, Energy Analyst, NWPCC
- Outlook, e.g., impacts of coal plant retirements - Steve Simmons, Energy Analyst, NWPCC
- Federal Interagency Estimates of the Social Cost of Carbon 11:15 am - 12:00 pm
- Elizabeth Kopits, Economist, U.S. EPA
BREAK FOR LUNCH ON YOUR OWN 12:00 pm – 1:30 pm
Valuing GHG Emissions 1:30 pm – 3:15 pm
- State Agency Panel on Valuation and Regulation
- OR - Margi Hoffman, Energy Policy Advisor to Governor Kitzhaber
- WA - Tony Usibelli, Energy Office Director, Department of Commerce
- ID - John Chatburn, Administrator of the Office of Energy Resources
- Utility Panel on Valuation in Integrated Resource Plans
- PGE - Brian Kuehne, Manager, Resource Planning
- Pacificorp - Rick Link, Director, Structuring and Pricing
- Avista - Clint Kalich, Manager, Resource Planning and Power Supply Analyses
- Seattle City Light - Dave Clement, Director, Resource Planning
BREAK 3:15 pm – 3:30 pm
Potential Impacts of Climate Change on the Regional Power System 3:30 pm – 4:30 pm
- Federal agencies study of how climate change could impact hydrology and water supplies in the Columbia River Basin - Erik Pytlak, Manager, Weather and Streamflow Forecasting, BPA
- Potential impacts on Northwest hydro system operations - Charlie Black, Director, Power Division, NWPCC
ADJOURN 4:30 pm
LBNL Report on Fast Automated DR for Ancillary Services
posted May 1, 2013
This report covers the potential of commercial and industrial loads in California to provide fast automated demand response for ancillary services. While the Northwest does not have a market for ancillary services there are some interesting take-aways from this report. First, there is a comparison of automated DR to battery storage that puts the cost of automated DR around 10 percent of the cost of battery storage. Then there is an estimate of the ability of commercial loads to shed by end-use and by duration.
The report is available at http://drrc.lbl.gov/node/431.
2008 Program Amendment recommendation
posted May 1, 2013
Error loading MacroEngine script (file: 2008AmendmentRec.cshtml)Recommendations to Amend the Columbia River Basin Fish and Wildlife Program
posted May 1, 2013
- Ad Hoc Supplementation Workgroup (1 comment)
- Baugher, John
- Benewah County, Idaho (1 comment)
- Bonneville Power Administration (5 comments)
- Booker, Mark
- Burns Paiute Tribe
- City of Portland, Oregon
- Clark Fork Coalition
- Coeur d'Alene Tribe (1 comment)
- Columbia Basin Fish and Wildlife Authority (5 comments)
- Columbia Basin Water Transactions Program (1 comment)
- Columbia Land & Timber, LLC
- Confederated Salish & Kootenai Tribes (1 comment)
- Confederated Tribes of Grand Ronde
- Confederated Tribes of the Colville Reservation (2 comments)
- Confederated Tribes of the Umatilla Indian Reservation
- Confederated Tribes of Warm Springs Reservation of Oregon (2 comments)
- Corps of Engineers/Bureau of Reclamation (1 comment)
- Deschutes Basin Board of Control
- East Columbia Basin Irrigation District (1 comment)
- Farrar, John
- Fish Passage Solutions (1 comment)
- Gentry, Dean
- Hood River Watershed Group (2 comments)
- Idaho Department of Fish and Game
- Kalispel Tribe
- Kaser, Sam
- Kelly, Robert W.
- Kintama Research Corporation (1 comment)
- Kootenai Tribe of Idaho
- Ladley, Russell
- Lower Columbia Fish Recovery Board
- Lower Columbia River Estuary Program
- Montana Fish, Wildlife & Parks (1 comment)
- Natural Solutions (1 comment)
- Nez Perce Tribe
- NOAA Fisheries
- NOAA Fisheries Northwest Fisheries Science Center
- Northwest Habitat Institute
- Northwest RiverPartners (1 comment)
- Northwest Sportfishing Industries
- Oregon Department of Fish and Wildlife
- Oregon Department of Fish and Wildlife, Mid-Columbia District
- Pace, Charles
- Pacific Northwest Generating Cooperative
- Pacific Northwest Utilities Conference Committee (1 comment)
- Pacific States Marine Fisheries
- Pacific States Marine Fisheries Commission (re: data mgmt)
- Public Power Council
- Shoshone-Bannock Tribes (2 comments)
- Shoshone-Paiute Tribes
- Snake River Salmon Recovery Board
- Spokane Tribe of Indians (1 comment)
- Stewardship Partners (2 comments)
- U.S. Environmental Protection Agency
- U.S. Fish and Wildlife Service
- U.S. Geological Survey
- Upper Columbia Salmon Recovery Board
- Upper Columbia United Tribes (2 comments)
- Washington Forum on Monitoring
- Washington Governor's Salmon Recovery Board
- Wild Salmon Center
- Yakama Nation (1 comment)
- Yakima Basin Environmental Education (62 comments)
- Yakima Basin Fish & Wildlife Recovery Board
2013-2014 Energy Symposiums
posted May 1, 2013 by Chad Madron
To help support the development of the Council’s Seventh Northwest Power Plan, we are holding a series of symposiums on various power planning related topics. In February the topic was energy storage, in June we will discuss greenhouse gas emissions and the Northwest power system. This schedule will include more symposiums as they are confirmed.
If you have suggestions or comments, contact Chad Madron, 503-222-5161.
| Topic | Date | City | Location |
| Greenhouse Gas and the Regional Power System | June 4, 2013 | Portland | Embassy Suites Airport |
| Pacific Northwest Market | July 8, 2013 | Seattle | Sheraton |
| California Market including: AB32, Integration, SBX12, CAISO, OTC/Songs | September 5, 2013 | Portland | |
| British Columbia including: BC Hydro IRP, CRT, Site C, CO2 Tax | November 2013 | Seattle |
Taking the Puzzlement Out of Scientific Communication
posted Apr 30, 2013

Last week, the Council's power division viewed an excellent video on the importance of communicating scientific information to the public.
It's part of what Power Division Director Charlie Black calls prep work for the next power plan.
"Being able to explain how we develop the plan, its major components, and how different decisions interconnect, will be critical for helping people understand why it matters and how it affects them," said Black.
In the video, actor Alan Alda talks about the importance of connecting the public to science. He discovered through hosting the PBS program Scientific American Frontiers, that the best way for him to understand the complex subject matter was through informal conversations, not scripted lectures.
It's a humorous and heartfelt reflection on why there seems to be a wall, a disconnect, between scientists--or specialists of all kinds for that matter--and the public. You might say we're speaking two different languages. But Alda makes the case for why we must bridge the understanding gap, not just to nurture trust between the public and the science community, but to advance scientific understanding among scientists, too.
The Council's planning includes outreach to the public to begin that two-way converstion; to share information, listen to the concerns of people, and involve them in making important decisions about our energy future. The mid-term assessment of the last power plan was an example of this engagement, and it helped bring into focus some of the most important issues for the next plan to address.
We want to continue to do a better job of reaching people. Some ideas we have for communicating technical information include blog updates, interactive digital projects, and primers on key topics. What have you found to be effective communication tools? We'd love to hear your thoughts. In the meantime, stay tuned to our website for the latest information on building the Seventh Power Plan.
Sixth Power Plan Approval: Transcript and comments
posted Apr 29, 2013
Transcript of the February 10, 2010 Council meeting approval of the Sixth Power Plan; see also the 2-minute YouTube video.
[Bruce] Measure: Let’s reconvene and consider the potential adoption of the Council’s Sixth Power Plan. Terry and John.
[Terry] Morlan: Okay, there’s one change that was worked on a little bit yesterday at the end of the meeting that we wanted to show everyone. It’s in the overview in the fish and wildlife section; it’s on the screen. It is really just making things a little bit more correct; the blue and red changes are what they are. I think that’s been shopped with most of the Council Members so I don’t think there is any discussion, but if there is, this would be a good time, or any other questions they might have about the plan before we move ahead.
Measure: Yes, and what I had in mind was maybe moving the plan first and then going into that discussion arena, John, unless you had something first.
[John] Shurts: No, this is the only thing I had was some language changes and I’m done.
Measure: So you feel that requires the wording with changes as adopted as presented by staff at today’s meeting?
Shurts: Yes, the motion is in front of you.
Measure: So absent any preparatory comments, would you want to make the motion?
Wallace: Thank you Mr. Chair. It is my distinct honor to move that the Council adopt the Sixth Pacific Northwest Conservation and Electric Power Plan as presented by staff and recommended by the Power Committee with changes adopted by the members at this meeting; direct the staff to prepare the supporting appendices and a Response to Comments for Council review and approval; direct the staff to make the necessary editorial changes to the plan with review by an editorial review committee named by the Chair to assure that all such changes are truly editorial; and direct the staff to give appropriate notice of this action.
[Melinda] Eden: I’ll second that motion.
Measure: Did you have some further comments, any questions or comments from the members?
Eden: Mr. Chair.
Measure: Member Eden.
Eden: Thank you, Mr. Chair. It is always a big day when the Council considers adoption of a power plan or a fish and wildlife program, and regardless of the outcome of the vote, this is a big day and I thank you for the opportunity to say a couple of things. This is my list of thank you, with a little history. The creation of this power plan began in June of 2007 when Terry Morlan, the power division director, gathered the power staff members of the state and the central offices to identify potential issues in the sixth plan. The Council developed a list of issues, including concerns for climate change, new types of resources and technological improvements and released an issue paper in December of 2007. The Sixth Power Plan which is before you today addresses these issues and others identified by the region. I want to thank the Council Members for their hard work on this plan. This is an excellent plan. It provides the region a path for the future that expands its portfolio of electricity resources and encourages technological innovation for generations to come. Thank you to the Power Committee for its service and attention to this plan and that includes the state energy staffers who have worked very hard on this. This is a highly technical document full of analysis. It is not always easy for policy makers to slog through such technical information, but you were patient and careful in your consideration of the issues that this plan reflects. I appreciate each of the many discussions we’ve had and your comments and questions over the past two years.
Thank you to Terry Morlan and his staff in the power planning division. You have produced analytical work of which we are all proud. I am grateful to each of you for your hard work, your dedication and your technical abilities. Terry, your leadership has been inspirational as are your patients and ability to explain difficult material to policy makers, and I’ve been privileged to work with you closely these last two years as power chair. I would especially like to acknowledge the work of Gillian Charles. She cracked the whip and herded the cats, and kept both Council Members and staff on track. I appreciate her dedication in keeping the moving parts of this plan all pointed in the same direction. She did a great job.
Thank you to John Shurts and the legal division for keeping us on the straight and narrow and out of trouble so far.
Thank you to Mark Walker and his public affairs staff for the work they have already done on this plan and the herculean task they are about to undertake to prepare this huge document.
Thanks to Steve Crow for his oversight of the entire operation; to Judi Hertz for giving the power committee the big meeting room for many months so that the public could attend and participate in our deliberations.
And thanks, too, to Kendra Coles and Denise Bennett for their able assistance in cranking out and distributing the many comments and draft documents involved in arriving at a final destination.
The region deserves our thanks as well. The region’s utilities participated in the creation of this plan as never before. Public interest groups offered adjustments at every phase of the plan’s creation. The plan is better for the input from each of these entities and from each of you Council Members. The well-attended public hearings demonstrate how important this plan is to the region and to its citizens. Thank you to the 769 individuals and entities who took the time and made the effort to comment on this plan.
The plan illuminates a clear path and the region is anxious to take steps along that path. And thank you, Mr. Chair.
Measure: Thank you Member Eden. Member Karier.
[Tom] Karier: Thank you Mr. Chairman. This past summer I was reading an article about the challenging energy situation in the United States, and the article talked about all the issues of carbon, petroleum imports, rising prices, scarcity, pollution, but there is one great potential resource and it was conservation. But unfortunately it was a forgotten resource. It needed to be developed at a local and regional level, because conservation in the Southwest is different than in the Northeast, and different in the Midwest, and unfortunately nobody was keeping track of that resource except in the Northwest, where we have the Northwest Power and Conservation Council which does that exact function and finds and identifies those great resources. And we’ve been doing that for a long, long time.
The Northwest has a great energy heritage. We enjoy some of the lowest power rates in the country; we have for a long time based on our hydropower system. And equally important we have one of the cleanest power systems in the United States. And to have both of those characteristics is unprecedented. It is clean, it is low emissions and low carbon to begin with. And that is as much because of the hydropower system, but it has also been enhanced by our great investments in conservation over the years which the Council has championed throughout this period and the remarkable development of wind power in the last few years. If you were to Mapquest the Northwest energy future, you’d find the Sixth Power Plan. It really is that good; it is bold, it’s smart, it’s a path to preserve and expand the great Northwest energy heritage that we’ve inherited. Member Eden left out one thank you. I think she covered the range there and we’re indebted to everyone that she mentioned, but her own contribution has been immeasurable to this as chair of the Power Committee. She kept things on track and organized and she described this as a very complicated, challenging work and it is, and she kept right on track of it and moved this through and helped everyone who made these contributions come to fruition. As well as our colleagues on the Power Committee and the Council, there has been some great work done. So thank you, Chair Eden, and thanks to the Council.
Measure: Thanks, Member Karier. Member Yost, did you have something.
[Jim] Yost: Mr. Chairman, I can sum up the experience with one word and it addresses all of the participants and the process and it’s “Swell. It was just swell.”
Measure: Member Wallace.
[Dick] Wallace: Thank you Mr. Chair and I’ll just echo the thanks and the good words of the previous speakers. The other thing I’d like to mention is that we’ve really significantly advanced and set our future direction on integration of fish and wildlife and power, and I think that’s great. The other thing that in this day and age is fantastic is that the staff has estimated that energy efficiency alone will create 47,000 new jobs. So this is a great way to look for our energy future and help with creating some of those jobs. Thank you, Mr. Chair.
Measure: Thanks, Member Wallace. And I’d like to reiterate the praise and congratulations to staff and members of the Power Committee. Member Eden, you did a wonderful job of carrying us through this process and I thought you were very equitable in your treatment of all of the members of the Power Committee. It was a difficult time between the disparate types of writing styles, the new nomenclature that we had to learn in virtually every aspect of the power plan. It was a very difficult process; it never was easy. I also want to congratulate Jim Yost and thank him very much for his attempts to bring all the disparate issues and interests to the fore in a very difficult fashion. It was not easy to advocate some of the positions that he took, but we’ve come out with a better power plan as a result of that. And it forced us all to work together very clearly and I appreciate that quite a bit. I want to thank Dick Wallace who sat in on numerous power planning sessions. Webinars are not the most interesting thing in the world and to sit there for six hours when it’s not your primary purpose and then contribute your opinions individually, I thought was heroic. And I want to thank you for that as well. And all the members of the Council, thank you very much.
[Rhonda] Whiting: I’d like to say ditto to what Jim Yost said.
Measure: Okay, ditto the swells. If there’s nothing else, we have the motion, it has been seconded.
Unanimous roll call vote approval.
Update to the Wholesale Electricity Price Forecast
posted Apr 29, 2013
This Wholesale Electricity Price Forecast updates the forecast developed in 2010 for the Council’s Sixth Power Plan, and it reflects the regional changes that have occurred in generating resources, natural gas prices, electricity demand, and state and federal environmental and emission policy. Future electricity prices were evaluated under a variety of CO2 emission regulatory scenarios and high, and low fuel price and demand sensitivities. The new power market outlook has resulted in a significantly lower wholesale price forecast than the Sixth Power Plan’s medium forecast.
- Low spot market prices for wholesale power at the Mid Columbia pricing point are expected to continue but gradually grow over time with the price of natural gas and cost of CO2 emissions.
Large supplies of hydro power in the region, low load growth, significant development of renewable power with low operating costs, and low natural gas prices have combined to keep market prices for electricity low. Continued low spot prices may act to mute price signals, which could discourage future power generation development in the region. Low prices may also affect avoided-cost calculations used for energy efficiency assessments.
- Natural gas prices exert a strong influence on the price of electricity, though gas consumption in the region may not significantly increase. Gas generation in the region is expected to surpass coal for good around the 2021 time frame.
Since natural gas-fired plants are often the marginal generating unit, gas prices play an important role in determining the wholesale electricity price. Variations in the future price of gas could have significant impact on electricity prices for the region.
- Federal and state level greenhouse gas regulatory policies will influence future electricity prices, CO2 emission levels, and resource development. Even without a uniform federal cap and trade system or carbon tax, existing federal and state policies, coupled with low natural gas prices, are affecting CO2 emissions and electricity prices.
The study of CO2 emission trends, along with the impact of various emission policy decisions, has been identified as an important topic for the Seventh Power Plan. During the forecast update, new work was undertaken to model emissions using the same electricity market model that was developed to forecast prices. Modeled CO2 emissions were found to compare well to actual historic emissions for the region, giving confidence to the integrity of future projections using this method. The results from the midterm forecast indicate that the region can expect future CO2 emissions to decline, even without a federal CO2 regulatory cost policy. This is due to coal plant retirements, state and proposed federal CO2 performance standards, along with an increased reliance on energy efficiency, natural gas-fired generation, and wind energy. Modeling results indicate even lower emissions may result from a cost-based federal regulatory policy on CO2 emissions.
- CO2 emissions in the region are expected to drop as wind generation expands and coal plant closures such as Boardman and Centralia occur.
The forecast results indicate that the region can expect future CO2 emissions to decline, even without a federal greenhouse gas regulatory cost policy. This is due to coal plant retirements, state and proposed federal GHG performance standards, along with continued emphasis on energy efficiency, natural gas-fired generation, and continued development of wind and other renewable resources. Modeling results indicate even lower emissions may result from a cost-based federal regulatory policy on GHG emissions.
Demand Forecast Advisory Committee May 23, 2013
posted Apr 25, 2013 by Massoud Jourabchi
Draft Agenda for the first meeting of Demand Forecast Advisory Committee For the 7th Power Plan
May 23rd 2013 start at 10:00 AM closing at 3:30 PM
Large conference room Council offices
(We will have a break for lunch - on your own - from 11:45 to 1:00)
To participate in the meeting remotely go to:
https://www1.gotomeeting.com/join/442844873
Join the conference call:
1-800-786-1922
Participant code:53922423
Meeting ID: 442-844-873
Greetings and introduction of new members
- Review of agenda
- Discussion of Council’s planning process
- A brief over-view of Council’s long-term Demand model
Open Discussion Topic Areas for Key Drivers of load forecast
- Population forecast
- Changing demographics
- Can climate change bring more population to NW?
- Residential Sector new unit additions
- Have you seen a shift from single to multi-family housing?
- Do you see increase in high-rise residential units (4 story and above)?
- How are you planning to incorporate findings from Residential Building Stock Assessment study?
- Commercial Sector floor space addition
- Do you see a slow-down in commercial construction activities?
- Have you seen a shift in building mix?
- Industrial Sector output
- Have you seen re-shoring/ resurgence of industrial sector?
- Do you see a rebirth of industrial sector?
- Is the Growth in large data centers going to continue?
- Transportation sector
- Do you see growth in Electric vehicles continuing?
- Do you think natural gas vehicles are going to take-off?
- Economic Scenarios (Highs and Lows)
Schedule for the 7th Plan
- Timing of the 7th Power Plan
- Schedule for the next meeting/webinar
Project presentations
posted Apr 23, 2013
| Confirmed | Time | Project # | Title | Proponent(s) | Contextual |
| January 17 – Data Management | |||||
| presentation | 8:15 AM | 2004-002-00 | Pacific Northwest Aquatic Monitoring Partnership (PNAMP) Coordination | US Geological Survey (USGS) | X |
| presentation | 8:35 AM | 1989-062-01 | Program Coordination and Facilitation Services (Objective 2) | Columbia Basin Fish and Wildlife Foundation (CBFWF) | |
| presentation | 8:45 AM | 1988-108-04 | StreamNet - Coordinated Information System (CIS)/ Northwest Environmental Database (NED) | Pacific States Marine Fisheries Commission (PSMFC) | |
| presentation | 9:25 AM | 2008-505-00 | Streamnet Library | Columbia River Inter-Tribal Fish Commission (CRITFC) | |
| presentation | 9:05 AM | 2008-507-00 | Tribal Data Network | Columbia River Inter-Tribal Fish Commission (CRITFC) | |
| presentation | 9:40 AM | 1996-019-00 | Data Access in Real Time (DART) | University of Washington | |
| 10:00 AM | Break | ||||
| 10:15 AM | Open dialogue | Data Management - Fish | |||
| presentation | 10:45 AM | 2006-006-00 | Habitat Evaluation Project | Columbia Basin Fish and Wildlife Authority (CBFWF) | |
| see above | 10:55 AM | 2003-072-00 | Habitat and Biodiversity Information System for Columbia River Basin | Northwest Habitat Institute | |
| see above | 11:15 AM | 1989-062-01 | Program Coordination and Facilitation Services (Objective 6) | Columbia Basin Fish and Wildlife Foundation (CBFWF) | |
| 11:30 AM | Open dialogue | Data Management - Wildlife | |||
| 12:00 PM | Lunch | ||||
| January 17 – Program Coordination | |||||
| presentation | 1:00 PM | 1989-062-01 | Program Coordination and Facilitation Services (Objective 6 ) | Columbia Basin Fish and Wildlife Foundation (CBFWF) | |
| presentation | 1:20 PM | 1998-031-00 | Implement Wy-Kan-Ush-Mi Wa-Kish-Wit | Columbia River Inter-Tribal Fish Commission (CRITFC) | |
| presentation | 1:40 PM | 2007-108-00 | Upper Columbia United Tribes (UCUT) Coordination | Upper Columbia United Tribes (UCUT) | |
| presentation | 2:00 PM | 2007-407-00 | Upper Snake River Tribe (USRT) Coordination | Upper Snake River Tribes Foundation | |
| January 18 – Resident Fish | |||||
| presentation | 8:15 AM | 1990-044-00 | Coeur D'Alene Reservation Fisheries Habitat | Coeur D'Alene Tribe | |
| presentation | 2001-032-00 | Coeur D'Alene Fisheries Enhancement-Hangman Creek | Coeur D'Alene Tribe | ||
| see above | 2001-033-00 | Hangman Creek Wildlife Restoration | Coeur D'Alene Tribe | ||
| presentation | 9:15 AM | 1994-047-00 | Lake Pend Oreille Kokanee Mitigation | Idaho Department of Fish and Game (IDFG) | |
| presentation | 9:35 AM | 2007-149-00 | Non-Native fish Suppression in Graham Creek | Kalispel Tribe | |
| presentation | 2007-246-00 | Restoration of Bull Trout Passage at Albeni Falls Dam | Kalispel Tribe | ||
| presentation | 1995-001-00 | Kalispel Tribe Resident Fish Program | Kalispel Tribe | ||
| presentation | 1997-004-00 | Resident Fish above Chief Joseph and Grand Coulee Dams | Kalispel Tribe | ||
| 10:30 AM | Break | ||||
| presentation | 10:45 AM | 1991-019-03 | Hungry Horse Mitigation Habitat Restoration and Research, Monitoring and Evaluation (RM&E) | Montana Fish, Wildlife and Parks (MFWP) | |
| see above | 2006-008-00 | Mainstem Columbia Amendments Research at Libby Dam | Montana Fish, Wildlife and Parks (MFWP) | ||
| see above | 1995-004-00 | Libby Reservoir Mitigation Restoration and Research, Monitoring and Evaluation (RM&E) | Montana Fish, Wildlife and Parks (MFWP) | ||
| presentation | 11:20 AM | 1991-019-01 | Hungry Horse Mitigation/Flathead Lake Restoration and Research, Monitoring and Evaluation (RM&E) | Salish and Kootenai Confederated Tribes | |
| see above | 2002-003-00 | Secure and Restore Fish and Wildlife Habitat in Montana | Salish and Kootenai Confederated Tribes | ||
| 12:00 PM | Lunch | ||||
| presentation | 2002-008-00 | Reconnect Kootenai River with Historic Floodplain | Kootenai Tribe | ||
| presentation | 2002-002-00 | Restore Natural Recruitment of Kootenai River White Sturgeon | Kootenai Tribe | ||
| presentation | 12:40 PM | 1994-049-00 | Kootenai River Ecosystem Restoration (Nutrient project) | Kootenai Tribe | |
| presentation | 1:40 PM | 1988-065-00 | Kootenai River Fishery Investigations | Idaho Department of Fish and Game (IDFG) | |
| presentation Pine video Burns video |
2:00 PM | 2007-170-00 | South Fork Snake River Yellowstone Cutthroat Trout Recruitment and Survival Improvement | Idaho Department of Fish and Game (IDFG) | |
| presentation | 2:20 PM | 2007-003-00 | Dworshak Dam Resident Fish Mitigation | Idaho Department of Fish and Game (IDFG) | |
| 2:40 PM | Break | ||||
| presentation | 3:00 PM | 1992-010-00 | Fort Hall Habitat Restoration | Shoshone-Bannock Tribes | |
| presentation | 3:20 PM | 1997-019-00 | Evaluate Life History of Native Salmonids in Malheur River Subbasin | Burns-Paiute Tribe | |
| presentation | 3:40 PM | 1995-015-00 | Duck Valley Reservation Reservoir Fish Stocking Operations and Maintenance (O&M) and Monitoring and Evaluation ( M&E) | Shoshone-Paiute Tribes | |
| presentation | 4:00 PM | 1997-011-00 | Duck Valley Reservation Habitat Enhancement | Shoshone-Paiute Tribes | |
| presentation | 4:20 PM | 1995-013-00 | Nez Perce Trout Ponds | Nez Perce Tribe | |
| presentation | 4:40 PM | 2002-037-00 | Freshwater Mussel Research and Restoration | Umatilla Confederated Tribes (CTUIR) | |
| presentation | 5:00 PM | 2007-157-00 | Bull Trout Status and Abundance on Warm Springs Reservation | Confederated Tribes Of Warm Springs | |
| January 19 – Resident Fish | |||||
| presentation | 8:15 AM | 1985-038-00 | Colville Hatchery Operation and Maintenance (O&M) | Colville Confederated Tribes | |
| see above | 2007-405-00 | Rufus Woods Habitat/Passage Improvement, Creel and Triploid Supplementation | Colville Confederated Tribes | ||
| see above | 2008-111-00 | Twin Lakes Enhancement | Colville Confederated Tribes | ||
| see above | 2008-117-00 | Rufus Woods Redband Net Pens | Colville Confederated Tribes | ||
| presentation | 1995-011-00 | Chief Joseph Kokanee Habitat Enhancement | Colville Confederated Tribes | ||
| presentation | 1990-018-00 | Lake Roosevelt Rainbow Trout Habitat and Passage Improvement | Colville Confederated Tribes | ||
| presentation | 2008-115-00 | Lake Roosevelt Burbot Population Assessment | Colville Confederated Tribes | ||
| presentation | 2008-116-00 | White Sturgeon Enhancement | Colville Confederated Tribes | ||
| presentation | 10:00 AM | 1995-009-00 | Lake Roosevelt Rainbow Trout Net Pens | Lake Roosevelt Development Association | |
| 10:20 AM | Break | ||||
| presentation | 10:30 AM | 1991-046-00 | Spokane Tribal Hatchery Operations and Maintenance (O&M) | Spokane Tribe | |
| presentation | 1994-043-00 | Lake Roosevelt Data Collection | Spokane Tribe | ||
| 1995-027-00 | Lake Roosevelt Sturgeon Recovery | Spokane Tribe | |||
| 2007-372-00 | Lake Roosevelt Sturgeon Hatchery | Spokane Tribe | |||
| presentation | 11:30 AM | 1991-047-00 | Sherman Creek Hatchery Operations and Maintenance (O&M) | Washington Department of Fish and Wildlife (WDFW) | |
| presentation | 2001-029-00 | Ford Hatchery Operations and Maintenance (O&M) | Washington Department of Fish and Wildlife (WDFW) | ||
| presentation | 2001-028-00 | Banks Lake Fishery Evaluation | Washington Department of Fish and Wildlife (WDFW) | ||
| 12:15 PM | End | ||||
| No presentation | 2007-041-00 | Kalispell Road Removal | Washington Department of Fish and Wildlife (WDFW) | ||
| No presentation | 1991-019-04 | Hungry Horse Mitigation-Creston Hatchery | US Fish and Wildlife Service (USFWS) | ||
| No presentation | 2008-112-00 | Resident Fish Loss Assessment | Colville Confederated Tribes | ||
| No presentation | 1988-064-00 | Kootenai River White Sturgeon Aquaculture Conservation Facility | Kootenai Tribe | X | |
| No presentation | 2002-011-00 | Kootenai River Operational Loss Assessment | Kootenai Tribe | X | |
Invitation for public comment on ISRP review Resident Fish, Data Management and Regional Coordination projects
posted Apr 23, 2013
April 2012 update: The Council invites your comments through May 4, 2012, on two Independent Scientific Review Panel reports:
- Resident Fish, Data Management, and Regional Coordination Category Review: Final Review of Proposals, document ISRP 2012-6 (Apr 2012)
- Resident Fish, Data Management, and Regional Coordination Category Review: Preliminary Review of Proposals, document ISRP 2012-2 (Feb 2012)
The Council is in the middle of a process under Section 4(h)(10)(D) of the Northwest Power Act to review project proposals related to Resident Fish, Data Management, and Regional Coordination to implement the Council’s Columbia River Basin Fish and Wildlife Program. As detailed below, the ISRP’s Preliminary Report that is now available for public comment is the first of two ISRP reports in this review that you will be able to comment on. The final ISRP report will be available and posted on the Council’s website on April, 4, 2012, and the comment period will be held open to May 4, 2012, to allow for an opportunity to comment on that report as well.
The Council asked the ISRP to review 80 project proposals in three categories: Resident Fish, Data Management, and Regional Coordination. We welcome your comments on any or all aspects of the ISRP’s preliminary review report and the underlying project proposals. The ISRP concluded in its preliminary review report that 24 of the project proposals meet the ISRP’s science review criteria either in whole or in part or with certain qualifications. In addition, the ISRP made a specific programmatic recommendation that applies to the 17 regional coordination proposals. The project proposals with these ISRP ratings may be found in the list of project proposals on pages 22-24 of the ISRP’s preliminary report, with links from the list to the project descriptions and the ISRP’s review comments. During this review process, there will be no further ISRP review of these 41 project proposals. The Council will consider for its final recommendation to Bonneville: the project proposals, the ISRP’s review of the project proposals, and public comments on the ISRP’s report and project proposals.
As for the remaining 30 project proposals, the ISRP concluded in its preliminary review report that these require further information from the project sponsor before the ISRP may conclude its review. The project sponsors for these project proposals have been asked directly by the Council and the ISRP to respond to the comments in the ISRP’s preliminary report by March 7, 2012. The ISRP will review these additional responses and will issue a final review report that will be posted for public review on April 4, 2012. You may comment now on the ISRP’s preliminary report on these 30 project proposals, wait for the final report to submit to comment, or both. All written comments on the ISRP’s preliminary and final reports and on these project proposals must be submitted to the Council by the close of business on May 4, 2012.
The Council intends for its Fish and Wildlife Committee to consider the project proposals, the ISRP’s reports, and the public comments at the Council’s May 2012 meeting in Hood River, Oregon, on May 8-9. There may be an additional opportunity for oral comment to the Committee at that meeting, and possibly an opportunity for public comment on a draft set of project recommendations to Bonneville as time allows. The Council then anticipates making final project recommendations to Bonneville on all the project proposals in these categories at the Council’s June 2012 meeting in Missoula, Montana, on June 12-13.
For further information, contact Lynn Palensky at (503) 222-5161 or (800) 452-5161.
Thank you for your interest.
FY 2013 Resident Fish, Data Management and Program Coordination Review
posted Apr 23, 2013
- Council recommendation and spreadsheet
- Council staff recommendations
- ISRP Final review and comments
- Council staff update from May Council meeting
- ISRP preliminary review
- Project presentations (Jan 2012)
- Sponsor packet
- Project list
Background
On September 1, 2011, the Council began a science review of projects in the Resident Fish/Blocked Areas, Regional Coordination (Program Coordination) and Data Management categories under the Council’s Fish and Wildlife Program.
Please email or call any contacts below. For questions about accord projects in this review, contact your COTR or Bryan Mercier. Thanks and we look forward to working with you during this review.
Contacts
- Lynn Palensky , 503-222-5161, General process and review coordination
- Mark Fritsch , 503-222-5161, Project-specific coordination
- Erik Merrill, 503-222-5161, ISRP review and proposal form
- Bryan Mercier, 503-230-3991, Taurus and proposal form (BPA)
RFP for DR as a Resource to Integrate Variable Generation
posted Apr 19, 2013
The Western Interstate Energy Board and the State Provincial Steering Committee have requested a study on the capability of DR to integrate variable generation within the next 3 to 5 year period. The proposed study will summarize the existing research, identify gaps and propose a research agenda, execute a research agenda as described by a task force and prepare a report on best practices. Proposals are due by April 10th. The budget for the proposal is $125,000. The RFP is available on the Western Governors Association website at http://www.westgov.org/wieb/rfp/02-28-13DRver.pdf.
Idaho Power ramps down two DR programs
posted Apr 19, 2013
Idaho Power will ramp down two DR programs in 2013. One program involves residential air conditioners and the other involves irrigation load. Customers who paricipated in these programs will receive continuity payments to help keep the programs intact for future needs. More information is available on the Idaho Public Utility Commission website at http://www.puc.idaho.gov/internet/press/040313_IPCDSMsuspend.pdf.
LBNL Report on Market and Policy Barriers for DR providing Ancillary Services
posted Apr 19, 2013
Lawerence Berkley National Labs released a report on market and policy barriers for Demand Response providing ancillary services. LBNL did not directly study a balancing authority in the Northwest. However, the report looks at a balancing authority in Colorado that is not part of an organized market. The market and policy barriers in this balancing authority have parallels to the barriers that DR faces in the Northwest. The appendices are two tables that identify barriers and actions that can be taken to alleviate these barriers. These tables could be a useful input into a study more focused on the Northwest.
The report and a companion presentation can be accessed on the LBNL website at http://emp.lbl.gov/publications/market-and-policy-barriers-demand-response-providing-ancillary-services-us-markets.
Demand Response Papers, Reports & Presentations
posted Apr 18, 2013
Error loading MacroEngine script (file: GroupNews.cshtml)PNDRP News
posted Apr 18, 2013
Error loading MacroEngine script (file: GroupNews.cshtml)Demand Response Resources
posted Apr 18, 2013
(I'll include a nice jQuery utility to let users sort/filter this table)
| Organization | Description | Date added |
| Demand Response Research Center | A research center lead by Lawrence Berkley National Labs | 2013/04/30 |
Demand Data
| Data Set |
Description |
| California Commercial End Use Survey |
Data on commercial loads in California |
Email Ben Kujala to add modify this list.
Demand Response Standards
posted Apr 18, 2013
(I'll include a nice jQuery utility to let users sort/filter this table)
| Organization | Standard | Date added |
| Standard Insurance | Insurance premiums as related to energy demand | 2013/04/12 |
| Fort Knox | Gold standard, mostly ingots and krugerands | 2012/08/15 |
Email Ben Kujala to modify this list.
Login required
posted Apr 18, 2013
Pacific Northwest Demand Response Project
posted Apr 18, 2013 by Ben Kujala
-
PNUCC Identifies DSM for Capacity in NRF (5.10.2013)
The Pacific Northwest Utilities Conference Committee released it's Northwest Regional Forecast. The NRF identifies Demand-Side Management as a peaking capacity resource of focus to Northwest Utilities. The report can be found at http://www.pnucc.org/sites/default/files/file-uploads/2013%20Northwest%20Regional%20Forecast_0.pdf. -
LBNL Report on Market and Policy Barriers for DR providing Ancillary Services (4.18.2013)
Lawerence Berkley National Labs released a report on market and policy barriers for Demand Response providing ancillary services. LBNL did not directly study a balancing authority in the Northwest. However, the report looks at a balancing authority in Colorado that is not part of an organized market. The market and policy barriers in this balancing authority have parallels to the barriers that ... -
Idaho Power ramps down two DR programs (4.3.2013)
Idaho Power will ramp down two DR programs in 2013. One program involves residential air conditioners and the other involves irrigation load. Customers who paricipated in these programs will receive continuity payments to help keep the programs intact for future needs. More information is available on the Idaho Public Utility Commission website at http://www.puc.idaho.gov/internet/press/040313_... -
RFP for DR as a Resource to Integrate Variable Generation (2.28.2013)
The Western Interstate Energy Board and the State Provincial Steering Committee have requested a study on the capability of DR to integrate variable generation within the next 3 to 5 year period. The proposed study will summarize the existing research, identify gaps and propose a research agenda, execute a research agenda as described by a task force and prepare a report on best practices. Prop... -
Mason County PUD No. 3 Renewable Demand Response Pilot (6.18.2012)
This is a report on the results of the Mason County PUD No. 3 water heater pilot. This Northwest pilot involved 100 water heaters. Control of the water heaters was used to explore the potential for peak shaving and renewable integration. This report is available at http://www.masonpud3.org/conservation/docs/rdr1_pilotproject_mcpud3_finalreport.pdf.
Energy Forecasts
posted Apr 17, 2013
The Council forecasts regional demand for electricity, wholesale market prices for natural gas, and wholesale market prices for electricity in developing its power plan. The forecasts are also used by utilities, regulatory agencies, state energy policy offices, and other organizations in their planning, and they are now available on a more regular basis, including annual updates.
- Update to the Wholesale Electricity Price Forecast and methodology (Feb 2013)
Fourth Power Plan
posted Apr 16, 2013
Use the following links to connect to other related sites, or to download related documents
- Bonneville Power Administration
- Comprehensive Review of the Northwest Energy System
- The Council's Columbia River Basin Fish and Wildlife Program
- Federal Energy Regulatory Commission
- New York Mercantile Exchange
- Response to comments
- Appendix A - Pacific Northwest Generating Resources (180k PDF)
- Appendix B - Hydropower Availability in Response to Salmon Recovery (50k PDF)
- Appendix C - Fuel Price Forecasts (100k PDF)
- Appendix D - Economic and Demand Forecasts (170k PDF)
- Appendix E - An Analysis of the Western Power Market (70k PDF)
- Appendix F - Generation Cost and Performance (670k PDF)
- Appendix G - Conservation Cost, Performance, and Value (2.1mb ZIP)
- Appendix H - Description of Resource Analysis Model -- ISAAC (240k PDF)
- Appendix I - Environmental Cost Methodology (30k PDF)
- Appendix J - The Model Conservation Standards (40k PDF)
- Appendix K - Renewable Resource Confirmation Agenda (20k PDF)
- All appendices (3.4mb ZIP)
Fourth Power Plan
posted Apr 16, 2013
- 8-A. Goals of the Northwest Power Act
- 8-B. The Council's Power Planning Innovations
- 8-C. The Future Role of the Council
- Council Functions under the Northwest Power Act
- Providing Energy Information
- Brokering Information
- Facilitating Regional Goals at Federal and State Levels
- Impartial, Long-term Analysis of Issues
- Analyzing the Interaction Between Fish and Power
- Representing the Interests of the States and the Public
- Convening Forums to Resolve Regional Issues
- New Roles for the Council?
- No Role for the Council?
The Council was established to respond to a very different world than the region faces today. Some of the Council's past roles are less important, or even unnecessary, in this new world. Other roles seem to have continuing relevance during the transition to a new industry structure and, possibly, beyond.
In developing this draft power plan, the Council faced challenges that are far more significant than any it has faced in the past. Technological and regulatory changes are sweeping the energy industry and are certain to affect the industry's basic structure. To the extent that effective electricity markets can be facilitated, the Northwest stands to gain greater economic efficiency in its power system more quickly than could be accomplished by regional planning. Regulation and planning are, at best, approximations of what can be achieved by a well-functioning market. Thus, the focus of this plan is on understanding the coming changes, explaining them to the public, and opening a discussion of ways that the region might facilitate an orderly transition to an effective competitive market.
At the same time, new approaches need to be identified to achieve some of the goals of the Northwest Power Act that may not be achievable in a competitive marketplace. Energy efficiency, renewable resource development and environmental protection are all goals of the Act that are unlikely to be strongly supported by a competitive industry.
8-A. Goals of the Northwest Power Act
As the Pacific Northwest Electric Power Planning and Conservation Act (the Act) was being debated, it was thought that the region was facing impending power deficits. The resources that utilities planned and began to build to meet those deficits were large, expensive, environmentally controversial and took many years to site and construct. Those on which construction was begun had the consequence of raising power rates from the federal system by more than 500 percent, even though most were never completed.
The Power Act put in place an ambitious experiment in regional planning. It was a balancing of interests that integrated power generation, system reliability, environmental concerns, energy efficiency, and the costs of new and existing resources. It sought to involve the public in making decisions about the composition of electricity resources that would meet the region's future electricity needs.
The specific purposes of the Act are, among others:
- To encourage conservation and efficiency in the use of electric power;
- To encourage the development of renewable resources;
- To assure the region of an adequate, efficient, economical, and reliable power supply;
- To provide for the participation and consultation of the states, local governments, consumers, customers, users of the Columbia River system and the public at large in:
– the development of regional plans and programs related to energy conservation, renewable resources, other resources, and protecting, mitigating and enhancing fish and wildlife resources;
– facilitating the orderly planning of the region's power system;
– providing environmental quality; and
– the protection, mitigation and enhancement of the fish and wildlife, and their habitat, of the Columbia River Basin.
To carry out the power-related purposes of the Northwest Power Act, Congress gave the Council explicit responsibilities. The Council is to develop and periodically revise a regional, long-term conservation and electric power plan. That plan is to incorporate:
- Priority for cost-effective resources with first priority given to conservation, second to renewable resources, third to resources using waste heat or that have high conversion efficiency, and fourth to all other resources;
- An energy conservation program including model conservation standards;
- Recommendations for research and development;
- A methodology for determining quantifiable environmental costs and benefits;
- A demand forecast of at least 20 years and a forecast of the resources required to meet Bonneville's obligations;
- An analysis of reserves and reliability requirements; and
- The Columbia River Basin Fish and Wildlife Program. [ 16 USC §839 b(e)-(f).]
In developing this plan and in regional power policy generally, the Council is to ensure "widespread public involvement." [ 16 USC §839 b (g).]
The acquisition of conservation and other resources by the Bonneville Power Administration is to be consistent with the Council's plan. The Council can choose to subject proposals for major resources (over 50 megawatts for five years or more) to a test of consistency with its plan. If the Council finds a resource inconsistent with its plan, and Bonneville still wishes to acquire it, the administrator must get specific congressional authorization. [ 16 USC §839 d(c).] This is the Council's most important authority over Bonneville's resource acquisition, and even this authority is indirect.
When the Act was passed, it was anticipated that Bonneville would back the acquisition of resources for the whole region – for investor-owned utilities as well as for publicly owned utilities. As a consequence, although the authority of the Council's planning is limited to Bonneville, it was anticipated that it would influence the resource acquisitions of investor-owned utilities. As it turned out, investor-owned utilities did not place significant loads on Bonneville. Nonetheless, the adoption of integrated resource planning rules by the region's state utility regulators and the involvement of the Council in the development of utility integrated resource plans meant that the Council has had significant influence beyond the limits of its direct authority.
8-B. The Council's Power Planning Innovations
The region's first electricity plan was completed by the Council in April 1983, just a year and a half after the Council was formed. That first plan was probably best known for its planning innovations. The 1983 plan set the standard for utility least-cost integrated resource planning. In it, the Council developed a number of planning methods that continue to be prominent in utility integrated resource planning today.
- The Northwest's power plans are developed from the perspective of the entire regional society. The costs that the plans sought to minimize were all costs of power, whether paid by utilities, their customers, or environmental costs that are not actually paid in dollar terms.
- The planning process relies heavily on the participation of both direct stakeholders and the general public. Advisory committees provide a means for interest groups to provide input to and review the work of the Council and its staff. Extensive public hearings provide the opportunity for the public to review and influence the directions of the Council's plans.
- At the heart of integrated resource planning is the consistent evaluation of both generating resources and improved efficiency of energy use. The Council fully integrates efficiency resources into the planning process. Conservation supply estimates are developed to be consistent with energy demand forecasts. Conservation resources compete directly with generating resources in developing a least-cost mix of choices. The costs of resources, both supply-side and demand-side, affect the forecasted price of, and demand for, electricity.
- The Council's plans focus on the inherent uncertainty of the future. In the Council's first plan, there was no medium or best-guess forecast of future electricity use, but rather a range of four forecasts with an assumed probability distribution. This focus on uncertainty shifts planning objectives from meeting a best-guess forecast of electricity requirements to developing a risk-averse strategy for meeting an uncertain future requirement.
- The concept of resource "options" was introduced as an important opportunity to reduce the lead time of electricity resources and, thus, help respond to uncertain future resource needs without making huge investments in new power plant construction. The most familiar form of an option would be a pre-designed and pre-sited power plant, that is not completed until the time the plant is needed. This concept was ground-breaking in an era when the lead time for new generation was as long as 10 years.
- An "action plan" was included to chart an explicit course for the plan's implementers to follow for the first couple of years following the plan's adoption. The action plan is critical to achieving the goals of the plan, and it provides a means of tracking progress and identifying problems.
8-C. The Future Role of the Council
The Council's direct authority over the operation of the region's power system has always been limited, and is likely to be applied even more rarely in the future. For example, if Bonneville is not acquiring new resources, the Council's review authority under the Act will never be exercised. Bonneville currently has a surplus of electricity. As a consequence, it may not be acquiring resources in the near term. Any guidance the plan provides for Bonneville's resource acquisition is thus essentially moot for the time being.
In the past, the Council's plans have not relied on regulatory authority for their impact. With respect to the region's investor-owned utilities, the role of the Council's plan has always been indirect and, at best, limited. Wholesale competition and the potential for retail competition appear to be weakening what have been the primary vehicles for Council influence – the state utility commissions' requirements for integrated resource planning and conservation. As the utility industry evolves in the direction of greater competition, it is quite possible those requirements will not be retained.
Similarly, the plan's influence over the public utilities also has been indirect. In large part it has been exercised through Bonneville, although in several instances the Council has worked with the utilities themselves. Many publicly owned utilities actively embraced integrated resource planning and conservation and worked with the Council in their own planning processes. Some did not. In the future, integrated resource planning and conservation may be problematic for the publicly owned utilities for most of the same reasons that affect the investor-owned utilities.
More fundamentally, in a competitive market, is there still a need for the kind of long-term, regionwide planning and broad public involvement that have typified the Council's work? In the future, the development of new resources will likely be the function of an unregulated, competitive wholesale market in which integrated resource planning, as we have known it, will not play a major role. Planning will most certainly take place, but it will be the kind of planning carried out by competitors seeking a market niche in which they can be successful.
The authority of the Council's plan and the relevance of traditional planning will probably be much more limited than has been the case in the past. Some of the mechanisms that enabled the Council and its plan to influence the actions of regional power actors may be less effective. However, there may still be activities the Council can carry out that will be of value to the region. The questions for the Council and the region are:
- Are there power-related functions that the Council already performs or could perform under its current mandates that will be useful to the region in a more competitive electricity industry? In particular, are there functions the Council can fulfill that can provide appropriate public policy guidance for the transition to a more competitive electricity industry?
- Are there new functions that the Council should be authorized to carry out?
Council Functions under the Northwest Power Act
There are a number of activities the Council carries out or could carry out with no changes in the Northwest Power Act that may be of value in a competitive electricity industry. In most instances, these are activities the Council and its staff already perform in the course of developing and, subsequently, trying to facilitate implementation of the regional power plan. They include:
- Providing up-to-date information on future electricity demands, new generating and efficiency technologies, system operations and market forecasts;
- Serving as a broker for information exchange among utilities and others;
- Working at federal and state levels to resolve legal and institutional barriers to accomplishing regional goals;
- Providing impartial analysis of issues with a long-term regional perspective;
- Serving as a focus for analysis of the interactions between power and fish;
- Representing the interests of states and the public in power issues; and
- Being a regional convener of forums to resolve issues.
The information the Council develops in the course of its planning – forecasts of electricity demand, analysis of new resource costs and availability, and so forth – has been useful to the utility industry and others for their own planning and decision-making. This information could continue to be useful in the future. Some in the industry will be deciding whether to purchase electricity from the market. Others may be developing resources for the power market and facing considerable risk in the process. Everyone will need to know the rules they face and which resources would be the best choices. Futures markets and other financial instruments can distribute financial risk, they cannot eliminate it. The efficient functioning of markets depends on quality information and accurate interpretation of that information.
The Council could focus its information activities to facilitate the transition to and operation of the market. To be of value in a fast moving competitive market, information will have to be produced and revised more frequently than has been the case in the past.
There will, of course, be other providers of such information. Consultants, for example, will produce resource assessments and forecasts, but business imperatives will lead them to restrict access to their information, if they can. Is there value in having an independent entity, such as the Council, develop this sort of information and disseminate it broadly?
Brokering Information
The Council has frequently functioned as an information broker – facilitating the exchange of information among utilities and others about problems and solutions of mutual concern and bringing together potential participants in transactions. Some of this brokering the Council has carried out through its publications, meetings and conferences, or through financial support of similar functions carried out by others. The Council's brokering has frequently been most effective in bringing together those who might not otherwise talk to one another on a regular basis – utilities and local governments, for example. This kind of information exchange may remain valuable, but may also become more difficult, if competition between utilities and other participants in the market for electricity becomes prevalent.
Again, others can and do perform this function. The Public Power Council, the Northwest Public Power Association and the Pacific Northwest Utilities Conference Committee, for example, have also performed this role for their members and will probably continue to do so to some degree. As the market becomes more competitive, market intermediaries will likely emerge who will perform some broader information brokering functions. Nonetheless, there may be a continuing role for the Council, with its regionwide reach, to bridge the inevitable communication gaps.
Facilitating Regional Goals at Federal and State Levels
The Council has frequently worked at federal and state levels to resolve legal and institutional barriers to the accomplishment of regional goals. The Council's status as representative of the governors of the four Northwest states gives its recommendations unique weight, both within the region and at the federal level, where the region's congressional delegation has been generally supportive.
The Council was the catalyst for the adoption, implementation and enforcement of energy-efficient building codes in several Northwest states and local communities. The Council facilitated conservation activities, such as the Manufactured Housing Acquisition Program, which helped establish more efficient federal standards for manufactured housing. The Council also supported action on national appliance efficiency standards.
These kinds of activities, which helped transform industries and markets to become more efficient, are likely to continue to be important in the future.
Impartial, Long-term Analysis of Issues
One of the Council's primary strengths has been its ability to focus relatively impartial analytical attention on power issues the region faces. The Council takes a long-term perspective on the region's energy system, a focus that is more likely to be neglected by competitors preoccupied with near-term concerns. The Council also takes the perspective of the region as a whole, which can identify issues and solutions that might be missed by parties whose private interests are more narrowly focused. The need for the Council to continue to provide a long-term, regional perspective was voiced repeatedly by a wide range of interested parties during consultations the Council held in the course of developing this draft plan.
As the region makes the transition to a more competitive electricity industry, there will be many issues about that transition on which an independent analytical perspective will be valuable to the region. One might question the continued usefulness of the Council's analysis once the competitive electricity market has matured; commodity markets, such as those for shoes or corn flakes, raise few issues of public policy that require independent analysis.
However, the electricity industry will not be completely deregulated. The areas that are regulated will continue to be public concerns. Moreover, the importance of electricity to the economy and environment of the Northwest, and the fact that so much of the region's electricity is generated by a public resource – the Columbia River system – make it likely that there will be continued value in an independent source of analysis of the region's energy system.
Analyzing the Interaction Between Fish and Power
The significance of the operation of the Columbia River hydropower system to the Northwest's overall power system, as well as to the region's fish and wildlife resources, would argue for an ongoing role for an organization like the Council, which is required to balance these resources. Given the contentiousness of the issues, the high stakes involved and the technical sophistication of the analysis required, the Council's ability to analyze the effects of different hydropower system operational regimes should continue to be of value for the foreseeable future. There has also been the suggestion that the Council should undertake an even broader analysis of the multiple uses of the Columbia and its watershed.
Representing the Interests of the States and the Public
The Council was established in part to give the Northwest states and the public a greater voice in decisions about the region's power system. This was largely because electricity is so important to the economy and environment of the Northwest. In addition, the fact that much of the Northwest's power industry is federally owned and has monopoly status has given the public a particular interest in decisions that affect the industry. This public interest is likely to continue while the industry makes the transition to competition. There will be many issues in that transition about which the states and the public will want to have a voice. In such cases, the Council's regional perspective can make a significant contribution.
In the longer run, the Council's role in representing the states and public will depend on the nature of the market that evolves. A fully competitive market should enable consumers to influence industry decisions through customer choices. As noted above, however, a continued public policy content seems likely. In addition, a continued significant federal presence in some form in the regional power system seems likely, although not certain. This in itself would argue for some vehicle like the Council to represent the interests of the four states and the public.
Convening Forums to Resolve Regional Issues
The Council, representing the governors of the Northwest states, has the ability to convene regional forums to work for the resolution of regionally important issues. This ability will be particularly important in the transition to a competitive electricity industry. How the structure and regulation of the electricity industry evolve will, determine in large part, the degree to which the benefits of competition are achieved and how they are distributed. And while the Northwest is clearly part of a wider electricity market, a vital element of that market will be supplied by the resources of this region. There will be many issues of importance to the region that will have to be resolved on the way to more widespread competition. The Council is well situated to convene the stakeholders for the resolution of such issues. In the longer run, the ultimate nature of the market for electricity and the degree of public policy content of issues will dictate the need for this kind of activity. It seems likely there will be some continuing need for such a function.
New Roles for the Council?
New roles for the Council will depend, in large part, on how the region and the electricity industry adapt to the emergence of competition. For example, will the region find that new mechanisms to fund and implement conservation and renewables are necessary? If so, some entity may be needed to plan and possibly administer those mechanisms. Whether the Council is the appropriate entity is another question, but its expertise and regional purview have significant advantages.
There will inevitably be new needs that arise as the industry's transition proceeds. When these needs align with the Council's strengths – strong analytical capability, regional purview, multipurpose scope, the influence of the governors of the Northwest states – the Council should be a candidate for accomplishing them. Many of the new power-related roles for the Council would require legislation at the federal level and/or in the states. For that reason, the validity of potential roles will appropriately be subjected to intensive public scrutiny.
No Role for the Council?
It would be disingenuous to suggest that the power system of the Northwest could not function without the Northwest Power Planning Council. No other region has an equivalent institution. The power systems in those regions appear to function reasonably well, although in few others is there a public resource equivalent to the Columbia River's power system.
Inevitably, the move to a competitive electricity industry will lessen the influence of regional planning in favor of entrepreneurial strategy. The transition is also likely to lessen consideration of public values in decision-making and possibly even diminish the sense of the Northwest as a region. The policy question the Northwest must resolve is whether there needs to be a continuing means for reflecting the region's values in power decisions and, if so, whether the Council is the appropriate institution to facilitate that process.
Fourth Power Plan
posted Apr 16, 2013
- 7-A. Alternatives for the Federal Columbia River Power System
- 7-B. Consistency with the Principles, Characteristics and Limitations of Competitive Markets
- 7-C. Allocation of Benefits
- 7-D. Public Purposes
- 7-E. Conclusions
This chapter focuses on the role of the Bonneville Power Administration in an increasingly competitive electricity market. The reason for this focus is at least four-fold. First, as a wholesale utility, competition is already here for Bonneville, and it can probably be counted upon to become more intense. Second, Bonneville markets the output of a public resource. As a consequence, Bonneville's governance is more an issue of public policy than is the governance of other utilities. Third, Bonneville is a major and integral part of the region's power system. In an average year, it controls the marketing of almost 40 percent of the electricity sold in the region, most of which is relatively low-cost federal hydroelectric power, and it owns and operates the majority of the region's electricity transmission system. [ Depending on how regional transmission is defined, Bonneville owns between 50 and 80 percent of the region's transmission system.] Bonneville, or its successor, will continue to be a major factor in the region's electricity markets, its economy and its environment. Finally, the federal system has other purposes, public and private, besides power production. As a result, the issues surrounding Bonneville seem more complex.
The subject of the Comprehensive Review is the entire Northwest energy system, but a primary focus of the review is the role of the federal power generation and transmission assets in a competitive power marketplace. A number of alternatives are being discussed for Bonneville. They range from a somewhat scaled-back version of the current federal agency to privatization. The emerging competitive electricity market raises a number of issues for any alternative. Some of the questions and issues that may be addressed in the Comprehensive Review are discussed below.
7-A. Alternatives for the Federal Columbia River Power System
The advent of the competitive market and Bonneville's recent financial difficulties have caused many to ask whether Bonneville should continue to be a federal agency. They point out that federal agencies do not typically compete with the private sector. Advantages such as tax exempt status, greater regulatory autonomy and access to financing from the federal Treasury could be interpreted as giving Bonneville an unfair competitive advantage.
Counterbalancing these advantages, however, are a number of statutory requirements that could hamper Bonneville's competitive position. These include the mandate to serve the requirements of Bonneville's public agency customers, regional preference, prohibition on resale of federal power, cumbersome rate processes and several cost transfers such as the residential exchange, the low density discount and the Bureau of Reclamation's irrigation pumping rate. Several of these are requirements that Bonneville has either recently been successful in removing or modifying or that the agency's representatives have mentioned as in need of relaxation.
Supporters of a less-constrained Bonneville continuing in its present federal status argue that Bonneville must be competitive to meet its responsibility to repay the Treasury and fulfill its "social" responsibilities. Opponents argue that Bonneville may become so competitive that it will be in a position to exercise undue market power.
This chapter considers several alternatives for the Federal Columbia River Power System. These alternatives were chosen to illustrate some of the issues. This is not an exhaustive list. The alternatives are:
- A continuation of Bonneville as a federal agency, but with limitations. For example, it might be limited to marketing the output of the existing system;
- A continuation of Bonneville as a federal agency free to compete in the electricity market with as many constraints as possible removed;
- Sale of the rights to market the output of the Federal Columbia River Power System to a public regional entity;
- Sale of the rights to market the output to a private entity or entities; and
- Leasing the rights to market the output to public or private entities.
Sale of Assets vs. Sale or Lease of Marketing Rights
The list of alternatives is limited to the rights to market the output of the federal power system, not sale of the dams or other generating assets. This does not mean that sale or transfer of the physical assets might not be desirable under certain circumstances or that it cannot be accomplished. However, the multi-owner, multipurpose nature of the Columbia River system greatly increases the complexity associated with a sale of assets compared to a sale or lease of marketing rights.
For example, ownership requires responsiveness to the requirements for a number of public or quasi-public purposes (e.g., flood control, recreation, fish and wildlife, navigation) as well as commercial purposes (e.g., power and irrigation water). This is not an absolute obstacle to selling the assets, since a number of dams in the Northwest were constructed by non-federal utilities for power generation only, with the other requirements imposed as a license condition. However, because of their 50-year term, license conditions are not necessarily as flexible as public ownership in ensuring public purposes are met.
Moreover, political opposition could be increased by a sale of the assets, as opposed to sale of the marketing rights, at least if a proposed sale is to a private buyer. The Federal Columbia River Power System is built on an important natural resource for four states, two nations and many Indian tribes. Giving up public ownership of the dams is not an action that will be undertaken lightly. Apparently the non-power beneficiaries of the Southeastern Power Administration joined the power beneficiaries in opposing the recently proposed sale of that agency, in large part because it was a sale of the dams as well as of the power output. The proposal was killed in Congress.
A sale of marketing rights does involve a number of complexities. An important issue that would need to be resolved with a transfer of marketing rights is the degree of control afforded over the output of the dams. This is an issue for two reasons. The first reason is that the non-power constraints still allow flexibility, although not as much as in the past, in the decision to generate electricity or store water for later generation or other purposes. This flexibility is economically valuable. Bonneville currently uses this flexibility to maximize power value, within the constraints of the Coordination Agreement, dam operations requirements under the Endangered Species Act, and the Canadian Treaty. Any transfer of marketing rights will require a mechanism that can balance the ability to operate the system to maximize the value of power, versus operation of the system for non-power obligations.
A second reason degree of control is important is because of the "upstream/downstream" question. Storage releases from upstream dams usually constitute the bulk of the water flowing past downstream dams. The federal projects dominate the upstream storage capability. Coordination with downstream non-federal parties, primarily the mid-Columbia utilities, is essential both to optimizing the power output of the total system and to retaining the current rights of the downstream parties. The Coordination Agreement was developed, in large part, to resolve this potential for conflict. The issue is one of constraining the purchaser of the federal assets, especially if the purchase were of the dams or other assets themselves, but also if it were of marketing rights that include the flexibility to store water or generate electricity.
The complexities related to a transfer of marketing rights, however, appear much more manageable than those associated with a sale of assets. As a consequence, further discussion of non-federal alternatives will be limited to the sale or lease of marketing rights rather than the sale of generating assets.
Issues in Considering Alternatives
Whatever alternative is considered, it will be necessary to confront a number of issues. Some of the issues derive from the principles, characteristics and limitations of competitive markets discussed in Chapter 3. If Bonneville, or its successor, is to operate in a competitive electricity market, the principles, characteristics and limitations of that market will either apply, or the result will be a less effective market. Among the issues that should be considered in Bonneville's case are:
- The degree of separation of generation and transmission required to ensure that Bonneville, or its successor, cannot restrict competitors' access to the market;
- The degree of market power Bonneville, or its successor, might exercise as a result of its control of generation; and
- The ability to absorb competitive risks and rewards and the degree of congruence between those who take risks and those who reap rewards.
Related to the question of risk and reward are the terms of any sale or lease of the marketing rights and contractual constraints on any transfer of liability for the debt on the Washington Public Power Supply System nuclear projects.
Other considerations derive from Bonneville's historic role in the region, the public and quasi-public purposes Bonneville has fulfilled, and whether these purposes can be fulfilled in the future. These considerations include:
- Allocation of the benefits of the Federal Columbia River Power System through public and regional preference. The benefits are in the form of power sold at cost.
- Other public purposes, such as irrigation subsidies, mitigation of higher costs to serve low-density rural customers, access to the benefits of federal power for the residential customers of investor-owned utilities, and so on.
These issues are discussed in the following sections.
7-B. Consistency with the Principles, Characteristics and Limitations of Competitive Markets
Should Bonneville's Transmission and Generation Assets Be Separated?
Does the ownership by Bonneville, or its successor, of a very large percentage of the high voltage transmission in the region, combined with the rights to market the output of the Federal Columbia River Power System, give Bonneville market power inconsistent with a fair and effective competitive market? Functional separation of generation and transmission has been proposed as a requirement by the Federal Energy Regulatory Commission in its open access notice of proposed rulemaking for utilities under its jurisdiction. In its current form, Bonneville is not under FERC jurisdiction. Nonetheless, Bonneville is undertaking functional separation of transmission and generation within its existing organization. However, many fear that with pressure to repay the Treasury and at the same time keep power prices low, Bonneville will be tempted to exercise monopoly power over the federal transmission system to maximize the value of its power sales. If Bonneville's transmission system were sold along with the marketing rights to the output of the federal power system, it is likely there would still be similar concerns.
Setting up an independent, FERC-regulated grid operator for the region could insulate Bonneville, or its successor, and other transmission owners from monopolistic temptations. However, as long as Bonneville retains responsibility for marketing federal power, it cannot function as grid operator without facing the temptation to exercise undue market power. The conflict of interest between Bonneville as marketer of federal power and Bonneville as grid operator is unfortunate, given Bonneville's obvious strengths in the area of transmission.
Setting up a separate federal transmission agency with control over Bonneville's transmission assets is another option. Establishing FERC jurisdiction over this entity's transmission tariffs identical to its jurisdiction over investor-owned utility transmission tariffs could go far toward limiting Bonneville's market power. This separate federal entity might be able to play the role of independent grid operator, as well.
The idea of privatizing the transmission grid has also been raised. The resulting private transmission company would be regulated by FERC and would be allowed to earn a rate of return on its investment. It is not clear what benefits would be associated with private ownership compared to continued federal ownership. For example, could private ownership and operation of the system result in sufficient efficiencies compared to federal ownership to offset the higher return on investment a private owner would receive? If not, the result would be a net increase in the cost of transmission in the region.
Some have also suggested that it would be possible to sell the transmission system for more than its remaining debt, with the "profit" used to buy down the debt on Bonneville's high-cost generation. Since many of the users of the transmission system are not firm power customers of Bonneville, such a sale might be a mechanism for spreading the cost of Bonneville generation more broadly. This would undoubtedly raise issues of fairness and might not pass FERC scrutiny on the ground it would result in recovering generating costs in transmission charges.
Market Power
A fundamental question that will have to be resolved, whether Bonneville continues as a federal agency or whether its right to market federal power are sold to another entity, is that of market power. Does the entity have market power in any important electrical product as a result of its control over a large portion of the hydropower system? If so, what remedies are appropriate?
Bonneville, for example, clearly has the ability to influence spot market prices, at least at some times of the year. There may be other power products -- storage and load following, for example -- that the hydropower system is particularly able to provide. Competitive markets for these products may not exist. If not, some degree of regulation of their prices may be necessary.
If Bonneville, or its successor, is to be a full participant in the competitive power market, it may be necessary to sell the marketing rights to more than one party. This raises issues of how the output of the system would be allocated. These issues are probably manageable. Limiting Bonneville's role to an allocation of power to its customers, with limited ability for Bonneville to market any residual power, probably accomplishes the same end. If the structure of the wholesale electricity market in the region evolves toward a mandatory pool, it may be possible to mitigate the market power associated with Bonneville power marketing. In such a pool, prices are set by the marginal bid price in any period. Experience in the United Kingdom, however, indicates it is possible to exercise market power through a mandatory pool if there is sufficient concentration of ownership or the rules for operation of the pool are poorly set. The interaction between market structure and market power should be investigated.
Markets, Risks and Rewards
Competitive markets imply the risk of business failure and loss. Conversely, they also imply the possibility of success and profits. Whatever form Bonneville, or its successor, takes in the future, it will have to be able to accommodate the possibility of either profit or loss.
Risk, Reward and Federal Ownership
The risk of long-term loss poses a problem for Bonneville as a federal agency in the transition to competitive electricity markets. Bonneville has long been subject to the risk of year-to-year fluctuations in hydropower output, risks of fish and wildlife restoration costs and risks associated with treaty obligations to the region's Indian tribes. In the past, Bonneville has been able to absorb these risks because its costs have been consistently below market. The advent of competition poses the possibility and, in recent months, the reality that market competitors may undercut Bonneville's prices for extended periods of time.
As a federal agency, Bonneville has no stockholders to absorb the business losses that are bound to happen, to a greater or lesser extent, in a competitive environment. Instead, the federal Treasury ultimately bears the burden of losses in excess of what can be covered by Bonneville's financial reserves. Bonneville has not yet incurred any long-term losses, and past missed Treasury payments were subsequently brought up to date, with interest. However, one of the mechanisms by which Bonneville has lowered its proposed 1996-2001 rates is a reduction of the probability of full, on-time repayment of its Treasury obligations. On the other hand, recent agreements to limit fish recovery costs have raised the probability of meeting the Treasury payment.
As electricity generation evolves toward a fully competitive industry, the possibility of long-term loss needs to be addressed. Stranded costs due to the competitive transition represent one form of loss, but dealing with the current level of stranded costs, difficult as it may be, will only require a one-time solution to a one-time problem. It should not be assumed that losses could not recur due to changes in technology, customer choices, and so forth. Bonneville's financial problems are generally considered short term (over the next three to five years, for instance), but that is not guaranteed. In a competitive market, prices are independent of a company's own costs. Generally, customers cannot be expected to bear any of the burden of either short-term or long-term losses, since they will simply find a different supplier if the current supplier tries to raise prices above market levels.
If Bonneville is to continue as a federal agency, there are at least two risk-related questions that must be answered. First, with the greater risk exposure associated with a competitive market, will the federal Treasury continue to fulfill the risk-bearing function? If not, what are the options for bearing that risk? Second, should the Treasury be exposed to additional risk as a result of new resource development by Bonneville? The Northwest Power Act obligated Bonneville to meet the requirements of its preference customers and authorized Bonneville to acquire resources to meet those requirements. Those customers, however, are under no obligation to purchase power beyond the periods established in their contracts.
Under the Power Act, Bonneville was granted the authority to acquire resources because, at the time, new resources were large, required long lead times and were very expensive. Small public utilities and even investor-owned utilities were not expected to be able to shoulder the risks of such huge investments without federal backing. This is much less the case in today's utility world. New combustion-turbine technologies, for example, are smaller in scale, less expensive and require far shorter lead times to develop. The risks to utilities from resource development are more manageable, and other entities can develop and market these resources. Consequently, if Bonneville is to continue as a federal agency, there may be reason to limit its role to marketing the output of the existing system. Bonneville no longer needs to take on the risks associated with new resource acquisitions because the utilities themselves are more financially able to manage those risks.
Just as a competitive market implies risks, it also implies the possibility of rewards or profits. It is possible to construct scenarios in which Bonneville's costs are once again below market prices. For example, when the debt on the Washington Public Power Supply System nuclear plants is retired beginning in 2011, it appears likely that Bonneville's costs would be well below market prices. When and if this occurs, will the federal government be willing to allow the region to retain the reward in the form of either profits or below-market prices, or will it want to appropriate some or all of the benefit for the Treasury?
Risk, Reward and Regional Public Ownership
One set of alternatives to continued federal ownership of the marketing rights of the federal power system involve some form of regional public lease or ownership. Regional public ownership is a mechanism for ensuring that potential benefits are retained by the region, at least to the extent that the terms of the sale or lease leave room for benefits.
Risk, however, is still an issue. For a general-purpose government entity (e.g., a state or municipal government), shortfalls are managed by shifting budget accounts or raising taxes. For a non-taxing public entity (e.g., a wholesale generation-only analog of a public utility district), probably neither is possible. If market prices fall below costs, and customers have access to the market, there is no entity to absorb the loss. The same holds true for a non-profit, non-governmental entity purchasing Bonneville's marketing or generation assets. One alternative is federal government guarantees of the debt of such an entity. However, as demonstrated by the savings and loan problem of the 1980s, such backing can substantially distort investment incentives and become a major problem for taxpayers, although it is often perceived to be without cost when it is proposed.
Risk, Reward and Private Ownership
In the private corporate economy, stockholders bear the business risks and incur whatever profits or losses result from taking those risks. Stockholders lose if there are stranded costs. They win if their firm is more efficient than its competitors. Privatization of Bonneville's power marketing function would resolve the allocation of risk and reward in a manner that is consistent with the private economy. This includes transferring any return that might be earned by the regional system to the participants in the sale -- the federal government and the private purchaser.
What is an Appropriate Price for the Rights to Market the Output of the Federal System?
Any sale or lease of the marketing rights for the federal power system involves determining a price. The process of determining a price is one of assessing potential risk and potential reward. Under most circumstances, no one should pay more than market value, and the Treasury should not accept less than embedded cost, unless it is greater than the expected market value. Of course, in this instance, the assessed market value is not certain. Market value depends on the relationship between future costs and the future market price of electricity, both of which can be estimated, but not known. Consequently, there is a great deal of room for negotiation of the price. Because of this uncertainty and the possible desire for immediate deficit reduction, the government could accept a price lower than embedded cost.
In trying to establish market value, it is important to specify the operative time horizon. With a short time horizon (the next five-year rate period, for example), there may be little difference between the market value of the output and embedded cost. Over a longer term (a permanent sale, for example), a buyer might expect there to be more market value in a system that is dominated by fixed costs and low variable costs when the environment is one of variable gas prices. On the other hand, the fixed-cost burden might be considered a liability in an environment in which generating costs and efficiencies are being improved, and fuel prices are stable or declining.
There are, therefore, two basic conceptual choices for the term of the transfer: permanent or limited term. A permanent transfer might be the simplest, but it has the greatest possibility of deviations from subsequently observed market values, primarily because of uncertainty-related discounting by the purchaser.
The alternative is a limited-term transfer, for example, an auction every five or ten years. The shorter the term, the closer the result will be to the observed market value of the system output.
The duration of the transferred rights will affect the perceived value of those rights. Uncertainty about future value might be reduced by shorter-term sales. A series of shorter-term auctions may produce higher prices for the sale of marketing rights than a one-time long-term sale if system value rises over time.
Purchasers of a longer-term right would take into account the potential net value above cost in the out years, but that net value would be discounted because of timing and (most likely) uncertainty below a simple sum of the forecast net values. A longer-term sale will produce more revenue up front than a series of shorter-term sales, depending on how purchasers perceive future risks. The relative values of a long-term sale compared to a series of short-term sales would have to be explored further using various parties? discount rates and expectations about net value of the system in future years.
Contract Constraints on Transfer of Nuclear Power Plant Assets and Liabilities
The Bonneville Power Administration assumed responsibility for paying the principal and interest on the bonds for the construction of the Washington Public Power Supply System's nuclear plants 1, 2 and 3. A transfer of the marketing rights of the federal system would have to address this responsibility. A preliminary examination of this question was conducted more than a decade ago. This analysis was focused on sale of the physical assets. The same issues would appear to be relevant to a lease or sale of the marketing rights.
The examination concluded that the various WPPSS-related contracts (bond resolutions, project agreements, net-billing agreements) appear to severely constrain the ability to assign the WPPSS marketing authority and financial liability away from Bonneville without, ultimately, the consent of the bondholders. The only alternative that offered a clear transfer path was to pay off the bonds at the time of transfer. Other approaches that did not require immediate payment were considered possible, but are affected by legal ambiguities that would need to be resolved or do not meet the test of completely transferring the assets away from Bonneville. Resolution of these questions would be a necessary condition for any sale of marketing rights.
7-C. Allocation of Benefits
How the possible benefits of the Federal Columbia River Power System are allocated is an important and difficult question for the region. Any change in the status quo has the potential to alter that allocation of benefits.
The Basis of the Benefits -- the Hydropower System
The essential "regional benefit" provided by Bonneville is financial -- the difference between a free-market price of electricity and the low historic costs of the hydropower system and its associated transmission system, largely constructed by the federal government. While much of that benefit has been diluted by past nuclear investments and by the general lowering of the market price level in recent years, that benefit was substantial at times in the past and could be substantial in the future, depending on changing electricity generating technologies and fuel markets.
Distribution of Regional Benefits
The benefits of the federal hydropower system were widely distributed in the region prior to 1973, when Bonneville's existing 20-year firm power contracts with investor-owned utilities were not renewed. Between 1974 and 1981, customers of investor-owned utilities had no access to firm power from the federal hydropower system. In 1981, as a result of the Power Act's residential exchange provisions, the financial benefits of federal hydropower were again made available to residential and small farm customers of investor-owned utilities. In 1985, Bonneville revised its average system cost methodology, and the residential exchange benefit to investor-owned utility customers was reduced. It is expected to be reduced even more after 1997, with the phase-out of the residential exchange. Although there have been changes over time, the primary beneficiaries of the hydropower system have historically been a wide spectrum of public and investor-owned utilities, and direct-service industrial customers.
The distribution of whatever future benefits can be produced by the system will be, at least in part, a function of the ownership of the rights to market the output of the system and the risk that goes with that ownership. One possible outcome might be continued federal ownership and continued willingness on the part of the federal government to be the ultimate bearer of risk, ensuring that the benefits of the power system go to some or all of Bonneville's traditional regional customers. Bonneville was created to achieve such public purposes as regional development, which go well beyond market risk and reward relationships. Whether the federal government will be willing to maintain the current allocation of risks and benefits in a world of competitive wholesale electricity transactions is a question the region must confront.
If some sale of the marketing rights is undertaken, the terms of the sale will, as discussed earlier, result in some distribution of risk and potential benefits between the Treasury and the buyer. Who the buyer is will determine who receives the buyer's share of potential benefits and risks. A private buyer will take the risks and return whatever future benefits can be produced to its investors. If the buyer is a consortium of Bonneville's current customers, then the risks and the potential benefits would be allocated to those customers. If the buyer is some entity created by the Northwest states, the benefits as well as the risks would go to the states to be further allocated as determined by the states, perhaps to taxpayers or to specific customers.
Marketing and Pricing
Historically, Bonneville has been constrained in its marketing of power from the Federal Columbia River Power System to giving preference first to its public agency customers and second to the region. The restrictions on out-of-region sales have recently been relaxed, but not eliminated. The term of out-of-region surplus sales is limited to seven years, and regional customers retain a right of first refusal on surplus sales (regional customers are given the opportunity to match the price offered by an out-of-region customer).
The marketing restrictions on Bonneville may not be as vital an issue for Bonneville customers today as they once were. The approximate convergence of increasing Bonneville costs and falling market prices have effectively eliminated the price advantage that Bonneville's power once carried. Some Bonneville customers have been willing, at least temporarily, to leave the federal system and the risks associated with that system in order to buy from the market. However, Bonneville's costs may be below market prices in the future. How should the power from the Federal Columbia River Power System be marketed now, when its costs are close to market prices, and in the future, when the costs may be below market prices? Should it be marketed on a preferential basis, with any surplus made available to the broader market, or should its marketing be unconstrained?
A corollary question has to do with the pricing of the power from the Federal Columbia River Power System. The below-market pricing of Bonneville power has historically been the mechanism by which benefits have been delivered to Bonneville's regional constituencies. The marketing of Bonneville power at cost has been a major reason why many Northwest utilities and their consumers have enjoyed rates well below the national average. This raises the question of how possible future benefits, to the extent they can be retained for the region, are to be returned -- in the form of prices that are again below market or in some other form, for example, cash dividends.
However, below-market pricing was one of the main inefficiencies that led to the dramatic over-investment in the region's nuclear plants in the late 1970s. This problem might or might not recur in the future. If the dividend is continued in the form of below-market prices, but Bonneville is no longer in the resource acquisition business (or is in it on the basis of specific acquisitions at market prices), then this distortion will be eliminated. If, however, Bonneville acquires new resources to meet its customers? load growth and sets its prices by averaging the costs of existing resources with those of the new acquisitions, it will be reinstating the price distortions of the 1970s. A better method of conveying the dividend to regional beneficiaries needs to be designed.
7-D. Public Purposes
The Federal Columbia River Power System has historically supported a number of "public purposes" beyond that of providing power to its customers at cost. These have included cost transfers that benefit different classes of customers, such as reduced rates for irrigation and low-density rural customers and the residential exchange that benefits the residential customers of investor-owned utilities. Some would also include centralized funding of conservation, activities to encourage renewable resource development, and other forms of research, development and demonstration. Fish and wildlife costs are a cost of producing power and are among the purposes for which the hydropower facilities are operated. Without attempting to sort out which costs truly cover public purposes, the question for the region is which of the public purposes should be maintained and how the region can best accomplish those purposes in the context of a competitive power market.
The principles of competitive markets suggest that subsidized rates are not the way to accomplish public purposes. Such rates are both inefficient and, because they cause the unsubsidized customers? rates to be higher, they create an opportunity for competitors to exploit. To the extent the power system can earn a profit, public purposes can be supported from those profits. To accomplish this, however, dividends for other purposes must be reduced. How to balance profits and public purposes is a legitimate policy decision that will have to be addressed in the course of the Comprehensive Review.
However, competitive markets don't guarantee profits. It may be that the power system cannot be counted upon to earn a profit or one that is sufficient to support both public purposes and the return requirements of the risk-bearing owners, whether public or private. If that is the case, other non-market mechanisms to support those public purposes may be required. These mechanisms could include a regulatory requirement applied to the monopoly elements of the business, a general tax or a charge for use of the transmission or distribution system, a tax on generation or fuel use, or development standards for new energy facilities.
7-E. Conclusions
Many argue that the Bonneville Power Administration, as currently configured, violates several of the principles for a competitive market. Bonneville combines generation and transmission in one entity. It has substantial market power. Market risk is ultimately borne by the Federal Treasury. And it carries out several public purposes that may be difficult to support in a competitive wholesale power market. At the same time, Bonneville is at the heart of the regional power system and embodies many of the values of the region. Deciding the future role of Bonneville is a key task of the Comprehensive Review of the Northwest Energy System. Successful resolution of the Bonneville question will set the stage for an efficient and competitive regional power system.
Fourth Power Plan
posted Apr 16, 2013
- 6-A. Cost-Effective Conservation
- SIDEBAR--Utilities and Conservation: A New Paradigm
- How Much Conservation has the Region Achieved?
- How Much Remains to be Done?
- Conservation's Benefits, Uncertainties and Risks
- Analysis of the Long-Term Benefits of Conservation
- Effect of Fuel Price, Demand and Hydropower Uncertainty
- Additional Risks and Uncertainties
- Net Annual Expenditures for Conservation Over Time
- Will the Remaining Cost-Effective Conservation Be Achieved?
- Consumer-Developed Conservation
- Conservation Developed by the Competitive Market
- Conservation Development Experiences in More Competitive Markets
- Conservation Program Evaluations and their Estimation of Market Effects
- Additional Opportunities for Conservation Development
- Options for Conservation Development in the Long-Term
- SIDEBAR--Conservation: What to Do Now
- 6-B. A Renewable Energy Strategy
- SIDEBAR--Why People Support Renewables
- Renewables Activities - 1991 to the Present
- Prospects for Development of Renewable Energy Resources
- Value of Renewables Available for Development
- Value of Accelerated Renewables Development
- Findings Regarding a Near-Term Strategy
- Conclusions: Justifiable Elements of a Renewable Resource Strategy
- 6-C. Environmental Considerations
- Environmental Mitigation in Competitive Electricity Markets
- Global Climate Change
- SIDEBAR--International Response to the Climate Change Issue
- Special Difficulties of the Climate Change Issue
- Managing Risk to the Power System
- Analytical Approach
- Power System Cost Analysis
- Regional Actions While Climate Change is Uncertain
There are some resource issues that present a particular challenge in a competitive market. These include developing cost-effective conservation resources, maintaining progress on renewable resources and incorporating environmental considerations in resource decisions. Each of these is discussed in this chapter.
6-A. Cost-Effective Conservation
One of the goals of the Northwest Power Act is to achieve cost-effective energy conservation. However, conservation faces a radically different environment today than it did in prior Council power plans:
- The alternative resource costs avoided by conservation are substantially lower, leaving fewer conservation measures cost-effective by comparison.
- Retail prices for electricity can be expected to move closer to marginal costs, reducing or eliminating one of the economic arguments for utility funding of conservation.
- Competitive pressures make it difficult for utilities to spend money on conservation programs.
These changes, taken together, mean that utilities, including the Bonneville Power Administration, will be unable to secure all the remaining cost-effective conservation as they did in the past. Bonneville is a special case. The agency has long supported efficiency efforts through its public utility customers. As Bonneville began to redesign its approach to conservation, it asked its public utility customers to underwrite more of their own programs. Bonneville at first agreed to provide back up if the utilities were unable to secure enough energy savings to meet regional goals set in the 1991 Power Plan. However, because the public utilities can purchase electricity in a market where other providers do not finance conservation, the Council doesn't expect Bonneville to continue supplementing public utility efforts to meet regional conservation goals.
Nonetheless, cost-effective conservation is still an important resource, and the region must be open-minded and creative in finding new ways to capture the economic and environmental benefits conservation can provide. The Council suggests that the Comprehensive Review and appropriate state forums evaluate the costs and benefits of new mechanisms to acquire conservation beyond what will naturally be developed in the market. The goal should be a competitive market that preserves as much of the conservation benefit as possible.
This section assesses how much cost-effective conservation is available, its benefits and risks, how much will likely be adopted by the market, and what kinds of conservation measures will be a challenge to secure without some extra-market effort. If additional mechanisms for acquiring energy savings are needed, can they be cost-effectively implemented without interfering with the operation of a competitive electricity market?
|
Utilities and Conservation: A New Paradigm In the 1970s and 1980s, the costs to build new generating resources were generally higher than the costs of existing resources. Electricity prices were usually based on average costs, so the revenue from new loads did not cover the costs of building new resources to serve new loads. Serving new loads raised everyone's prices. Utilities became vehicles for spreading the costs of new resources (of whatever type – generation or conservation) among customers, whether or not the customers contributed to load growth. Customers who shared the cost of other customers' service tolerated the situation because their energy bills would have been higher yet if they left the utility to self-generate. In that world, it was reasonable for utilities to have an important role in acquiring conservation. They were already in the business of spreading new-load costs among all customers. Sharing the cost of conservation, while more contentious than sharing the cost of new generation, was not fundamentally different. If a conservation measure reduced the total cost of meeting load growth, it was possible (though not simple) to make all customers better off. Because self-generation was unattractive compared to utility service, and transmission access was restricted, utilities' monopoly franchise was relatively safe, and utilities could impose some cost-shifting on their customers without disastrous effects on their stockholders. The world today is much different. Lower natural gas prices, better generating technologies and the opening of transmission and, possibly distribution, access have or will combine to make it attractive for some customers to leave utilities for independent suppliers or self-generation. Utilities are beginning to respond to this threat by offering these customers prices that approach the marginal cost of service. If competition develops fully, utilities will not be able to allocate to these customers any part of other customers' costs of service (generation or conservation). To the extent that customers do not share others' costs of generation, much of the rationale for sharing the costs of conservation disappears, along with the utility's ability to do so. In a competitive world, new-load revenues cover their own costs, except for environmental externalities. Other customers are mostly indifferent to the efficiency of use by new loads, since new loads pay their own way. As a result, a fully competitive utility cannot sustain cost transfers among customers for investments in conservation, even if the conservation is cheaper than generating alternatives. The utility industry as it stands today is not fully competitive. For example, utilities still have monopoly franchises, and marginal retail prices for some customers do not equal marginal costs. Most utilities, however, are anticipating competition, if not already experiencing some of its manifestations. As a result, the exact role of conservation in the changing world is unclear. Many utilities are taking a cautious attitude toward the further development of conservation as a resource during this current period of uncertainty. Investments in conservation, mostly up-front capital investment, run the risk of becoming stranded investments in a competitive marketplace. Many utilities will continue to pursue conservation because their customers and governing boards want them to do so. But it is unlikely that the part of the electricity business that is competitive will have an interest in, or be able to sustain, large investments in conservation over the long run, unless that conservation is directly funded by the customer who installs the measures. |
How Much Conservation has the Region Achieved?
The Northwest has made great strides toward improving the efficiency of its electricity use. As described in Chapter 4, during the 15 years following the passage of the Northwest Power Act in 1980, the region's consumers secured nearly 1,000 average megawatts of energy-efficiency improvements through utility conservation programs. Utilities paid about half as much for these energy savings as they would have had to pay for alternative electrical resources available during that period.
In addition, there were substantial efficiency gains from improved residential and commercial energy codes. The two most populous states in the region, Oregon and Washington, and several local jurisdictions in Idaho and Montana, adopted energy codes for new residential and commercial buildings that meet the Council's original model conservation standards. These codes, among the most rigorous in the nation, have already resulted in significant savings. They will continue to add hundreds of megawatts of cost-effective savings over the next 20 years and beyond. The work of state energy offices and local governments, combined with Bonneville and utility support, has been critical to the adoption and implementation of these codes.
At the federal level, minimum efficiency standards were established for major residential appliances. The federal energy standards for new manufactured homes were also revised for the first time since 1976. And the National Energy Policy Act of 1992 established new efficiency standards for some lamps, lighting equipment, electric motors, commercial heating, ventilating and air conditioning equipment, and shower heads. These standards will result in savings that do not have to be sought through utility programs.
How Much Remains to be Done?
The amount of conservation that is cost-effective to develop depends upon how fast the demand for electricity grows, future alternative resource costs and year-to-year variations in water conditions. [For example, if economic growth follows the Council's medium-low forecast, the region will need to add approximately 145 average megawatts of new resources each year. However, if regional economic growth is at the Council's medium-high forecast, nearly 425 average megawatts of new resources will be needed each year.] Figure 6-1 shows the amount of conservation that would be cost-effective to develop across a wide range of future electricity use patterns, gas prices and hydropower availability. The amount ranges from a low of about 800 average megawatts, when demand growth and gas prices are low, to a high of about 2,300 average megawatts, corresponding to a future of high demand and high gas prices. The average amount of regionally cost-effective conservation the Council has identified is approximately 1,535 average megawatts. [This is the total amount of conservation achievable, given sufficient economic and political resources, over a 20-year period in the medium forecast. The 1,535 average megawatts of cost-effective potential identified in this plan is very different than the 1,500 average megawatts referenced in the 1991 plan. In this draft plan, the 1,535 average megawatts is the average amount of conservation developed in a 20-year period across all potential futures (such as low and high gas prices or load growth). In the 1991 plan, the 1,500 average megawatts was cost-effective achievable conservation over a 10-year period assuming medium-high load growth.]
Figure 6-1. Distribution of Energy Savings Developed in Alternative Futures

Table 6-1 shows the conservation savings potential by sector and end-use. Approximately one third of this potential is in new and existing non-aluminum-industry facilities. The Council has not estimated the amount of conservation that may be available in the aluminum industry, but there is undoubtedly some additional potential in that sector as well. The next largest source of potential savings is in residential water heating and laundry equipment, which represents about one-fifth of the total potential. New residential and commercial buildings make up about one-quarter of the cost-effective potential. The remaining potential is spread among existing residential buildings and appliances, existing commercial buildings and irrigated agriculture. The average levelized cost of these resources is approximately 1.7 cents per kilowatt-hour. [These levelized costs do not include the 10-percent credit given to conservation in the Northwest Power Act.] This is roughly two-thirds of the cost of new generating resources.
Table 6-1. Average Achievable Conservation Potential by End Use or Sector
Conservation's Benefits, Uncertainties and Risks
The development of cost-effective conservation is the highest priority electricity resource in the Northwest Power Act. To be considered "cost-effective," conservation must be less costly than the next similarly available and reliable generating resource. The goal of each Council power plan has been to find the mix of conservation and new power supplies that produces the lowest total present-value cost of meeting the region's energy service needs. In the near term, to be cost-effective, the levelized cost of a conservation resource must be less than the estimated levelized cost of market purchases from out of region. Once the transmission system cannot accommodate further purchases from outside the region, conservation must have a lower levelized cost than new natural gas-fired combustion turbines.
The Council has historically viewed the costs and benefits of investing in the region's energy future from a long-term perspective. It has tried to weigh the costs of investments made in new resources over the 20-year planning horizon against the benefits they could return to the citizens of the Northwest over the resources' useful lives. The fact that people tend to place greater weight on near-term costs and benefits than those that might occur far in the future is accommodated by discounting future costs and benefits. [For this plan, a base discount rate of 4.75 percent was used.]
Conservation investments have three characteristics that must be taken into consideration in this sort of long-term perspective. First, the costs of conservation are virtually all capital. This means there are no operating costs that can be avoided if, for example, demand grows less quickly than expected or fuel prices fall. Second, for this analysis we have assumed that all energy savings are amortized over 15 years, even though some savings have much longer useful lives. This means the costs are front-loaded, while the benefits are frequently spread out over a longer period. Finally, some of the conservation is very long-lived. As a result of all these factors, a long-term perspective exposes conservation investments to uncertainty and risk.
Countering these characteristics is the fact that the investment in conservation is made incrementally. On average, the pace of acquiring all 1,535 average megawatts of cost-effective conservation would be about 75 average megawatts per year. This means that the region can (and should) regularly revisit the economic merits of further investments in conservation. This limits the risk of potential over-investment. In the following paragraphs, the analysis of the long-term value of conservation is described along with the effects of key uncertainties and risks.
Analysis of the Long-Term Benefits of Conservation
The analysis was structured to estimate first the conservation that is likely to be developed as a result of the momentum of current utility programs and what consumers acting on their own are expected to secure in the longer term. This amounts to 515 average megawatts of conservation available at an average cost of 1.9 cents per kilowatt-hour. This conservation was assumed to be implemented on a fixed schedule: 70 average megawatts per year the first two years, 60 average megawatts per year the next two years, 30 average megawatts the fifth year and 15 average megawatts per year thereafter. The levels and schedule were estimated from a survey of current utility plans, and by identifying those resources that consumers would be more likely to adopt on their own, such as those that increase productivity in an industrial plant.
The remaining conservation was grouped into levelized cost increments of between 1.0 cent per kilowatt-hour and 4.0 cents per kilowatt-hour. These resources were assumed to be developed to meet loads as needed. The most cost-effective resources were developed first.
Table 6-2 shows the average present-value benefit to the region of developing each of the conservation resources. Also shown are the total tons of carbon dioxide offset by the conservation. This could become important should a carbon tax be required to mitigate global climate change.
Table 6-2. Regional Benefit of Conservation Resource Development
[The present-value benefits shown in Table 6-2 do not include the 10-percent credit provided conservation in the Northwest Power Act.]
| Conservation Block | Average Present Value ($ Millions) | Average Megawatts | Carbon Dioxide Offset (Millions of Tons) |
| Utility Momentum Plus Market Driven |
$ 570 |
515 |
27 |
| Less than 1.0 Cents/kWh |
$ 760 |
310 |
16 |
| More than 1.0 and less than 2.0 Cents/kWh |
$ 830 |
525 |
27 |
| More than 2.0 and less than 3.0 Cents/kWh |
$ 140 |
185 |
10 |
| Total |
$ 2,300 |
1,535 |
80 |
As can be seen in Table 6-2, the average total present-value benefit of developing the region's remaining cost-effective conservation potential is $2.3 billion. Investments in conservation, beyond those anticipated to be made by utilities and consumers, could secure $1.7 billion in benefits ($2.3 billion minus $570 million). To place these values in perspective, the estimated present-value cost for all resources, except conservation, needed to meet the region's electricity load growth over the next 20 years is $27.7 billion. By making these cost-effective investments in conservation, this "bill" could be lowered to $25.4 billion.
It is important to acknowledge that the majority of the benefit shown in Table 6-2 occurs over the long term, beyond the 20-year planning horizon. The power plan looks at the value of resources developed over 20 years to meet load growth. However, for a resource built in any given year that has a longer lifetime than the 20-year forecast horizon, the costs and benefits of that resource for its entire lifetime are counted. Consider, for example, either a combustion turbine or an equivalent amount of conservation developed in 2000. Both are financed over 15 years, both have 30-year lifetimes and both will produce or save kilowatt-hours well beyond the 2015 forecast horizon. Figure 6-2 shows the cost profile for these two resources over time.
If these two resources were evaluated only up to the year 2015, all of the costs of the conservation would be included, but the fuel and maintenance costs of the combustion turbine after 2015 would be missed. Until the year 2015, the two resources are fairly comparable in total costs, and both resources produce an equal amount of benefits (i.e., energy). But after 2015, conservation continues to produce savings for the region at very minimal cost. The turbine produces value after 2015, too, but at much higher cost. To capture the benefits and costs of resources acquired by 2015, the costs and benefits over their entire lifetimes need to be incorporated. The effects of uncertainty regarding future electrical generation costs have been addressed in the Council's analysis and are discussed below.
Figure 6-2. Resource Costs and Benefits Valued Over Their Productive Lifetimes

Effect of Fuel Price, Demand and Hydropower Uncertainty
While the average present value of the conservation is of interest, it is important to have a sense of how that value might change with respect to the uncertainty in fuel prices, demand growth and hydropower conditions. Figure 6-3 shows the distribution of present-value benefits produced by the investments in conservation. The acquisition of this additional conservation produces a benefit to the region of between $0 and $4.5 billion over the next 20 years, with an average of $2.3 billion, as reported above. The range of values is a result of the specific combination of economic growth, fuel prices and hydroelectric availability the region experiences over the next 20 years.
On a long-term basis, the conservation investment is robust, with the region always being better off if it invests in conservation. The reason conservation remains valuable over the wide range of futures modeled here is because the conservation is relatively low cost and the cost-effectiveness of additional investments in conservation are continually assessed as the region invests over time. In futures in which low load growth and/or low gas prices occur, the region slows its investments and develops much less than 1,535 average megawatts. The range of conservation development due to such factors is shown in Figure 6-1. Conservation's characteristic of being developed in increments over time is valuable, because decisions about additional development can be deferred until the savings are needed. If the region were to commit today to developing exactly 1,535 average megawatts over the next 20 years, without adjusting for load growth or other factors, there would be a significant number of cases in which present-value costs exceed the benefits.
Figure 6-3. Distribution of Present-Value Benefits of Conservation Over Full Resource Life

Additional Risks and Uncertainties
The Council's base-case analysis accounts for much of the uncertainty associated with fuel prices, demand and hydroelectric conditions. However, there are additional uncertainties and risks to which conservation investment is exposed. While some of these risks reduce the average value of the conservation, in all cases there remains significant value. There are also risks that significantly increase the value of conservation. Many would argue that these risks are at least as likely as those risks that reduce the value of conservation.
Figure 6-4 illustrates the base-case analysis and multiple sensitivity analyses that were conducted.
Figure 6-4. Summary of Conservation Sensitivity Study Results

Market driven and utility momentum: The first bar in Figure 6-4 illustrates average present-value savings to the region if conservation is developed through utility momentum and the market. This is not all the cost-effective savings that could be acquired over the 20-year forecast horizon.
All conservation below 3.0 cents per kilowatt-hour: The second bar shows average present-value savings if all cost-effective conservation is developed. The remaining sensitivity cases in the figure are described next.
Conservation potential reduced by 25 percent: The Council relies on the best information and analysis it can produce in estimating the amount of conservation available for development. However, those estimates are subject to some uncertainty. Some parties have criticized the analysis for estimating too much conservation, others for estimating too little. To evaluate the risk associated with overestimating the conservation potential, the analysis was re-run using the proposed lower estimates of achievable potential – a reduction of about 25 percent. This reduces the average present value of conservation from $2.3 billion to $1.7 billion.
Large loss of firm load: The primary risk the region takes in purchasing conservation is that once the capital is invested it can no longer be used for some other purpose. Virtually all of the cost of conservation is a fixed, up-front capital cost, which is repaid in savings over many years. Once the capital is spent on a conservation measure, there is no simple way to recover its value, other than to wait for the savings to accrue. If the region were to suddenly lose a large amount of load, some of the conservation investment would not be needed.
This possibility was investigated by assuming that the region loses 3,000 average megawatts of electrical load in the year 2005 as a result of industrial plant closures or economic downturn. In this scenario, the development of cost-effective conservation still provides the region with $1.9 billion in present-value savings, compared to $2.3 billion in the base case. This is a result of three factors. First, because the region is already relying heavily on market purchases to meet its needs, it can respond to rapid changes in loads by curtailing purchases. Second, less than 10 percent of the conservation that is typically developed by the year 2005 has a levelized life-cycle cost to the region of more than 2.0 cents per kilowatt-hour. Since it is less expensive than continued market purchases, it retains its value to the region. Third, because the conservation is implemented incrementally at about 75 average megawatts per year, further conservation investment can be reduced when the loss of load occurs.
Cost drop by 50 percent: Another way in which conservation investment could be at risk is if there were some dramatic and unanticipated improvement in generation technology that would reduce the value of conservation savings. This was tested by assuming that some technological breakthrough reduces the cost of new generation by nearly 50 percent (to 1.5 cents per kilowatt-hour) in the year 2005 and that this source of power is immediately available to serve all regional loads. The costs of this resource were assumed to be all variable costs, and thus it would have complete flexibility to be turned on and off to meet load fluctuations. Should this occur, it would reduce conservation's average present-value benefit to the region to approximately $800 million.
Carbon tax added: Not all the risks the power system faces are adverse to conservation. As is discussed later in this chapter, there is the risk that measures might be imposed to reduce emissions of carbon dioxide and other greenhouse gases thought to be contributing to global climate change. This risk was simulated by assuming a tax of between $10 and $40 per ton of carbon dioxide is implemented in 2005. Such measures could increase the value of conservation to the region by between $3.2 and $6.1 billion.
Net Annual Expenditures for Conservation Over Time
As noted above, conservation requires more money up front than purchasing electricity from the West Coast market in the near term. In the longer term, however, conservation reduces yearly expenditures for power purchases and defers new power plant additions. The Council compared the yearly cost of developing conservation versus buying power from the market in the near term and developing gas-fired generation in the longer term to assess the magnitude of the near-term risk created by purchasing conservation. Figure 6-5 shows the annual net cost to the region of acquiring conservation by the year 2015 under three different acquisition schedules.
The first schedule shows the annual net cost of acquiring the 515 average megawatts of conservation utilities are already planning to acquire plus the conservation the market might accomplish on its own. This is labeled "Market Driven and Utility Momentum." The second schedule, labeled "Market Driven and Utility Momentum Plus Conservation Below 3.0 Cents per Kilowatt-Hour" adds the annual net cost of capturing the remaining cost-effective conservation to the 515 average megawatts developed in the first schedule. The third schedule, labeled "Least-Cost Acquisition Schedule of Conservation Below 3.0 Cents per Kilowatt-Hour" develops all conservation in least-cost order. The "zero" line represents the cost of relying on market purchases and new gas-fired generation in lieu of capturing any conservation. A positive figure represents net cost to the region, while a negative figure represents a net savings.
As shown in Figure 6-5, the combination of utility program momentum and consumer actions, results in a pace of conservation acquisition that will require an investment of about $40 million annually more than the cost of relying on alternative resources through the year 2003. [Of the 700 average megawatts of conservation needed to meet load growth through the year 2003, approximately 335 average megawatts are anticipated to be developed by utilities and consumers without further market intervention.] Developing the additional conservation needed to meet load growth would add only approximately $7 million per year in "new" investments beyond those anticipated to result from current utility plans and market expenditures. [It should be noted that actual utility expenditures are expected to be only a portion of this amount due to consumer cost-sharing.]
Net costs are higher in the early years because so much of the conservation results from utility programs and contract commitments that have not been fully adjusted to the lower avoided costs the region is now seeing. As a result, some of this conservation is more expensive than that which would be acquired on a least-cost basis. However, if the region's consumers and utilities are able to develop lower-cost conservation first, roughly the same amount of conservation is acquired, but at about one-third of the annual net cost. This can be seen by comparing the line labeled "Least Cost Acquisition Schedule for Conservation Below 3.0 Cents per Kilowatt-Hour" to the other two lines in Figure 6-5.
Figure 6-5. Annual Net Cost of Conservation Resource Acquisitions
Compared to Reliance on Power Purchases and New Generating Resource Acquisitions

Will the Remaining Cost-Effective Conservation Be Achieved?
It appears that the region could secure significant economic benefits by developing its remaining cost-effective conservation. In the past, Bonneville and the region's utilities were positioned both economically and institutionally to acquire all cost-effective conservation. Competition is changing that. Before discussing whether there is a need for new alternatives, this section discusses how much conservation the region might reasonably anticipate being developed by utilities, consumers and the energy service industry in response to the evolving competitive market.
Utility-Funded Conservation
Historically, Bonneville and the region's utilities have served as the primary agents for conservation resource development in the Northwest. In the near term, the Council's survey of electric utilities indicates that they intend to continue to acquire approximately 250 megawatts of energy savings by the year 2000, or about 60 to 70 megawatts per year.
Among public utilities, informal surveys indicate that many want to continue to offer energy saving opportunities to their customers both as a service and to achieve conservation at lower utility costs. Many of these utilities are augmenting Bonneville funds, carried forward from previous years, to continue conservation over the next few years.
The investor-owned utilities are operating under least-cost planning orders from their regulators. While many of these utilities have reduced their expenditures on conservation, in large part because of the declining avoided cost, they have still committed to developing fairly large amounts of the conservation resource in the next few years. [Avoided costs have come down dramatically since the early 1990s, and as a result, less conservation is cost-effective. This means that the yearly amount of conservation that is targeted by utilities is less than it once was, but in the next few years it is still significant.] Many of the investor-owned utilities have indicated that their plans to carry out conservation programs in the near-term are designed to help position them for a more competitive world in the long-run. This includes reducing the cost of utility conservation programs, focusing on markets where competition could cause the loss of customers, and favoring consumer information and loans over rebates.
As competitive pressures increase, both public and investor-owned utilities are expected to further reduce their efficiency efforts.
Consumer-Developed Conservation
Consumers will continue to develop some conservation on their own, regardless of the actions of utilities or other parties. Consumers invest in conservation for many reasons in addition to the fact that efficiency improvements save them money. These reasons include comfort, productivity enhancements, environmental concerns and so on. [Consumers will also adopt energy-efficiency measures that, if evaluated solely from their electricity benefits, are above the regional cost-effectiveness limit because these measures have significant non-energy value, such as comfort, productivity or product quality improvements. The Council has not attempted to estimate the size of this conservation resource, and it is not included in the estimates of cost-effective conservation discussed in this plan.]
How much conservation consumers will develop depends on how well the market for energy efficiency functions. One criterion for a well-functioning market is prices that accurately reflect the cost of the next increment of consumption. In the past, consumers' power rates were much lower than the marginal cost of electricity. In the more competitive environment, the price consumers pay for electricity will likely converge with the marginal cost of electricity supply. [We expect competition to result in a trend toward unbundling of electricity rates - separating the costs of the kilowatt-hours delivered from the fixed costs of delivering the electricity and lowering the price of the kilowatt-hours. Only through such unbundling can consumers compare their supply alternatives on an apples and apples basis. Lower prices and unbundling will reduce the disincentive utilities experience when conservation cuts into their recovery of fixed costs. It will also reduce the consumer's economic incentive to conserve.] If this occurs, then one of the two key elements of a functioning market will be in place; marginal prices will approximate marginal costs. [Marginal costs are unlikely to reflect all environmental costs of electricity production, so there will not be a completely accurate price signal.]
However, there is another, equally essential element of a functioning market: that buyers and sellers can make well-informed choices. Good information implies that: 1) the decision-maker has timely and accurate knowledge; and 2) the decision-maker has enough confidence in that knowledge to base decisions on it.
The lack of good information in electricity and conservation markets takes the following forms: low awareness of how energy and efficiency could be applied in homes and businesses; lack of adequate and quality information that gives the end-user a clear-cut, reliable course to follow; lack of access to capital and conflicting uses for capital; and a disconnect between the decision-maker contemplating efficiency choices and the consumer who pays the electricity bill. An example of this latter "split-incentive" problem is a home builder who builds a house on speculation and wants to minimize first cost, and the eventual homeowner who will ultimately pay the utility bill and has little understanding of long-term energy costs. The lack of good information in its various forms constitutes a barrier to the functioning of the market for energy efficiency.
There is an old joke about the economist who passes by a $20 bill on the sidewalk. When asked why he passed it by, he replied that it can't be a real $20 bill because somebody would already have found it and picked it up. Despite economic theory, the experience of the past 15 years of conservation implementation is full of examples of $20 bills left on the sidewalk and in homes, offices and factories because of market barriers. Market barriers make it unlikely that consumers will take advantage of all cost-effective energy-efficiency improvements.
An example is the fact that many consumers pass up opportunities to buy more efficient appliances, even when the energy saved by the more efficient appliances, evaluated at the consumers' cost of electricity, would offset the extra capital cost of the appliance in a matter of months. Interpreted as investment opportunities, these efficient appliances can be very attractive to consumers; they might return 30 percent to 50 percent or more on the initial investment. But relatively few consumers evaluate their purchases in those terms. Similar patterns of consumer choice show up in residential and commercial buildings and in the industrial sector.
Conservation Developed by the Competitive Market
There are certain types of activities that utilities and energy service companies are likely to pursue as the emerging industry structure becomes more apparent. ["Energy service companies" are companies that offer demand-side management services, including conservation. The term appears to be evolving, and is now used to denote companies that are interested in general energy services, including choice of fuels and load shifting.] Utilities and energy service companies are interested in providing consumer information to overcome the market barriers described above to the extent that it allows them to make a profit.
The types of products and services that will promote conservation and align with the business interests of utilities or energy service companies are those that promote customer loyalty and satisfaction, or that can be offered at a profit. In a competitive market, the cost of kilowatt-hours from different suppliers will vary only slightly. As a result, conservation services might be one tool in an arsenal of options to differentiate one supplier's product from another's and create customer loyalty.
Manufacturers of efficient products will also have an interest in promoting their products. For example, Honeywell wants commercial building managers to adopt Honeywell's energy management system. However, efficiency is usually just one feature in a whole host of features that consumers are searching for in a particular product. As a result, the market niche for efficient products is usually small, unless it is packaged with key additional features.
The common thread in these approaches to conservation is that they will increase the viability and/or profitability of the company providing the service by offering superior and/or differentiated products that are desired by customers. Mostly they are products or services that can be charged directly to the benefiting customer, and the customer values them enough to pay a price premium. These services cannot be supported by other customers, because the benefits do not accrue to all customers, but to the customer that directly installs the conservation. They are primarily market-driven efficiency services.
The following are the types of conservation services that are likely to be developed in a more competitive electricity market.
Customer retention services: Energy companies that want to build customer loyalty may help the customer find ways to reduce the cost of electricity use. For example, in an effort to retain their business, Puget Sound Power and Light recently included conservation services in a package to one of its larger customers who was investigating alternative power suppliers.
Enhanced services: Some energy companies may elect to offer services rather than energy sales (kilowatt-hours) to their customers. An example might be selling air compression to an industrial firm. Rather than charging for the electricity used to energize the air compressor, the energy service company would charge for the amount of compressed air used. In this situation, it is in the interest of the energy service company to produce the compressed air at the lowest possible cost. If the cost of improving efficiency is lower than the energy cost, they will have an incentive to improve efficiency.
Fees for expertise: Energy companies will sell their ability to help customers reduce their costs, increase their comfort and productivity, or both. The fee represents a sharing of the cost savings between the customer and the energy service company. For example, Western Montana Generation and Transmission Company is considering opportunities such as charging for audits of homes heated with electricity or natural gas.
Differentiation from competitor's products: Some energy providers may try to capture a market niche based on environmental or societal values. These companies will promote "green pricing" or the fact that they are a "green" company, offering energy-efficiency services to secure particular customers. Working Assets Long Distance is an example of this strategy in the telephone industry. A number of electric utilities around the nation, including Portland General Electric and Salem Electric in the Northwest, have tried various approaches to offering green services, with mixed success.
Efficient use of the distribution system: In either a competitive or regulated environment, it will make sense for utilities owning distribution systems to utilize those systems fully. This means reducing power losses on the distribution system itself, as well as load management and load reduction on customers' facilities that might otherwise require more costly system upgrades.
Community values: A number of utilities in the Northwest, particularly some of the public utilities, have offered conservation programs because their customers viewed it as the right thing to do. To the extent that the conservation ethic persists, some utilities will continue to pursue conservation that satisfies their customers.
Conservation Development Experiences in More Competitive Markets
The electricity industry in the Northwest is not the first to undergo major restructuring. The Council reviewed the experience in other countries and industries to assess the probability that conservation's apparent benefits to the region will be secured in a more competitive energy service market. This review revealed the following:
- Experience in all five countries where the electricity industry has been opened to competition shows that the acquisition of conservation tends to decrease in newly competitive markets, and that private conservation companies have not emerged as strongly or as quickly as predicted. [Lance Hoch and Linton Parker, "Sustainable Energy Policy in Competitive Electricity Markets: what's Been Tried, What Works and What Doesn't," Proceedings of the Fourth International Energy Efficiency & DSM Conference: The Global Challenge, Berlin, Germany, October 1995, pp. 503-511.]
- Experience from the U.S. gas industry, which has been deregulated for 10 years, indicates that niche markets have developed for conservation, but it has not been widespread.
- Very recent experience of a few energy service companies indicates that those that do not rely on shared savings and/or utility financial support, but instead provide a building with specific end-use services (e.g., lighting, space conditioning, etc.) for a fixed annual fee (with adjustments for inflation and weather) may successfully penetrate a limited market niche (e.g., large office buildings).
Conservation Program Evaluations and their Estimation of Market Effects
Evaluations of previously operated conservation programs are also a source of information on what the market might accomplish. In some of these evaluations, the utility tried to ascertain how much of the savings might have occurred in the market even without the utility program. [The evaluation community has used the term "free-rider" to denote the portion of participants in a utility program that would have done the conservation on their own. This is an estimate of what the market would have accomplished without the utility program.] For the Northwest, evaluations from the industrial sector provide the most information on what the market would have done without the program. The evaluations indicate that approximately 5 percent to 15 percent of the savings from various programs would have been done anyway, even without the utility's help. This indicates that without some sort of information, or financial help, or both, the market will achieve some, but not all, cost-effective conservation on its own.
Additional Opportunities for Conservation Development
The types of conservation that are most at risk of being bypassed in a competitive market are those that do not align with the business interest of a provider, such as an energy service company. Utilities and energy service companies may not have much business interest in intervening if the conservation resource is small and widely dispersed in thousands of facilities, and the profit margin to pursue each of these individually is small. For example, more efficient refrigerators save individual consumers about $4 per year. This is too little to overcome the high administrative costs of pursuing these savings on a customer-by-customer basis. However, if the savings can be achieved in the aggregate, for example, through the manufacturer, they are significant.
There are several types of conservation resources that may be difficult to secure in a competitive environment. These include:
- State energy codes
- Federal appliance efficiency standards
- Demonstration of emerging technologies and systems
- Market transformation efforts
- Instances in which the conservation decision is not made by the energy bill payer, such as rentals.
Options for Conservation Development in the Long-Term
Of the $2.3 billion in savings that can be expected if all cost-effective conservation is developed, approximately $1.7 billion falls into the category of savings that seem unlikely to be produced through near-term utility commitment or, in the long run, by a competitive electricity market. What follows is a discussion of alternative ways the Northwest can secure the remaining energy savings.
Give the Market a Chance
The Northwest could focus its efforts on developing more competitive electricity markets and wait to see what the effect is on conservation acquisition. Because many utilities still intend to pursue conservation development for various reasons, and some government programs also will garner energy savings, acquisition over the next three to four years is likely to be substantial.
New/Revised Mechanisms
The region could focus on activities that would encourage development of the most cost-effective conservation during the transition to a more competitive electricity market. This might include providing appropriate regulatory signals for existing investor-owned utilities and focusing on resources that might be lost during the transition from the current regulatory compact to any new market. Potential forms of new and revised mechanisms might include the following:
Require conservation as a "public good" in exchange for a monopoly franchise at the distribution level: Even in a competitive electricity market, distribution companies are likely to remain monopolies. They will have no incentive to pursue conservation as a least-cost resource. However, if regulators for investor-owned utilities, and the public for public utilities, think that conservation has benefits that should not be lost, then some level of conservation services on the part of the distribution company might be required in exchange for the monopoly franchise. To make this work, the distribution company should have its profits disconnected from its sales of kilowatt-hours.
System benefits charge: A frequently discussed option to raise funds for conservation resources that might not be captured by the open market is a "system benefits charge." The system benefits charge is a fee assessed broadly across the electricity system that is non-bypassable and is used to develop conservation. Exactly how these funds are raised and how they would be spent would need to be fully explored. [For example, PacifiCorp has initiated a discussion on how to develop conservation in the more competitive world, which looks into exactly these questions. Two white papers have been developed by PacifiCorp to aid in the discussion.] The idea, however, is similar to the levy on phone bills to provide 911 emergency calling and universal service for low-income and physically impaired customers. Almost every active restructuring process in the United States is calling for a system benefits charge or something very similar to maintain some level of energy-efficiency services. The same is true of many international restructuring decisions, such as those in the United Kingdom, Norway and New Zealand.
Conservation as part of meeting load growth or developing new generating resources: Another option that might be used to encourage conservation development would be a requirement that a certain percentage of load growth be met through conservation efforts. Investments beyond the required offset could be banked or sold on an open market. Utilities, generation resource developers and others could obtain, bank and sell conservation offsets. The system would be similar to the market developed around sulfur-dioxide emissions.
Recommendation
Council analysis indicates that there is a substantial amount of cost-effective conservation available for acquisition in the region. Approximately 20 to 30 percent of this conservation will likely be acquired in the restructured electricity industry through market forces and momentum from existing utility action. If the remaining 70 to 80 percent of the savings are not acquired, the result would be higher power system costs than would be the case if the total amount of cost-effective conservation was acquired.
In the regulated utility paradigm, mechanisms to acquire conservation were available that resulted in relatively little disruption of the market. The new utility structure, especially in generation and supply markets, is much more competitive. Competitive markets are sensitive to factors such as cross subsidies or incorrect price signals and will tend to exploit these factors where they occur.
The Council suggests that the Comprehensive Review and appropriate state forums evaluate the costs and benefits of potential mechanisms to acquire conservation beyond what will be developed in the market. The goal should be a competitive market that preserves as much of the net conservation benefit as possible.
These mechanisms should reflect the principles outlined below.
- Any intervention should be competitively neutral, and not give one electricity or other energy resource provider an advantage relative to another. Intervention should not interfere with the market pricing of electricity and the operation of a competitive electricity market. For example, use of a non-bypassable charge on distribution minimizes the ability for competitive electricity suppliers to avoid the charge. At the same time, the magnitude of the charge must not upset the competitive balance between electricity and natural gas or other fuel suppliers.
- Any intervention should complement the competitive market for energy services that might emerge. This might include a strategy for those types of conservation actions that need a kick-start, but that can eventually be handed over to the competitive market. In this case, the strategy should include signals for when to cease the intervention.
- Any intervention should provide some symmetry between those who pay for the intervention and those who receive its benefits.
- Any intervention should be administratively efficient to gain the greatest net benefits possible.
- Any intervention should use competitive mechanisms to the greatest extent possible when acting to secure the conservation resource.
- Any intervention should incorporate performance assurance mechanisms to secure the savings.
|
Conservation: What to Do Now During the transition to more competitive electricity markets, the Council has identified 10 things utilities, regulators, end-users, governments and the conservation industry can do to help maximize conservation benefits, minimize conservation costs and smooth the transition.
|
6-B. A Renewable Energy Strategy
An objective of the Northwest Power Act is "to encourage the development of renewable energy resources within the Pacific Northwest." Renewable resource-based generating projects producing more than 420 average megawatts of energy have been developed since adoption of the 1991 Power Plan. This represents about 17 percent of all resources developed during this period. Encouraging progress has also been made on the renewable resource confirmation agenda set forth in the 1991 Power Plan. However, declining wholesale electric energy prices have resulted in near-cessation of additional generating resource development, and few new renewable projects are expected to be cost-effective in the near-term. This is consistent with the surplus of generating capacity on the Western electrical system, but raises the question of what type and level of renewables activity, if any, is desirable in this environment.
In developing this draft plan, the Council has assessed the value of the renewable resources available for development in the Northwest. This analysis considered load growth, hydropower and fossil fuel price uncertainties in an attempt to capture the resource diversity benefits of renewables. The analysis also considered the possibility of a carbon tax, should aggressive measures to reduce greenhouse gas production be needed. The values of several accelerated renewable resource development strategies, including sustained development, were also assessed and compared to developing renewables only as they become needed and cost-effective.
Based on its analysis, the Council has concluded that few renewable resources are cost-effective in the near-term. Unless carbon dioxide control measures increase the cost of other resources, the large inventory of undeveloped renewable resources available to the Northwest has little expected economic value if current forecasts of technology cost and performance, fuel price, water availability and load growth uncertainties hold. However, the potential value of renewable resources increases substantially if mitigation of carbon dioxide production is required to control global climate change.
A possible strategy of maintaining a set level of sustained renewables development was also analyzed. This analysis also suggests that there is little economic value in a strategy of sustained development of renewables. Projects developed in advance of cost-effectiveness would require a substantial cost premium, they would preclude the benefits of later technological development, and they are unlikely to produce significant economic benefit. This finding holds with consideration of fuel price, water availability and load growth uncertainties and with adoption of relatively high carbon taxes.
Nonetheless, because of the potential value of renewables in the event of control measures on carbon emissions, it is important to improve our understanding of the region's renewable resource potential and to ensure that the better resource areas remain available for development, if needed.
These findings suggest that a renewables strategy for the Northwest should focus on:
- Ensuring that the restructured electric power industry provides equitable opportunities for the development of cost-effective renewable projects;
- Ensuring that the renewable resource potential of the Northwest is adequately defined and that prime undeveloped renewable resources remain available for possible future development. This will require completion of key demonstration projects and resource assessment studies already under way;
- Supporting research and development efforts to improve renewable technology;
- Offering green power purchase opportunities; and
- Monitoring fuel prices, the global climate change issue and other factors that might influence the value of renewable resources. More aggressive preparation for the development of renewables could be initiated if changes in these factors indicate that accelerated development of renewables is desirable.
|
The chief arguments that have been advanced by supporters of renewable resource development include: Favorable environmental characteristics: Long-term and broadly dispersed environmental impacts, such as those linked to nuclear waste disposal, fossil-fuel extraction or atmospheric pollutants, are rare with renewable resources. In many cases, the environmental effects of renewable energy development are limited to the vicinity of the project and are relatively manageable. Improved air quality and few greenhouse gas emissions: Wind, solar and hydropower resources have no atmospheric emissions and contribute no greenhouse gases to the atmosphere. Geothermal plants release comparable or fewer atmospheric pollutants and much less carbon dioxide than fossil-fuel combustion. Biomass combustion releases more pollution than natural gas for generation of an equivalent amount of power. However, controlled burning of biomass residues for power generation is less polluting than the uncontrolled burning of these materials that might otherwise occur, and the carbon dioxide released by combustion of biomass will eventually recycle if sustainable forestry and agricultural practices are followed. Energy cost stability: A diverse resource portfolio, including renewable resources, offers resiliency against fuel price, technology and environmental risks and uncertainties. Local economic benefits: Renewables development can provide long-term employment, royalty and tax benefits to local communities that may not otherwise benefit from power system investments. Regional self-sufficiency: Indigenous renewable resources reduce the need for energy imports and provide protection from fuel or transmission interruptions. Development of products for export: An active domestic renewables industry can create products and services for overseas markets. Non-power direct benefits: Some renewable energy projects, such as landfill gas energy recovery, offer important non-power benefits. Promote a sustainable energy supply: A sustainable society is one in which humans can thrive without progressively degrading the natural environment and for which the living standards of future generations are not diminished by actions of the present. Renewable energy resources appear to constitute an important component of a sustainable energy supply. Public support: Although the development of specific renewables projects may be locally controversial, renewables in general enjoy broad public support. |
Renewables Activities - 1991 to the Present
About 700 to 800 megawatts of renewable resources, primarily hydropower and biomass cogeneration, were identified by the Council in the 1991 Power Plan as potentially cost-effective for development during the 10-year period following adoption of that plan. That plan called for development of these low-cost renewable resources. Since that plan was adopted, renewable projects providing more than 420 average megawatts of energy have been developed, and additional projects remain to be completed. Hydropower and projects using biomass residue fuels provide the bulk of this energy.
Recognizing that the cost of most renewables, though declining, was still higher than alternatives, the Council in its 1991 plan recommended a renewable resource confirmation agenda. The confirmation agenda is a set of coordinated research, development and demonstration activities intended to foster the efficient development of geothermal, solar and wind resources at sites in the Northwest. Confirmation activities include resource assessment, resolution of development constraints and renewable demonstration and pilot projects. These are described in Appendix K.
Many of the confirmation agenda actions have been initiated, though few have been completed. Most successful have been long-term wind and solar resource assessment, geothermal and wind pilot projects, and niche applications of solar photovoltaics. Less progress has been made on actions intended to secure improved resource information at specific sites, with the exception of environmental assessment at sites proposed for demonstration or pilot projects, and solar resource monitoring.
Prospects for Development of Renewable Energy Resources
As discussed in Chapter 5, technology improvements and production economies are expected to continue to reduce the cost of electricity from renewable resources. However, because of declining gas prices and continuing improvement in gas turbine technology, energy from most renewable resources is expected to be more expensive than new gas-fired combined-cycle power plants over the near term. Moreover, most renewables require large capital investments, which must be amortized over a lengthy operating period in order to secure competitive power costs. This is a disadvantage in the currently uncertain and changing utility industry where financial flexibility and minimal long-term capital investment are prized. The intermittent energy production of some renewables further reduces the value of their energy, and may increase the cost of delivering power from remote renewable resources because of the resulting low transmission capacity factor. Finally, though renewables (biomass excepted) are free of fuel price risk, they are susceptible to technology performance risk; the generating equipment must operate reliably over a long lifetime to recover the initial capital investment.
Given these economic handicaps, and absent major shifts in resource economics, such as would result from unexpectedly rapid increases in natural gas prices or adoption of carbon dioxide control measures, few renewable resources are likely to be cost-effective in the near term. Exceptions might include hydropower upgrades, upgraded chemical recovery cogeneration at pulp mills and projects developed primarily for non-power benefits (such as generation using landfill gas).
In the longer term, technology development is expected to improve the competitive position of some renewable resources. Costs should continue to decline for currently immature technologies, such as gasification of solid biofuels; technologies that stand to further benefit from economies of production, such as photovoltaics; and technologies that may benefit indirectly from research and development in other industries, such as geothermal exploration and drilling. The performance of fossil-fuel technologies is also expected to improve, but the effects of these improvements may be offset by escalating gas prices.
Value of Renewables Available for Development
Though few renewables are cost-effective in the near-term, having renewable resources available for development, in case they are needed, may have appreciable economic value. Considering only the uncertainties of water availability, load growth and fossil fuel prices, the expected value of renewables likely to become cost-effective over the 1996 to 2015 period is $28 million. This is compared to a present-value system cost of approximately $26 billion. The range of possible outcomes resulting from water availability, load growth and fossil fuel price uncertainty is not large.
The prospect of greenhouse gas control measures greatly increases the amount and value of cost-effective renewable resources. In this analysis, a carbon tax is used as a proxy for greenhouse gas controls. The tax rate range of $10 to $40 per ton of carbon dioxide emitted that is assumed for this analysis is consistent with fuel tax rates thought to be necessary to induce significant reductions in carbon dioxide production. This analysis assumes that a firm schedule for implementing a carbon tax is agreed to in 2000, and the tax is assessed beginning in 2005. This would provide time to initiate development of carbon dioxide offsets, conservation and renewable resources, and otherwise prepare for the tax. This approach is consistent with the phasing approach for pollutant reduction used in the Clean Air Act amendments of 1990.
The increase in the net-present value of the renewable resource inventory for the range of possible carbon tax levels is shown in Figure 6-6. As expected, carbon taxes result in more, and earlier, development of conservation and renewables. Electrical production cost savings occur by meeting new loads with resources that don't release carbon dioxide and by displacing the operation of existing projects that are sensitive to carbon taxation, such as coal-fired power plants. The expected net-present value of the renewables inventory increases to $86 million, $226 million and $997 million with carbon tax levels of $10, $25 and $40 per ton of carbon dioxide, respectively.
Figure 6-6. Net Present Value of Renewables Available for Development

Value of Accelerated Renewables Development
Because the societal benefits put forth by supporters of renewables development (see Box) are not necessarily incorporated in market-based resource decision-making, the level of renewables development that will be achieved purely on the basis of market prices may be less than the level that would occur if all societal values were considered. Some have argued that the gap between market-driven renewables development and this "societally optimal" level could be closed by establishing a target rate of renewable resource development. Market-driven levels of renewable resource development could be accelerated using resource portfolio standards or system benefit charges.
To assess the value of accelerated renewables development, three levels of developing renewable resources in advance of their need or cost-effectiveness were analyzed:
- Development of 27 average megawatts of renewable energy in advance of need and cost-effectiveness over the period 1999 to 2004. For the analysis, one 30-megawatt geothermal project was assumed to be developed. This level of project development is representative of a modest extension to the current renewables pilot and demonstration program.
- Development of 89 average megawatts of renewable energy in advance of need and cost-effectiveness over the period 1999 to 2004. For the analysis, two 30-megawatt geothermal projects and two 30-megawatt wind plants were assumed to be developed during the period. This level of project development is representative of an aggressive renewables pilot and demonstration program.
- Development of approximately 30 average megawatts of renewable energy per year in advance of need and cost-effectiveness between 1999 to 2004 for a total of 129 average megawatts. For purposes of the analysis, a mix of biomass, geothermal, solar and wind resources was assumed to be developed, including (relatively) low-cost projects that are added to sites already having pilot projects and pilot development at new areas. This rate of development would be representative of moderate-level sustained renewables development.
As in the previous analysis, an attempt was made to incorporate the societal benefits of renewables that may not be reflected in the resource decisions of a competitive wholesale electricity market. In addition to the energy contribution, much of the diversity value of renewables was included by considering hydropower, load growth and fossil-fuel price uncertainty. Fuel carbon tax cases of $0, $10, $25 and $40 per ton of carbon dioxide, levied as described above, help set a value for the carbon-free characteristics of renewables. Accelerated development was assumed to shorten lead times for subsequent development of additional projects at sites that have significant resource potential and to accelerate geothermal cost reductions. [Because of the site-specific characteristics of geothermal resources, advanced development at Northwest sites could accelerate cost reduction for subsequent geothermal development beyond the rates illustrated in Figure 5-8. The levels of accelerated development considered in this analysis would be unlikely to stimulate reductions in biomass, wind and solar photovoltaics beyond the rates shown in Figure 5-8.] Projects were assumed to accumulate credit for carbon offsets between 2000 and 2005.
The analysis does not reflect possible costs or benefits of non-carbon environmental effects, economic development issues, non-power direct benefits or contribution to a long-term sustainable energy supply. These effects appear to be generally offsetting (e.g., the local environmental effects of renewables development versus the residual air-quality impacts of fossil-fuel development); subject to non-energy policy (e.g., economic self-sufficiency); or do not appear to be compromised by any of the courses of action considered (e.g., long-term energy sustainability).
Figure 6-7. Net Present Value of Accelerated Renewables Development

As illustrated in Figure 6-7, the expected net present values of the three levels of accelerated renewable development are negative except for the cases of high carbon taxes. The moderate and aggressive pilot and demonstration programs result in positive net present value for carbon taxes between $30 and $40 per ton, or greater. The net present value of the five-year sustained development program is negative across the full range of carbon taxes examined.
The generally negative expected values of accelerated renewables development result from: 1) the development and operating costs of the renewables are high compared to other alternatives during the period of accelerated renewables development; 2) early development of prime resource areas precludes later development of these sites using improved and less-costly technology; 3) the value of pilot projects in reducing the lead time for subsequent step-out development has been reduced by the availability of surplus power on the wholesale market and by the assumption that the coming of a carbon tax will be known several years in advance. Advance notice of a forthcoming carbon tax would provide time for aggressive efforts to prepare promising large renewable resource areas for development.
Figure 6-8. Impact of Accelerated Renewables Development on Revenue Requirements

The effect of accelerated renewables development on annual regional electricity revenue requirements was also assessed. (See Figure 6-8.) The results are roughly indicative of the impact on rates, assuming that the net costs are evenly spread on the basis of energy consumption. Costs of the current renewables confirmation activities are excluded.
By the fourth year (2003), the net cost of the five-year sustained development program peaks at 0.78 percent of regional revenue requirements ($71 million). In following years, net costs decline because of the combined effects of load growth (which increases regional revenue requirements) and the increasing cost of wholesale power and combined-cycle resources (because of fossil fuel price escalation and the cost of complying with increasingly stringent California nitrogen oxide control requirements). Over the 10-year period 1996 through 2005, net costs of the 2000 to 2004 sustained-development program average about $31 million annually.
The other two development strategies are less costly. By the fourth year (2003), the net cost of the five-year aggressive pilot and demonstration program peaks at 0.39 percent of regional revenue requirements (about $36 million). The modest pilot and demonstration program peaks at 0.21 percent of regional revenue requirements (about $21 million) in its first year. Over the 10-year period 1996 through 2005, the annual net costs of aggressive and modest pilot and demonstration programs average about $18 and $9 million, respectively.
Because the resource costs used to model accelerated development were representative of adding new projects to existing sites and not pilot project development, actual costs would likely be somewhat higher than shown here.
Findings Regarding a Near-Term Strategy
The analyses described above lead to the following findings regarding a near-term renewable resource strategy:
First, the inventory of undeveloped Northwest renewable resources has little quantifiable potential economic value unless carbon dioxide controls are eventually required. However, the expected value of these resources increases from $86 million to $1 billion across a range of possible carbon taxes (see Figure 6-6).
Second, the development of renewable resources in advance of need and cost-effectiveness has little quantifiable economic benefit except in high carbon-tax cases. This results from the relatively high cost of most renewable resources and the following:
- The benefits of pilot projects in shortening the lead time for project development appear to be less valuable than in the past. The flexibility of the wholesale market, and the likelihood that greenhouse gas control measures, if adopted, would be phased in over a period of several years erode the benefits of shortened lead time.
- Near-term development of renewable resources foregoes the benefit of expected longer-term technology improvements for the resources developed. This effect is significant for renewables because of the limited supply of prime resources, the capital intensity of most renewables development and the expectation of relatively rapid technology improvements.
Third, the net cost of sustained development of renewables in advance of need would quickly approach 1 percent of regional electricity revenue requirements. The annual cost of a sustained development program would then decline if further acquisitions were terminated, and decline more rapidly if a carbon tax were adopted. The net cost of renewable development rates in excess of about 30 average megawatts per year or continuing for more than about five years would exceed 1 percent of revenue requirements. A modest five-year renewables research and development program consisting of, for example, a 30-megawatt demonstration project and slight expansion of resource assessment projects would require less than 0.25 percent of regional revenue. These figures exclude the net costs of the renewable confirmation activities that are under way.
Finally, continued technology development will improve the position of renewables. But, geothermal excepted, it seems unlikely that renewable development efforts by the Northwest could contribute significantly to the advancement of renewable resource technologies or the viability of renewable resource companies. A robust global market and public support for basic research and development are probably necessary to ensure that technology development continues and that equipment vendors and developers remain in business. In the case of geothermal, development efforts at Northwest sites might accelerate the optimization of technologies for these applications.
Conclusions: Justifiable Elements of a Renewable Resource Strategy
The findings described above suggest that the actions described below might be justifiable elements of a near-term (5 to 10 year) renewable resource strategy.
Ensure that the restructured electric power industry provides equitable opportunities for development of cost-effective renewable projects: Open access transmission at comparable rates, for example, will provide equitable opportunities for remotely situated renewable projects to access markets. Better understanding of the cost of transmission and distribution to specific loads will reveal the system benefits that might be provided by projects including remote solar photovoltaic applications.
Ensure that the renewable resource potential of the Northwest is adequately defined and that prime undeveloped renewable resources remain available for possible future development. This will require completion of key demonstration projects and additional resource assessment activities already under way: Continuation and completion of the resource assessment and demonstration activities of the renewable resource confirmation agenda of the 1991 Power Plan will provide much needed information. These activities, fully described in Appendix K, include completion, operation and monitoring of geothermal projects at Newberry Volcano, in Oregon, and Glass Mountain, in Northern California, and commercial-scale wind demonstration projects. Also included are long-term wind and solar resource monitoring, and further characterization of prime wind and solar resource areas. These projects are revealing the feasibility, cost and environmental implications of developing the geothermal, solar and wind resources of the Northwest, thereby providing guidance for management and future development of the best resource sites.
Support research and development efforts to improve renewable resource technology: While renewable resources my not be cost-competitive today, they are likely to be needed in the long-term, and further research and development will bring their costs down. Unfortunately, with a weak near-term market for renewables, research and development may be limited. Consequently, the region should make a special effort to support these activities. One approach might be to continue support for research and development at the national level, for example, through the activities of the Electric Power Research Institute. Research and development support should also extend to demonstration of new technology applications for renewable resources of regional importance, such as improved hydropower efficiencies and distributed solar applications.
Offer green power purchase opportunities: "Green power" [The term "green power" is commonly used to describe a wholesale or retail power product consisting of power from renewable sources.] purchase opportunities are of value to consumers who believe that the benefits of renewable resources are not fully reflected in market-driven resource development decisions. Green power sales will also foster markets for renewable technologies and maintain renewables development capability. Project development serving green power sales should focus on cost-effective renewables, to the extent that these are available, and additional projects at existing sites with the potential of synergistically improving the economics of both existing pilot projects and the added projects.
Monitor fuel prices, the global climate change issue and other factors that might influence the value of renewable resources: Initiate more aggressive preparation for the development of renewables if changes in these factors indicate that accelerated development of renewables is desirable.
6-C. Environmental Considerations
The Power Act gave the Council responsibility to take environmental effects of electricity generation and use into account in its planning. As further guidance to the Council in administering its environmental responsibility, the Act included priorities to be used in choosing among resources that are equally cost-effective. These priorities generally favor environmentally benign resources. [The priorities are: first, conservation; second, renewable energy; third, high-efficiency resources; and fourth, conventional fossil generation.] The Act also specifies a 10-percent advantage for conservation in comparing the cost-effectiveness of conservation with that of other resources.
In past plans, the Council has taken a number of actions based on its consideration of environmental effects of the power system:
- In 1988, the Council specified 44,000 miles of stream reaches as protected areas. These reaches were judged to be unsuitable for siting of hydroelectric generating plants, because of the unavoidable effects on fish and wildlife habitat and migration.
- In the 1991 Power Plan, the Council set the cost-effectiveness cutoff for conservation (the upper limit on the cost of conservation measures judged cost-effective) higher than the avoided direct cost of new fossil-fueled generating plants. The extra margin was included by the Council to reflect the environmental advantages of conservation as a resource, compared to fossil-fueled generation.
- In the 1991 Power Plan, the Council also recommended that the region plan to build gasified coal generating plants if coal generation was chosen. Gasification technology was thought to be marginally higher in direct costs, but the Council judged that its environmental advantages, in addition to its potential for staged development, made it preferable to conventional pulverized-coal generating plants.
Environmental Mitigation in Competitive Electricity Markets
In a world of regulated utility monopolies, the mitigation of environmental effects of electricity production can be addressed by the utility itself. Of course, there are difficulties in measuring environmental effects and reaching agreement between utilities and regulators as to how best to mitigate them. When agreement is reached, however, extra direct costs resulting from environmental mitigation can be spread among customers by the monopoly utility. Nonetheless, even monopoly utilities face some level of competition because some customers can choose other energy forms or alternative locations, so the ability of a utility to pass on environmental mitigation costs is limited.
In a world with increasingly competitive electricity markets, the ability to pass on costs will be limited. A utility undertaking environmental mitigation that is not required of its competitors will incur costs its competitors do not incur. Beyond some point, this utility risks losing customers if it must require higher power rates.
It is difficult to predict the net effect of a more competitive electricity market on environmental quality. It is plausible to imagine competition leading to the substitution of more efficient and more environmentally benign natural gas generation for older fossil-fuel fired generation. In such cases, more competitive markets could improve environmental quality. In the near term, competition and low gas prices may result in older, less efficient, less environmentally benign plants being run. The balance between the use of newer versus older plants depends on relative production costs. To the extent that environmental effects are externalities [Economists define externality as a byproduct of an economic activity that is not borne by the parties involved in that activity. Environmental externalities are the environmental effects that we impose on others, which are not included in the direct cost of our actions to us.] to producers and users in competitive markets, there will be continued reason for concern about the level of attention utilities will pay to these effects.
In a competitive world, the desirable level of environmental mitigation will need to be the responsibility of all competitors. This might be accomplished by regulation of technologies, emission trading, pollutant taxing or other means. Whatever means are used, they will need to be applied equitably across competing energy producers, across competing energy forms and across regulatory jurisdictions.
This will tend to move policy decisions regarding environmental mitigation from the level of individual utilities and state and local regulators to the national or international level. A regional organization such as the Council is likely to find itself increasingly responding to environmental policies determined at the national or international level, instead of making environmental policy decisions itself. This draft plan focuses most of its environmental analysis on an issue that fits this description: global climate change.
Global Climate Change
The possibility that global climate change is occurring, driven by emissions of "greenhouse" gases [Greenhouse gases include carbon dioxide (CO2 ), which is the most important,and methane (CH4 ), nitrous oxide (N2O), low-altitude ozone (O3 ) and chloroflourocarbons (CFCs).] and other human activity, has received increasing attention in recent years. The potential effects of such climate change include higher temperatures, changes in precipitation patterns, changes in ocean currents, inundation of coastal land as the mean sea level rises, and increased intensity and frequency of storms. The potential for damage from these effects has led to intense scientific research and international discussions to understand what sort of response might be appropriate.
Measures to mitigate damage from climate change could include reductions in greenhouse gas emissions by using different fuels for energy production, reducing transportation fuel use, increased efficiency of energy use, removal of greenhouse gases from the atmosphere and direct responses to damage, such as building higher seawalls.
While the Council focuses primarily on the issue of possible global climate change in this draft plan, this focus is not because other environmental effects are not significant. This focus was chosen because:
Control efforts of other emissions have already made a difference: Many effects, such as emissions of sulfur dioxides of nitrogen (NOx) and particulates, are already controlled to levels such that taking them into account does not change the preferred portfolio of new resources. In addition, market mechanisms, such as tradable emission rights or offset requirements, account for some of these effects (SO2 and in some areas NOx) as operating costs of existing resources. To the extent that resource operators are expected to cover the cost of their emissions with amounts that approximate the damage resulting from emissions, they will make operating decisions that take proper account of the environmental damage.
Many effects are project-specific: Many environmental effects are specific to unique qualities of resource design and location that can only be evaluated when specific projects are evaluated. The Council, in a long-term, regionwide plan, can generally describe these effects, but it cannot quantify impacts of actual projects. This evaluation is most appropriately done when specific projects are proposed. The Council recognized this in the 1991 Power Plan and committed to work with the state and local bodies responsible for establishing siting criteria that take into account localized environmental effects.
The Council's fish and wildlife program also addresses impacts of the power system: The hydroelectric system has had very significant impacts on fish and wildlife, particularly anadromous fish. The Council was given special direction to deal with these environmental effects through its Columbia River Basin Fish and Wildlife Program. The Council's power planning analysis takes into account the effects on the power system of fish and wildlife recovery efforts, but leaves the determination of what these recovery efforts should be to the fish and wildlife program process.
Global climate change could significantly change the power system: The steps that might be taken to mitigate climate change have the potential to change significantly the region's choice of energy resources. The potential damage from climate change ranges from disruption of agriculture, natural vegetation and wildlife from changed temperatures and rainfall patterns, to inundation of islands and coastlines because of higher sea level, to damage from more-intense storms. Estimates of possible damage costs from global climate change cover a wide range, but values at the upper end of the range would justify changing our generation and use of electricity, as well as other uses of energy (e.g., transportation).
Special Difficulties of the Climate Change Issue
The issue of global climate change has features that make it even more difficult to deal with than other environmental issues. First, while scientific consensus appears to be emerging that human activity is affecting the global climate, [See the "IPCC Second Assessment Synthese of Scientific-Technical Information Relevant to Interpreting Article 2 of the UN Framework Convention on Climate Change 1995." There is still great uncertainty regarding the degree of climate change we face, its costs and the effects of efforts to mitigate such change. Scientists disagree about the mechanisms at work and the damage that may result.
Second, the global nature of the problem means climate change is an "externality" to our region, as well as to the individuals in the region. Whatever damage is caused by our region's greenhouse gas emissions is distributed globally; that is, it is experienced by people and ecosystems throughout the world. Likewise, any damage that our region suffers from global climate change is determined by greenhouse gas emissions throughout the world. This means that even if scientific uncertainty were eliminated, the region could not secure a stable climate by its own decisions and efforts. As is typical in situations with externalities, there would be inadequate incentive for each individual and each region to take actions that were in the global interest.
Because global climate change is an externality to each individual country, a response to climate change (if scientific consensus develops to justify a response) would be most effective if it were a cooperative international effort, with mutual commitments from most of the world's nations. Preliminary diplomatic negotiations are under way to make such cooperation possible if it turns out to be necessary.
Managing Risk to the Power System
Given the uncertainties surrounding the climate change issue, the inability of the region to control its climate by its own action and the difficulties implied by the ongoing transition to competitive electricity markets, the Council has approached the issue as a problem in managing risk to the power system. The region faces the risk that greenhouse gas emissions will have to be controlled and/or offset in the future. Such control would likely require policies such as a carbon tax or emission caps with tradable allowances. The risk to the region, then, is that fossil fuel burning may become more costly in a discrete step sometime in the future.
The size of this risk is determined by the magnitude and timing of this increase in cost, the probability that it will occur, and the cost of adjusting to the increase should it occur. The region cannot reduce the probability that global climate change will require future actions to control it – scientists will eventually come to a consensus, one way or another. The region may, however, be able to reduce the cost and disruption of a carbon tax, if global climate change turns out to warrant one. [Though control policies could take several forms, we use a carbon tax as a representative example. Other policies, such as tradable emissions under a cap, will have roughly equivalent effects on utilities' incentives at the margin.]
Measures to accomplish this reduction fall into two categories. First are measures that affect the production and use of electricity in the region, such as investments in increased efficiency or changes in generating fuel. The Council has reasonably good information about the first category. The cost of increased efficiency and the relative costs of generation by fossil, renewable and nuclear fuels in our region have been the subjects of Council analysis for every power plan.
Second are measures to offset emissions in this region by actions elsewhere; for example, investment in efficiency or fuel switching in the power system of a developing country, or the absorption of carbon by forestry practices in the United States or overseas. Measures in this "offset" category show promise of being some of the cheapest ways to respond to a need to control greenhouse gas emissions. These measures, unfortunately, are not nearly so well-studied as those in the first category.
In preparation for this plan, the Council commissioned an analysis of measures to offset carbon dioxide emissions. [Trexler and Associates, Inc., "Considerations in the Construction of a CO2 Mitigation Cost Curve for the Next Northwest Power Plan," August 1995.] While the offset potential appears promising, the quality of the data does not allow the development of a "supply curve" of offsets with much confidence. For example, incentives to invest in offsets to emissions depend on legal and institutional steps, such as the definition of new kinds of property rights. Such rights might be obtained by party A for reforestation work and sold to party B to satisfy party B's carbon tax obligations. The definition of these new property rights will need to deal with conceptual problems, such as assurance that a reforestation project is truly an increase in sequestered carbon, not merely a relocation of timber-cutting activity. Many of the measures that offer promise of inexpensive control of climate change (e.g., carbon sequestration in forests) are not completely inventoried. The size and cost of this inventory will depend in part on the definition of offset rights.
Analytical Approach
In the past, the Council has been able to estimate the costs and benefits of reducing other kinds of risk using its computer model, ISAAC (Integrated System Analysis of Acquisitions). [See Appendix H for a further description of ISAAC.] ISAAC would be the preferred tool for analyzing strategies to deal with the risk of a carbon tax as well. Unfortunately, the quality of available data means that we could have little confidence in the results.
The fundamental information necessary for an analysis using ISAAC is some sort of probability distribution of the outcomes (e.g., the level and timing of a carbon tax) that present risk to the region, and estimates of costs of the measures being considered to respond to the risk. While our understanding of global climate is improving, it does not yet support the estimation of a credible distribution of global climate change outcomes. The estimation of the cost of strategies to control emissions of greenhouse gases also faces serious difficulties.
Because of these problems, this draft plan does not treat the risk of global climate change with the kind of quantitative analysis applied to other issues. Instead, it provides illustrations of how much potential impact a control policy for greenhouse gases might have on:
- The cost of the power system;
- The value of conservation that is cost-effective on the basis of energy savings alone, but at some risk of not being acquired; and
- The net cost of maintaining some acquisition of renewables.
For purposes of illustration, carbon tax levels of $10, $25 and $40 (in January 1995 dollars) per ton of carbon dioxide were used. These values are illustrative of the range of values commonly cited. [See Table 1 of "Accounting for Environmental Externalities in the Power Plan," Northwest Power Planning Council Issue Paper 94-50, October 1994.]
Power System Cost Analysis
To illustrate the potential impact of a carbon tax on the overall cost of the region's power system, the Council estimates that supplying the region's electricity in 1996 will result in the emission of 11.6 million tons of carbon dioxide. If a tax of $10-per ton of carbon dioxide were in force and no changes were made to the operation of the power system, the region's total carbon tax payment would be $116 million, a 1.7 percent increase in the total regional bill for electricity. Under the same assumptions, a $40-per ton tax would cost four times as much.
The region appears likely to rely increasingly on fossil-fueled generation in the future, making it potentially more vulnerable to a carbon tax. If current acquisition patterns hold, the Council's forecasts project an expected level of carbon dioxide emissions of 27.3 million tons in 2005. If a tax of $10 per ton of carbon dioxide were imposed in that year, in the absence of adjustments to the operation of the power system, the tax payment would be $273 million, or a 3.7 percent increase in the expected regional electricity bill. A tax of $40 per ton would impose a proportionately larger tax bill and a proportionately larger increase in the total electricity bill, $1.1 billion and 14.7 percent, respectively.
Of course, even in the short run, changes in the operation of the power system to reduce this impact are possible. Generating units that are heavily affected by a carbon tax (such as coal-fired or high heat-rate gas-fired units) would be used less, and other units that are less affected by the tax (such as nuclear, renewable and high-efficiency gas-fired units) would be used more. Purchases from outside the region, to the extent their prices were affected by a carbon tax, could also be adjusted. The Council estimates that such short-run changes in the operation of the power system existing in 2005 could reduce the net impact of a $10 per ton tax to $245 million, and the net impact of a $40 per ton tax to $849 million (in 1995 dollars). In the longer run, as new generating units are added to the system, there is more scope for adjustment to the tax.
Effect of a Carbon Tax on Resource Choice
The imposition of a carbon tax could affect new resource acquisition choices. Table 6-3 shows estimates of the impact of a tax on the cost of various generating alternatives. These generating alternative costs are estimated assuming acquisition in the year 2000, and assuming medium forecast prices for natural gas. The generation making up our region's purchases from the West Coast market is represented by "SW Market - Gas Boilers" and "SW Market - Coal" and assumes purchases based on winter prices for these resources. A comparison of these impacts shows that coal plants are affected most heavily by a carbon tax, gas plants are less affected, and conservation and generation fueled by renewable or nuclear fuels are not affected at all. For example, a $10-per ton tax increases the cost of power from coal-fired plants in the Southwest ("SW Market - Coal") by 1.0 cent per kilowatt-hour, from 2.5 cents to 3.5 cents. The same tax increases the cost of power from a new gas-fired combined-cycle combustion turbine in the Northwest ("New PNW Natural Gas CC") by only 0.5 cents per kilowatt-hour, from 3.1 to 3.6 cents.
Table 6-3. Comparative Impact of Carbon Tax on Power Costs
| Resource | Fuel Carbon & CO2 Releases | Cost of Power (cents/kWh) | ||||||
| Taxable Fuel Carbon (lb/MMBtu) | Heat Rate (Btu/kWh) | Power Plant CO2 Releases (lbCO2/kWh) | Base | $10/ton CO2 Tax | $20/ton CO2 Tax | $30/ton CO2 Tax | $40/ton CO2 Tax | |
| Conservation (average) | 0.0 | 0 | 0.00 | 1.7 | 1.7 | 1.7 | 1.7 | 1.7 |
| SW Market - Gas Boilers | 31.4 | 9,260 | 1.07 | 2.5 | 3.0 | 3.6 | 4.1 | 4.6 |
| SW Market - Coal | 55.1 | 9,560 | 1.93 | 2.5 | 3.5 | 4.4 | 5.4 | 6.4 |
| Pulp Liquor Cogeneration | 0.0 | 16,500 | 0.00 | 2.3 | 2.3 | 2.3 | 2.3 | 2.3 |
| Landfill Gas Recovery | 0.0 | 11,000 | 0.00 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 |
| Clean MSW Combustibles | 0.0 | 14,400 | 0.00 | 4.2 | 4.2 | 4.2 | 4.2 | 4.2 |
| Forest Thinning Bioenergy | 0.0 | 14,400 | 0.00 | 7.3 | 7.3 | 7.3 | 7.3 | 7.3 |
| New PNW Natural Gas CC | 31.4 | 7,215 | 0.83 | 3.1 | 3.6 | 4.0 | 4.4 | 4.8 |
| Wind (First block) | 0.0 | 0 | 0.00 | 4.1 | 4.1 | 4.1 | 4.1 | 4.1 |
| New PNW Coal (PRB) | 55.1 | 8,970 | 1.81 | 4.0 | 4.9 | 5.8 | 6.7 | 7.7 |
| New Hydropower (Average) | 0.0 | 0 | 0.00 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 |
| New LWR | 0.0 | 0 | 0.00 | 4.9 | 4.9 | 4.9 | 4.9 | 4.9 |
| Ind. Gas Cogen (LM-5000) | 31.4 | 8,000 | 0.92 | 3.7 | 4.1 | 4.6 | 5.1 | 5.5 |
| Geothermal (First block) | 0.0 | 0 | 0.00 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 |
| Total Solar Thermal | 0.0 | 0 | 0.00 | 12.0 | 12.0 | 12.0 | 12.0 | 12.0 |
| Solar Photovoltaics | 0.0 | 0 | 0.00 | 17.8 | 17.8 | 17.8 | 17.8 | 17.8 |
Table 6-3 shows that the conservation resource and pulp liquor cogeneration are the least expensive resources even without a carbon tax. These resources become more attractive if a carbon tax is imposed, becoming more attractive yet as the tax level increases. The size of the conservation resource would increase with higher tax levels; marginal measures become cost-effective as the avoided cost of power generation increases.
Currently, two of the most common resource choices by the region's utilities are purchases from existing resources from outside the region and new gas-fired combined-cycle turbines. it's useful to examine the impacts of a carbon tax on the attractiveness of each of these alternatives in turn.
Table 6-3 shows that a tax of $10 per ton of carbon dioxide makes building new gas-fired combined-cycle turbines (at 3.6 cents per kilowatt-hour) competitive with the cost of power purchases (at 3.5 cents per kilowatt-hour based on operating costs only) from coal-fired plants in the Southwest. With higher taxes, coal-fired plants are more heavily penalized, and they become less competitive. The cost of power from conservation and renewable resources is not affected by a carbon tax, so these resources become more attractive relative to fossil-fueled plants at higher levels of carbon tax. As the carbon tax increases, landfill gas recovery, municipal solid waste combustibles, wind and hydropower all become competitive with purchased power from coal and natural gas generation in the Southwest.
Some renewables also become competitive with new gas-fired combined-cycle combustion turbines at higher levels of carbon tax. The high efficiency of the new turbines means higher taxes are necessary before the renewables are the cheaper resources. Landfill gas and new hydropower plants are competitive with new combined-cycle gas turbines at tax levels of $10 per ton or less, while municipal solid waste and wind require taxes above $20 per ton to be competitive.
These results suggest that carbon taxes could lead to adjustments in the resource mix across the range of taxes considered here. At low levels of tax, we might see substitution of a lower-carbon fossil fuel, natural gas for coal for example, while at higher tax levels renewable generation could be substituted for fossil fuel-fired generation.
Value of Conservation
The value of conservation was estimated by assuming the imposition of a $10-per ton tax in 2005 and simulating the development of the power system with and without the conservation resource identified earlier in this chapter. The value of this conservation is the difference between the two cases in the expected present value of the cost of providing electricity to the region. Without the carbon tax, the estimated value of the conservation is $2.3 billion. With the assumed carbon tax, the value of conservation increases to $3.2 billion, $4.6 billion and $6.1 billion for the three levels of tax, respectively. This increased value includes the value of extra conservation measures that become cost-effective as the tax raises the avoided cost of power.
Non-Power System Responses
Changing generating resources and acquiring conservation are responses to a carbon tax that we might expect, and that we understand reasonably well – measures affecting the production and use of electricity in our region. It is very likely that a number of other measures would be part of any sensible policy for controlling greenhouse gas emissions. These other measures would include reduction of emissions in other sectors of our economy (for example, transportation) or in other economies (for example, in developing countries), and they would include absorption of greenhouse gases (for example, in reforestation). It is very likely that some of the measures not analyzed here would turn out to be some of the most cost-effective in controlling global climate change.
Regional Actions While Climate Change is Uncertain
The foregoing discussion has described some of the responses we could expect from the imposition of a carbon tax if it occurs, but offers no strategy to pursue while the imposition of a tax is uncertain. As explained earlier in this chapter, the information is not available to evaluate such strategies quantitatively, using the tools the Council has used in similar situations in the past. We can, however, make some qualitative recommendations:
Avoid investments in vulnerable resources: Investments in resources that emit greenhouse gases are at risk of becoming stranded investments if a carbon tax is imposed. In the evaluation of alternatives that are "close calls" based on costs and other resource characteristics, taking account of the risk of a carbon tax tips the balance toward low-fixed-cost, short-term commitment alternatives, such as operating existing resources or purchasing from spot or short-term markets.
In most cases, operating existing resources does not increase a utility's exposure to the risk of a carbon tax. Most operating decisions commit the utility for a short time only (a year or less). The utility faces little risk that something as significant as a carbon tax will be imposed before the utility can reconsider its operating decision. The risk-avoiding advantages of existing resources hold whether the existing resource is owned and operated in the region, or the output of an existing out-of-region resource is being purchased.
When investment is unavoidable, recognize risk: Exposure to the risk of a carbon tax should be recognized when new investments are considered. New investments include the acquisition of new resources, of course, but they also include investments in existing resources. Examples of the latter are the replacement of the steam generator at a nuclear plant, installation of emission-control equipment at a coal-fired generating plant, or life-extension of a high heat-rate gas-fired plant. If investments are made in new or existing plants that are vulnerable to a carbon tax, and if a carbon tax were imposed before the investments are recovered, they could become "stranded." Many factors influence such investment decisions, and other factors might outweigh the risk of a carbon tax in the final decision, but the risk should be recognized, and taken into account.
In contrast, with decisions that commit utilities to the continued operation of a resource that is not vulnerable to a carbon tax, such as WNP-2 or a renewable energy resource, recognition of the risk of carbon tax would weigh in favor of continued operation. In these cases, too, other factors will be weighed and may outweigh carbon tax risk in the final decision, but carbon tax risk should be recognized.
Secure cost-effective conservation: Cost-effective conservation measures reduce the region's exposure to the risk of a carbon tax with "no regrets." That is, these measures are worth taking based on the direct costs alone, their risk-reducing benefits come without imposing any extra cost. Some conservation resources may be at risk because of market imperfections or gaps in the new utility industry structure. The risk of a carbon tax only increases the incentive to make sure the region takes advantage of all its opportunities for cost-effective conservation.
Gain experience in offsets: While the uncertainty about global climate change's impact on power system economics persists, utilities, regulators and others can monitor scientific developments, both in the area of extent and damage of warming and in the area of the economics and law of mitigation activities.
Utilities can also carry out pilot-scale efforts to get experience in the practical problems of acquiring offsets. Utilities in our region, most notably PacifiCorp, are pursuing this strategy with a variety of projects ranging from reforestation on private land in our region, to preservation of forests in Central America. The Oregon Energy Facility Siting Council is encouraging independent power producers to gain the same sort of experience as part of their license agreements. Such projects prepare the region to move quickly to larger-scale offset acquisitions if needed. The projects can be entered in a registry created by the Energy Policy Act of 1992 (see Box above) and may qualify for credits against a carbon tax or equivalent policy if one is adopted.
Some offset projects, for example, reforestation, result in a combination of carbon sequestration and production of other products that have value, for example, lumber. The net cost of the offset is the total cost of the project less the value of the non-offset products. The value of the offsets themselves, however, is speculative while national and international policy on climate change is uncertain. Because it is not certain the offsets are worth anything, however, they may be available at low cost. If a carbon tax (or equivalent policy) is imposed, the value of acquired offsets would equal the tax avoided due to the offsets. If a tax is not imposed, the offsets would have no value.
Acquiring offsets after a tax is imposed would be less risky, but more expensive. The owners of potential offsets will attempt to extract as much value as possible. Unless there are enough offsets to avoid any tax payments at all, the net cost of offsets should rise to approach the level of the tax.
Fourth Power Plan
posted Apr 16, 2013
- 5-A. Growing Demand for Electricity
- 5-B. Natural Gas Price Forecasts
- 5-C. The Western Power Market
- The Western Generation and Transmission System
- West Coast Resource Availability and Price
- Estimated Level of Reliance on the West Coast Market
- 5-D. New Generating Resource Potential
- 5-E. Hydropower System Uncertainties
This chapter describes the Council's forecasted range of electricity growth and its forecast of natural gas prices. These forecasts help indicate the potential level of increases in electricity use the region might experience. This lays the foundation for looking at what potential resource options are available to fill those growing needs.
This chapter also describes the outlook for the West Coast power market and assesses the amount and cost of electricity available from this market over the long run. As the current surplus in this market is depleted, construction of new generating capacity may resume. Brief descriptions of the estimated cost and quantity of generating resource alternatives that are available for development in the Northwest if new capacity is needed are also included in this chapter. This chapter ends with a description of the uncertainties and future capability of the hydroelectric system and their implications.
5-A. Growing Demand for Electricity
In the midst of all of the changes in the electric power industry, the region's economy continues to grow, and businesses and consumers continue to rely on electricity and other forms of energy as an important component of their activities. It is this growth in economic activity and its changing composition that is the primary determinant of the region's increasing demand for electricity, although that increasing demand is also affected by changing prices for electricity and other fuels.
Economic Patterns
The economic outlook for the Pacific Northwest continues to be strong, although there is always significant uncertainty about the amount of economic growth the region will experience. Recent economic growth in the region has continued to outstrip the nation as it has on average for the last 30 years or more.
Two major categories of business activity are typically distinguished in analyzing regional economic growth. Manufacturing industries are engaged in the transformation of substances or materials into new products. Electricity consumed in these activities is assigned to the industrial electricity demand sector. The second major category of business economic activity, non-manufacturing, includes activities such as services, construction, wholesale and retail trade, mining, agriculture and government. Electricity consumed in these activities is assigned to the commercial demand sector. The electricity used by individual consumers makes up the residential demand sector.
In the past, the region's manufacturing sector has been dominated by natural resource-dependent activities. Lumber, paper and food products accounted for half of the region's manufacturing employment in 1970. Although these industries are still significant, their relative importance is declining. Currently, the largest manufacturing industry in the Northwest is electronics, which is composed of machinery, electrical equipment and professional instruments. The second largest manufacturing industry is transportation equipment, primarily The Boeing Company in Washington. Transportation surpassed lumber and wood products as the largest manufacturing sector in 1989. The historically dominant lumber and wood products industry now makes up the third largest manufacturing industry.
Although receiving far less media attention, the non-manufacturing sector dominates regional employment. These activities account for 85 percent of regional jobs, having grown from an 80-percent share 25 years ago. The largest non-manufacturing sectors are services, retail trade and government. Recent growth has been fastest in business services, health services, engineering services, legal services and restaurants.
The most likely range of economic forecasts shows that the region could add between 1.2 and 2.5 million employees by the year 2015, with 1.7 million added in the medium case. Nearly all of this additional employment occurs in non-manufacturing industries. By 2015, the non-manufacturing share of total regional employment could grow to nearly 89 percent.
Electricity Demand Forecast
The composition of economic growth is an important determinant of the growth in electricity demand because different sectors have significantly different energy requirements. On average, the region's businesses required about 22 megawatt-hours of electricity per employee in 1994. However, the manufacturing sector requires about nine times as much electricity per employee as the commercial, or non-manufacturing, sector. Therefore, the more rapid growth of the non-manufacturing sector tends to gradually reduce the electricity intensity of the region's economy.
Even within the manufacturing sector, there are dramatic differences in the electricity intensities of various subsectors. Four of the 20 subsectors in manufacturing account for about 80 percent of the electricity use. These four are metals, paper, lumber and chemicals. The same four industries, however, account for only 27 percent of the manufacturing sector employment. These large electricity users are generally among the slowest growing industries in the economic forecast, and this tends to further reduce the electricity intensity of the regional economy.
However, there is a new electricity-intensive sector projected to show very rapid growth over the next several years. This is a portion of the electronics industry engaged in the manufacture of silicon wafers, computer chips and microprocessors. The large number of these plants that are expected to come on line over the next several years has the potential of adding about 250 average megawatts of industrial electricity demand.
Personal consumption of electricity occurs in the residential sector. The amount of electricity used per household in the Northwest has been gradually trending downward since 1980 in response to several factors. These include a large electricity price increase around 1980, regional conservation programs and declining natural gas and oil prices starting in the mid-1980s. The medium forecast shows a continued downward trend in residential electricity intensity.
The medium forecast of electricity demand shows that the region could add about 5,920 average megawatts of firm demand between 1994 and 2015. This amounts to an additional 282 average megawatts per year and an average annual growth rate of 1.3 percent.
The demand for electricity is, however, inherently uncertain. For this reason, the Council produces a range of demand forecasts. With resources that are less capital intensive and have shorter lead times, and the emergence of a West Coast surplus power market, the risks associated with demand uncertainty are less than in the past. Nonetheless, it is still worthwhile to consider the implications of demand uncertainty.
The current electricity demand forecast projects growth rates to be between 0.7 percent and 1.9 percent per year, with equal and relatively high probability. This amounts to a difference of approximately 7,000 average megawatts over the 20-year planning horizon. It is possible, although much less likely, for growth, in the low and high cases, to be as little as negative 0.2 percent or as much as 2.7 percent per year, respectively. This is a difference of more than 14,000 average megawatts over the 20-year planning horizon. Figure 5-1 illustrates the forecast range in a long-term historical context.
Figure 5-1. Demand Forecast Range in a Long-Term Historical Context

The composition of the forecasted use of electricity changes very little between 1994 and 2015. Residential and irrigation shares decrease by 1 percent each with the industrial sector gaining the 2 percentage points. Within the industrial sector, there is a shift away from Bonneville's direct service industries and toward other industrial customers.
The demand forecasts reflect an expectation that the region will experience generally stable electricity prices that will probably decline slightly in real terms in the medium and lower demand forecasts. This is illustrated for the residential sector in Figure 5-2. These are average rates per kilowatt-hour, including all fixed and variable costs.
Figure 5-2. Forecast of Average Residential Rates

Electricity prices are forecast simultaneously with electricity demand. In past forecasts, electricity price growth was very sensitive to the rate of growth in electricity demand. This is no longer the case for two reasons. First, the cost of new electricity generating capacity is no longer substantially greater than the cost of the existing regional power resources. This is primarily due to the lower forecasts of natural gas prices and the technological advancement in combined-cycle combustion turbines. Second, there is substantial opportunity to improve the use of electricity generating capacity throughout the West Coast power system. The opening up of the wholesale power market will facilitate that improvement. As a result, fewer new resources will be required, and those that are required will be less costly than in the past. The average regional electricity price forecasts are shown in Table 5-1.
Table 5-1. Average Regional Real Retail Electricity Price Forecasts
(1995 Cents Per Kilowatt-hour)
| Forecast Case | 1994 | 2005 | 2015 | Growth Rate
1994-2015 |
| Low | 4.2 | 3.92 | 3.76 | -0.5 % |
| Medium Low | 4.2 | 3.87 | 3.80 | -0.5 % |
| Medium | 4.2 | 3.89 | 3.91 | -0.3 % |
| Medium High | 4.2 | 4.05 | 4.19 | 0.0 % |
| High | 4.2 | 4.30 | 4.65 | 0.5 % |
5-B. Natural Gas Price Forecasts
Natural gas prices have two significant impacts on electricity consumption. First, natural gas prices relative to electricity prices help determine which fuel consumers will select for key pieces of energy consuming equipment, such as space and water heaters. Second, the price of natural gas significantly determines the cost of gas-fired combustion turbines, which in turn is a key resource for new electricity generation. As a result, natural gas prices influence both the amount of electricity consumed and the cost of supplying new resources.
As described later in this chapter, the restructuring of the natural gas industry has resulted in a vibrant market, producing dramatic decreases in natural gas prices and a growing estimate of natural gas supply. Ranges of natural gas and other fossil fuel price assumptions have been declining and becoming narrower since the Council developed its 1991 Power Plan.
Based on several national gas price forecasts and advice from the Natural Gas Advisory Committee, the medium-case forecast assumes that average real U.S. gas prices will grow at about 1.0 percent annually, increasing from the 1994 level of $1.84 to $2.25 by 2015. The lower cases recognize that real prices may remain flat or even decline slowly over time, and the higher cases explore the possibility that we have become too optimistic about the natural gas future as a result of recent patterns. However, even in the high forecast, gas prices reach only $3.37 compared to a high case of $6.00 contained in the Council's forecast of natural gas prices in October 1992. Figure 5-3 illustrates the historical average U.S. wellhead price and the Council's forecast.
Figure 5-3. Average U.S. Wellhead Natural Gas Prices: Historic and Forecast Range

While national trends in natural gas prices are usually indicative of regional trends, they are not a good indication of actual gas prices in this region. The Pacific Northwest gets most of its gas supplies from Canada and the U.S. Rocky Mountains. These are the two lowest-cost natural gas producing regions in North America. As a result, prices of natural gas delivered into the pipelines serving the Pacific Northwest are substantially lower than prices in most of the country. For example, on October 2, 1995, gas delivered into the U.S. Pacific Northwest from Canada was about $.90 per million Btu, and gas delivered into the pipeline serving the Pacific Northwest from the U.S. Rocky Mountains was $1.04 per million Btu. At the same time, at the Henry Hub in Louisiana, the pricing point for NYMEX gas futures contracts, gas was $1.65 per million Btu. The Northwest's pricing advantage fluctuates with market conditions, but a $.50 advantage is fairly typical.
The low price for Canadian natural gas, which is primarily produced in Alberta and British Columbia, results from the large relatively less-developed gas resources, limited pipeline capacity to move gas out of Canada, and long distances to major gas markets outside the Northwest. These conditions are expected to continue to benefit the Pacific Northwest with relatively low gas prices for the forecast period, although the advantage relative to national prices is expected to decline to some degree in most forecast cases.
The prices of natural gas to final users depends on the cost of transporting and distributing the gas to the point of use. For smaller customers, these costs are a larger share of the delivered cost of natural gas. Because pipeline and distribution costs are not expected to escalate rapidly in real terms, the growth rates of prices to residential and commercial customers are moderated. The medium forecast used for this draft plan is summarized in Table 5-2. The complete range of forecasts may be found in Appendix C.
Table 5-2. Medium Case Forecast of Natural Gas Prices Delivered to End Users
(January 1995 Dollars per Million Btu)
| Case and Sector | 1994 | 2005 | 2010 | Growth Rate
1994-2015 |
| Residential | 5.21 | 5.28 | 5.62 | 0.4 % |
| Commercial | 4.43 | 4.49 | 4.83 | 0.4 % |
| Industrial | 2.30 | 2.57 | 2.88 | 1.1 % |
| Electric Generation | 1.82 (est.) | 2.14 | 2.52 | 1.6 % |
The electricity forecasts indicate that loads could grow by about 5,920 average megawatts by the year 2015, if medium economic growth occurs. There are a number of resources that could be used to meet this load growth, including the West Coast power market, which currently has an abundance of low-cost resources.
The Northwest has traditionally thought of itself as an island of cheap electricity with links to the rest of the West. These Western connections can be used to increase reliability; to dispose of surplus nonfirm hydropower (which was the primary purpose for constructing the Intertie lines between the Northwest and Southwest); and to make exchanges that do not involve net sales of firm energy (e.g., transactions where the Northwest supplies peak capacity and the buyer returns the energy in its off-peak hours or season). Such exchanges were exempted from restrictions under the Northwest Preference Act, which was passed with the initial construction of the Intertie, because they were consistent with the concept of an island of cheap electricity. The closest these ideas came to being challenged were calls for increased reliance on gas-fired combustion turbines or purchases from California gas generation, which could be extensively displaced by nonfirm energy to meet firm Northwest loads. Until very recently, these notions were basically intact.
Several things have dramatically changed this perspective in the last few years. The first is the general assumption that the fall in gas prices in the mid-1980s, described earlier in this chapter, was not an anomaly. The second is the still-unfolding consequence of the Energy Policy Act of 1992 (EPAct), which allowed theFederal Energy Regulatory Commission (FERC) to require open access to the nation's transmission systems and legitimized major non-utility power suppliers, marketers and brokers as players in the nation's power markets. These factors are driving the industry toward a wide-open wholesale power market.
The Western Generation and Transmission System
To estimate how much electricity could be brought into the Northwest from Southern and Southwest markets, the Council analyzed how much transmission was available. To exclude indigenous Northwest resources, the analysis left out the Northwest Power Pool Area of the Western Systems Coordinating Council (WSCC), leaving in only California, the Inland Southwest and the southern Rocky Mountain area. (See map.) This area's generating resources, as of January 1995, are shown in Figure 5-4. Figure 5-5 shows the forecast load and resource balances for the next nine years. Data for both figures are from the WSCC's 1995 planning documents.
Figure 5-4. 1995 WSCC Winter Generating Capability
(Excluding Northwest Power Pool Area)

Figure 5-5. WSCC Surplus Above Required Reserves
(Excluding Northwest Power Pool Area)

There are three major points to be drawn from these figures. The first is that there is a substantial amount of gas-fired steam generation in this area, when gas prices are low. The second is that there is a surplus during the summer, which is the WSCC's peak period, that extends past the year 2000, although there are important qualifications about the plants that make up the surplus and their marketability. Third, and most importantly, the surplus during the winter, which is the Northwest's peak period, is larger and is likely to extend indefinitely until it is either contracted away to the Northwest or is limited by, for example, air quality concerns at the generation sites.
Transmission Constraints
The Northwest is currently connected to California and the Inland Southwest by two major interties, the AC Intertie to Northern, and to a lesser extent, Southern California, and the DC Intertie directly to Southern California. Southern California is in turn connected to the Inland Southwest, the site of large portions of its own generation, by major 500-kilovolt lines. The ability to import from the Southwest and Southern California to Northern California on the AC Intertie can be limited to as little as 1,300 megawatts under some load and generation patterns. The AC Intertie capability from Northern California into the Northwest is capable of delivering approximately 3,700 megawatts. However there is typically far less electricity available in Northern California, except during good runoff conditions in the spring. At that time, the California hydropower competes with Northwest hydropower on the market.
The DC Intertie can generally be loaded to its full rating, approximately 2,900 megawatts south-to-north, without impinging on reliability criteria based on the stability of the transmission system. However, heavy and long-term reliance on imports on the DC Intertie, which is a single line in a single right of way, to meet loads could incur the risk of not having an alternative contractual pathway in the event of an outage on the line. In recent years, prolonged outages have occurred because of a fire and an earthquake in Southern California.
An additional high voltage line, the Southwest Intertie Project, connecting the Southwest with the Northwest, is in the advanced subscription stage. This line would likely mitigate some of these concerns. Nonetheless even with the completion of a project like the Southwest Intertie, transmission capacity, not prices or generating availability, will be the major constraint on the ability of the Northwest to meet its load growth through purchases from the West Coast market.
West Coast Resource Availability and Price
After accounting for general reliability needs and potential transmission constraints, it would be reasonable for the Northwest to rely on imports of up to 3,500 to 4,500 megawatts in most months, depending on the desired reliability of delivery. This is consistent with the Northwest Power Pool's analysis of the Northwest's reliability for winter 1995/1996, which concluded that up to 4,500 megawatts of imported power on the AC and DC Interties could be safely relied on in the event of extreme winter weather. This is higher than the 3,500 megawatts used in the analysis for winter 1994/1995 because hydropower conditions improved in 1995/1996 in Northern California. For the long-term analysis conducted in this plan, it was assumed that imports would be constrained to 5,000 megawatts in any given month.
The Council's analysis further indicates that prices that might be offered for Northwest imports will be heavily dependent on natural gas prices, which are expected to remain at low levels. Based on the Council's medium natural gas price forecast, electricity delivered to the Northwest borders should generally remain in the low 20-mill range, with increases for on-peak prices likely in the early 2000s. On-peak refers to the daily, and particularly, the seasonal peak periods.
Summer peak-daytime prices could become quite high as Western generating surpluses are worked off and added air-quality constraints are imposed in Southern California air basins, thus reducing the output of gas-fired generating units in the air basin. High prices in summer on-peak periods would provide a market for Northwest nonfirm energy and that would bring in additional capital investment to meet peak loads. However, off-peak prices, particularly in off-peak months, when the Northwest would be most interested in purchasing power, are likely to remain moderate (in the low 20-mill range in 1995 dollars) well into the next decade, given gas prices that track the medium forecast. The analysis, including significant uncertainties and limitations, is described in more detail in Appendix E.
Figure 5-6. Change in System Costs of Power is Purchased from West Coast Market
(Negative values are savings to the system.)

Estimated Level of Reliance on the West Coast Market
If the California and Inland Southwest wholesale power market can be used to maintain reliability and deliver electricity to the Northwest at a price lower than that of new generation, it is likely that the Northwest will develop some level of reliance on wholesale power purchases from the Western power market. [Reliance on the spot market for significant amounts of energy will represent a move away from the traditional critical water planning criterion historically used in the Pacific Northwest power system. Critical water planning is a system planning criterion that sets targets for construction of new generation resources such that demand could be met under the worst historical drought conditions.] This is particularly likely given the estimated price and depth of the out-of-region bulk power market and the strong Northwest interconnections to this market. As a result, these markets significantly affect future resource avoided costs and the value associated with continued implementation of conservation and renewable resources.
Before assessing the cost-effectiveness of developing additional conservation and renewable resources, the Council needed to account for the large amount of inexpensive electricity that could be purchased from the West Coast market. To this end, the Council compared meeting load growth with the construction of new gas-fired combined-cycle power plants in the region to meeting load growth with increasing levels of out-of-region purchases on the market. The results of these studies are summarized in Figure 5-6.
This chart shows the change in future power system costs (expressed as present value dollars) as a function of the level of reliance on out-of-region markets. The market level of zero means that all new resources are in-region combined-cycle gas plants.
The present value of future power system costs for this approach is about $30 billion. As market reliance increases, combined-cycle plant development is displaced by an equivalent amount of purchases. In this study, the expected present-value cost to the region is minimized if the region uses the West Coast market to meet about 3,000 average megawatts of demand growth. The expected cost reduction to the region is about $3.2 billion compared to constructing combined-cycle gas power plants. The mean annual cost savings approach $250 million per year.
The 3,000-average megawatt reliance does not imply a flat 3,000-megawatt purchase year round. In any given month, purchases could be as high as 5,000 megawatts, depending on the long-term transmission capacity constraints described above. Yearly purchase levels will be strongly influenced by demand patterns, available hydropower generation and natural gas prices.
Purchases will generally be greater in the fall and winter and will fall off sharply in the spring and summer, as reservoir storage is used to meet salmon flow targets, and more hydropower is available to meet in-region loads. One of the largest benefits of the spot purchase strategy comes from its ability to adapt to changing hydropower generation patterns. Spot purchases can be used heavily when there are constraints on hydropower generation, but they can be backed off in good hydropower conditions, without incurring the fixed costs of new construction. Thus, spot purchases become another form of the hydropower-firming strategy recommended by the Council in the 1991 Power Plan.
The expected values on the curve in Figure 5-6 represent mean values over 100 future scenarios for the power system. There is significant uncertainty around these points because the future is unknown. The 100 scenarios include a range of low to high load growth, low to high natural gas prices, and uncertainty in the amount of Northwest hydropower generation.
At the 3,000-average megawatt purchase level, the average savings relative to building power plants in the Northwest amount to $3.2 billion. However, in a case with low demand growth, where there is not much need for new construction, the relative savings would be much less. Continually poor hydropower conditions would also produce lower benefits, because it would allow less displacement of purchases and realize less of the flexibility benefit described above. Conversely, higher levels of demand growth, or continually favorable hydropower conditions would produce larger benefits.
Given the uncertainties incorporated in this analysis, the distribution of potential benefits at the 3,000-average megawatt reliance level ranges from $250 million to more than $5 billion. This is illustrated in Figure 5-7. More than 70 percent of the observations fall within the range from $2.4 billion to $3.6 billion. While the range is very large, at this level of market reliance there are no cases where the market purchase strategy doesn't produce some economic benefit relative to the full combined-cycle power plant strategy. Even over a wide range of potential futures, relying on purchases from the West Coast market produces savings.
The results of this analysis should not be construed as a recommendation by the Council that the region immediately abandon its historic critical water planning criteria and move to complete reliance on out-of-region markets to meet demand growth for the next several years. The Council will have little influence over this process. Decisions to meet load growth through short-term transactions will be made incrementally by individual utilities, based on the economics and reliability of proposed transactions. However, the potential economic benefits to the Northwest appear to be large, and it is the Council's judgment that reliance on the market needs to be incorporated into the analysis of the cost-effectiveness of conservation and renewable resources. To that end, a long-term market reliance level of 3,000 megawatts was incorporated into the analysis of the cost-effectiveness of conservation and renewable resources. For conservation or renewable resources to be found cost-effective, their costs to the region had to be lower than reliance on purchases from the market.
Figure 5-7. Distribution of Benefits from Reliance on the West Coast Market
(3,000-Megawatt Level)

5-D. New Generating Resource Potential
A supply curve showing the estimated cost and quantity of new resource alternatives available for development in the Northwest is illustrated in Figure 5-8. Table 5-3 contains the corresponding data. Capsule descriptions of the generation supply alternatives follow. Further information regarding conservation potential is provided in Chapter 6 and in Appendix G. Additional information regarding generating resource potential is provided in Appendix F.
Coal: A practically unlimited supply of low-cost, low-sulfur coal is available to the Northwest. Gasification and other advanced technologies have improved the efficiency and reduced the environmental impacts of coal-fired generation. Additional coal-fired generation could supply 5,000 average megawatts, or more, of energy at costs of 3.7 to 4.2 cents per kilowatt-hour. These costs are expected to remain relatively stable, but they would be sensitive to carbon dioxide control measures. Constraints to the development of additional coal-fired power plants include public resistance to transmission line construction, cooling water supplies at arid sites, local air-quality impacts, environmental impacts of mining and transporting coal, and the risk that carbon dioxide emissions will be taxed.
Forest thinning residue: Some proposals for restoring degraded east-side forests involve selective removal of trees. These thinnings would be marketed as saw logs or pulping chips where possible. Unmerchantable materials could be chipped and distributed on-site or, alternatively, used as a power plant fuel. About 300 to 1,000 average megawatts could be generated using forest thinnings, at costs ranging from 5.1 to 6.2 cents per kilowatt-hour. These megawatt estimates are fairly uncertain. The cost estimates allocate the full cost of the forest thinning process to power production (i.e., including no subsidy from forest restoration programs). Costs are expected to decline slowly as biogasification technology is introduced. Development of this resource would require resolution of the controversy regarding the appropriate approach to east-side forest restoration.
Figure 5-8. New Resource Costs and Availability

Table 5-3. Conservation and Generating Resource Supply Summary
| Resource Name [The mill ranges appearing in the resource names (e.g. "0-10 m/kWh") designate resource blocks and may only approximate the actual cost of resources in the block. The actual average cost of the resource block is shown in the Levelized Cost column.] | Levelized Cost (Real, 1995 mills/kWh) [These levelized costs assume investor-owned utility financing, 15-year amortization of capital costs for generating resources. Levelized costs for conservation resources are based on the average of investor-owned and public utility financing, with the amortization life being 15 years or the life of the conservation measure, whichever is shorter. ] | Average Megawatts |
| New Commercial 0-10 m/kWh | 4.2 | 123 |
| Commercial Remodel & Retrofit 0-10 m/kWh | 4.9 | 39 |
| Existing Residential Space Heat 0-10 m/kWh | 5.0 | 9 |
| New Residential Space Heat 0-10 m/kWh | 5.0 | 1 |
| Existing Commercial 0-10 m/kWh | 5.1 | 46 |
| New Industrial 0-10 m/kWh | 7.3 | 260 |
| Irrigation 0-10 m/kWh | 7.7 | 2 |
| Irrigation 10-20 m/kWh | 13.5 | 5 |
| New Industrial 10-20 m/kWh | 13.7 | 264 |
| Existing Residential Space Heat 10-20 m/kWh | 15.0 | 17 |
| New Residential Space Heat 10-20 m/kWh | 15.0 | 97 |
| Existing Commercial 10-20 m/kWh | 15.1 | 42 |
| Freezers 10-20 m/kWh | 15.9 | 17 |
| Water Heat 10-20 m/kWh | 17.9 | 291 |
| New Commercial 10-20 m/kWh | 18.9 | 48 |
| New Small Hydropower - Least-cost | 19.9 | 64 |
| Irrigation 20-30 m/kWh | 21.8 | 6 |
| New Industrial 20-30 m/kWh | 21.9 | 126 |
| Commercial Remodel & Retrofit 10-20 m/kWh | 22.0 | 15 |
| Chemical Recovery Cogeneration Upgrades | 22.5 | 195 |
| Existing Residential Space Heat 20-30 m/kWh | 25.0 | 1 |
| New Residential Space Heat 20-30 m/kWh | 25.0 | 129 |
| Compact Fluorescent Lighting 20-30 m/kWh | 25.1 | 47 |
| New Commercial 20-30 m/kWh | 25.8 | 70 |
| Refrigerators 20-30 m/kWh | 26.0 | 88 |
| Water Heat 20-30 m/kWh | 26.4 | 22 |
| Irrigation 30-40 m/kWh | 28.9 | 8 |
| New Natural Gas Combined-cycle, Permitted Sites | 29.3 | 3356 |
| New Natural Gas Combined-cycle, New Sites | 29.9 | 3356 |
| Commercial Remodel & Retrofit 20-30 m/kWh | 30.0 | 22 |
| Existing Commercial 20-30 m/kWh | 30.4 | 49 |
| New Natural Gas Combined-cycle (Dry Cooling) | 30.8 | 4140 |
| Landfill Gas Energy Recovery | 31.1 | 126 |
| New Industrial 30-40 m/kWh | 33.2 | 13 |
| New Commercial 30-40 m/kWh | 34.8 | 25 |
| Existing Residential Space Heat 30-40 m/kWh | 35.0 | 20 |
| New Residential Space Heat 30-40 m/kWh | 35.0 | 10 |
| Existing Commercial 30-40 m/kWh | 36.3 | 42 |
| New Industrial Cogeneration 40 m/kWh and less | 36.4 | 156 |
| Irrigation 40-50 m/kWh | 36.6 | 8 |
| New Boardman Coal Gasification | 37.3 | 867 |
| New Colstrip Coal Gasification | 39.1 | 1627 |
| Clean Combustible Industrial and Municipal Waste | 40.0 | 300 |
| Commercial Remodel & Retrofit 30-40 m/kWh | 40.6 | 8 |
| Wind - Least-cost Winter Peak | 41.0 | 117 |
| New Valmy Coal Gasification | 41.2 | 841 |
| New Centralia Coal Gasification | 41.6 | 867 |
| Existing Commercial 40-50 m/kWh | 41.8 | 68 |
| Water Heat 30-40 m/kWh | 41.9 | 12 |
| Thousand Springs Coal Gasification | 41.9 | 852 |
| Existing Residential Space Heat 40-50 m/kWh | 45.0 | 2 |
| New Residential Space Heat 40-50 m/kWh | 45.0 | 11 |
| New Industrial 40-50 m/kWh | 45.0 | 11 |
| Freezers 40-50 m/kWh | 45.3 | 16 |
| New Commercial 40-50 m/kWh | 45.4 | 42 |
| Wind - Least-cost Spring - Summer Peak | 46.7 | 32 |
| New Small Hydropower - Medium Cost | 46.9 | 89 |
| New Commercial Cogeneration 50 m/kWh and less | 46.9 | 84 |
| New Industrial Cogeneration 40-50 m/kWh | 36.4 | 156 |
| Geothermal - Least-cost | 47.7 | 576 |
| Wind - Medium Cost Winter Peak | 49.4 | 116 |
| Commercial Remodel & Retrofit 40-50 m/kWh | 52.9 | 13 |
| Existing Residential Space Heat >50 m/kWh | 55.0 | 2 |
| New Residential Space Heat >50 m/kWh | 55.0 | 4 |
| Wind - High Cost Winter Peak | 55.8 | 358 |
| New Industrial Cogeneration 50-60 m/kWh | 56.2 | 3339 |
| New Commercial Cogeneration 50-60 m/kWh | 57.1 | 552 |
| Geothermal - Medium Cost | 59.6 | 414 |
| Eastside Forest Thinning Residues | 60.6 | 692 |
| Wind - High Cost Spring - Summer Peak | 63.5 | 79 |
| Water Heat >50 m/kWh | 64.7 | 152 |
| Geothermal - High Cost | 72.8 | 86 |
| New Small Hydropower - High Cost | 78.2 | 45 |
| Central Station Solar Thermal | 80.5 | 467 |
| Existing Commercial >50 m/kWh | 82.6 | 11 |
| * New Commercial >50 m/kWh | 125 | 11 |
| * Commercial Remodel & Retrofit >50 m/kWh | 146 | 4 |
| * Rooftop Solar Photovoltaics, Eastside | 192 | 30 |
| * Not shown in Figure 5-8 | ||
Geothermal: The Northwest is thought to have large geothermal resource potential, but the feasibility of commercial generation of electricity from the resource has yet to be demonstrated. An estimated 400 to 3,900 average megawatts could be secured from geothermal resources in the Northwest and neighboring areas at costs of 4.9 to 7.3 cents per kilowatt-hour. Both quantity and cost estimates are highly uncertain. Costs are expected to decline slowly with the introduction of improved technology. Technology development will, to some extent, be driven by the petroleum industry because of developments in well drilling and other subsurface exploration techniques. Issues associated with geothermal generation include environmental impacts (noise, hydrogen sulfide, geothermal fluids and disposal of drilling materials), effects on hydrothermal systems, and conflicts with ecologically sensitive areas and recreational sites. Projects intended to demonstrate the feasibility of geothermal electric power generation are under development at three Northwest resource areas.
Hydropower: About 170 average megawatts could be secured from new hydropower resources at costs ranging from about 1 cent to 6.5 cents per kilowatt-hour. This estimate includes expansions to existing hydropower projects, addition of power generation to non-power water control structures and development of high-head, small-scale headwater sites. This estimate does not include efficiency upgrades at existing hydropower projects, additions to existing facilities for the primary purpose of securing capacity, or pumped-storage projects. Hydropower is a mature technology, and costs are expected to remain relatively stable. Habitat modification, stream-flow and water-quality effects, erosion and sedimentation, and land and water use conflicts are issues limiting development.
Industrial cogeneration: Cogeneration plants can supply industrial electricity, space and process heating, and cooling loads. Surplus electricity can be sold back to the electrical grid. The enhanced overall thermal efficiency of cogeneration can reduce the cost and environmental impact of supplying overall energy needs. Fuels used for industrial cogeneration include natural gas, fuel oil, spent pulping liquor, wood residues and coal. Many technologies are available for cogeneration, including reciprocating engines, combustion turbines and steam boilers. Installations are often sized ("thermally matched") to the thermal load of the facility. In theory, thermal matching produces the greatest efficiency and environmental benefits. Alternatively, the power plant can be constructed and operated primarily for power generation, and a relatively small amount of steam could be bled to an adjacent industrial plant.
Cogeneration is common in industries with large thermal loads and on-site production of residue fuels. In the Northwest, these include the pulp and paper, wood products and petrochemical industries. As much as 4,600 megawatts of additional industrial cogeneration could be developed in the Northwest, primarily in the food processing, wood products, pulp and paper, petrochemical, rubber and plastic, primary metals and transportation equipment sectors. The potential would be smaller if the plants were built to be thermally matched.
The cost of electricity from these plants would range from about 2.5 cents to 6.0 cents per kilowatt-hour, with most above 4.0 cents. Improvements in generating technology should help stabilize industrial cogeneration costs. Impediments, in addition to cost-effectiveness, include competing investment opportunities, short payback criteria, and uncertainties regarding the long-term viability of some plants. Benefits include improved reliability of power and steam supplies, and reduced air emissions and water consumption.
Renovation of existing cogeneration installations may present special opportunities for cost-effective cogeneration in the near-term. For example, additional power generation can be secured by upgrading older pulping chemical recovery boilers or by adding generating capability to units. The regionwide potential of chemical recovery plant upgrades and additions is estimated to be as much as 195 average megawatts. A representative cost of energy from projects of this type is 2.3 cents per kilowatt-hour. The cost of specific projects will vary because of the unique circumstances at each facility.
Landfill gas energy recovery: Anaerobic decay of landfilled materials produces a gas containing high concentrations of methane. In most cases, this gas is collected and flared. Another alternative is to use this gas to fuel engine-generator sets or small combustion-turbine power plants. Energy recovery from landfill gas could provide about 125 additional average megawatts at an incremental cost of about 3.1 cents per kilowatt-hour. Landfill gas recovery uses relatively mature technology, and costs are not anticipated to decline significantly. There are few impediments to the development of this resource.
Mixed wood residues: Because of public concerns regarding transportation, air-quality impacts and impacts on recycling programs, it is unlikely that new power plants burning unsorted municipal solid waste will be developed in the foreseeable future. However, clean combustible materials sorted from the municipal solid waste stream and combined with wood residues from industrial sources could be used to fuel new power plants or augment the fuel supply for existing plants.
Energy recovery from clean combustible wastes could provide about 300 average megawatts at costs of 4 to 5 cents per kilowatt-hour. Resource availability is uncertain and may decline as higher-value uses for combustible residues develop. Cost is sensitive to plant size, fuel transportation requirements and the value of cogenerated steam. These costs are expected to decline as biogasification technology is introduced. Biogasification technology will also permit use of agricultural residues, expanding the supply of potential fuel. Impediments include competing higher-value uses for residues, fuel transportation costs and land use conflicts.
Natural gas - bulk power generation: An abundant supply of inexpensive natural gas is available from western Canada and Rocky Mountain fields. Declining gas prices, surplus gas transportation capacity, natural gas price risk-hedging instruments, improvements in combustion turbine performance, decline in equipment and construction prices, and apparent ease of project permitting have resulted in gas-fired combined-cycle combustion turbines emerging as the least-cost alternative for new bulk power generation. Sites capable of supporting 7,400 megawatts of additional combined-cycle combustion turbine capacity appear to be available. These could provide 6,800 average megawatts of energy at 2.7 to 3.2 cents per kilowatt-hour (medium gas price forecast). Some of these plants could provide steam to nearby industries.
Technology improvements are expected to offset slowly escalating natural gas prices, while capital costs are likely to remain at current levels. This should lead to stable or slowly escalating electricity costs. Gas-fired combined-cycle power plants can be developed quickly, and have low capital costs and excellent operating flexibility. Issues include long-term gas price stability, nitrogen oxide emissions, consumption of water for cooling and the environmental impacts of natural gas production and processing. The potential effect of carbon dioxide controls is unclear. Because gas-fired combined-cycle plants produce less carbon dioxide than other fossil fuel plants, new gas-fired combined-cycle plants might be substituted for older fossil units.
Natural gas - commercial building cogeneration: Cogeneration plants can supply the space heating and cooling, hot water and electrical needs of commercial buildings. Surplus electricity can be sold back to the electrical grid. The enhanced overall thermal efficiency of cogeneration can reduce the cost and environmental impact of supplying energy requirements. Natural gas is the preferred fuel for commercial cogeneration, and many technologies are available including reciprocating engines, combustion turbines and steam boilers. Packaged fuel cell cogeneration plants have recently appeared on the market. Existing applications are typically confined to relatively large thermal loads such as college campuses.
About 640 megawatts of new commercial cogeneration is estimated to be available for development, primarily in the hospital, military and correctional sectors. The cost of electricity from these plants would range from about 4.5 to 6.0 cents per kilowatt-hour. Though high compared to current market prices, commercial cogeneration costs may be partially offset by transmission and distribution cost savings. The cost of commercial cogeneration is expected to remain stable as improvements in generating technology offset fuel cost escalation. Production-driven improvements in fuel cells could lead to substantial improvements in the cost-effectiveness of commercial cogeneration. In addition to cost, impediments to commercial cogeneration include interconnection issues, competing investment opportunities, short payback criteria, and air quality and other local environmental impacts.
Nuclear: The partially completed WNP-1 and WNP-3 nuclear plants were preserved for many years in case they were needed in the future. However, Bonneville terminated preservation funding as the cost of alternative sources of power declined. Although the units remain intact, completion of either is unlikely unless it is federally financed as a plutonium disposal project.
Advanced, passive-safety, modular plant designs have been developed to counter public concerns regarding plant safety and to reduce costs to competitive levels. The first advanced, passive-safety plant was intended to be in service by 2003. However, no plants of advanced design are currently planned for construction. The design goals for advanced passive-safety plants would result in energy costs of about 4.3 cents per kilowatt-hour. Experience with other new technologies suggests that target costs are unlikely to be achieved. Nuclear plants could produce large quantities of base-load energy without significant carbon dioxide production. However, the capital-intensive nature of nuclear technology, public concerns regarding plant safety and nuclear waste disposal, and performance uncertainties associated with new nuclear technologies are major constraints.
Ocean energy: Limited wave power potential may be present along the outer coast. Because of immature technology, environmental concerns and high costs, the development of this resource is not anticipated in the foreseeable future.
Solar: Southeastern Oregon and southern Idaho have relatively good solar insolation and large areas suitable for the installation of solar generating equipment. But the resource is diurnal and intermittent and seasonally non-coincidental with most Northwest loads. The least-cost central-station solar generation technology currently available is parabolic trough with supplemental natural gas boiler. The estimated cost of electricity from a hybrid gas/solar parabolic trough at prime Northwest solar resource sites is about 8 cents per kilowatt-hour.
Small-scale photovoltaic applications, at current costs of 20 to 25 cents per kilowatt-hour may be cost-effective in locations that are difficult to serve with grid power. Photovoltaic costs are expected to continue to decline at a relatively rapid rate, and small-scale applications providing distributed system benefits are expected to become increasingly common. Central-station solar generation would first become competitive in the Southwest, where good temporal and geographic coincidence between insolation and loads is present.
Wind: The Northwest possesses numerous wind resource areas suitable for electric power generation. The aggregate potential is in the thousands of megawatts, but the greater portion is in north-central Montana, remote from the region's load centers. The best wind sites have a potential of yielding about 700 average megawatts (in addition to current projects) at costs ranging from 3.6 to 7.5 cents per kilowatt-hour. This assumes only limited development of the prime Blackfoot wind resource area of north-central Montana, because of transmission constraints. The quantity estimate is subject to uncertainties regarding wind resource area quality, extent, developable area and turbine array density. The cost estimate excludes the federal production incentive, scheduled to expire for projects placed in service after 1999.
Technology improvements and production economies are expected to provide continued cost reduction. Impediments include transmission constraints, avian mortality and aesthetic impacts. The resource is intermittent, and the winds of some otherwise favorable resource areas are not seasonally coincidental with regional loads. Four commercial-scale wind power projects are under development in the Northwest.
General Prospects for Development of New Generating Resources
Though electrical load growth in the Northwest is expected to continue at rates comparable to the past several years, few new generating projects are scheduled for development. Rather, utilities (and some consumers) are meeting new loads by wholesale power purchases. Northwest peak period (fall and winter) wholesale prices reflect the variable cost of operating existing generating plants located in the Southwest. Many of these are older dual-fuel (natural gas or fuel oil) steam-electric units in California. These plants were not economical to operate for other than peaking purposes for many years because of high fuel prices. The decline in natural gas prices has enabled the operators of these plants to produce competitive base-load power. Moreover, the variable costs of many of these units are lower than the fully allocated costs of new combined-cycle plants, the least-costly new bulk generating resource.
The flexibility of wholesale purchases is attractive in a time of uncertainty and change in the industry. Wholesale contracts require little lead time, require no capital investment and are available for short durations.
Wholesale prices are forecast to gradually rise because of natural gas price escalation and the cost of implementing more stringent nitrogen oxide emission controls on older gas-fired power plants. [The latter can be achieved by acquisition of emission offsets, addition of nitrogen oxide controls to existing plants or by repowering or replacing existing steam-electric plants with new combined-cycle technology.] Even considering these costs, off-peak power from the Southwest is expected to remain highly competitive with new generation. As wholesale power prices rise toward the fully allocated cost of new resources, construction of new plants will eventually resume.
Because of their low cost, an abundance of suitable sites and favorable technical and environmental characteristics, natural gas-fired combined-cycle power plants are the most likely new bulk power generating resource alternative. Continuing technical improvements are expected to partially offset increases in natural gas prices. A few new hydropower projects, upgrades of existing hydropower and thermal plants, and a few new plants using biomass residues will likely be competitive with new gas-fired combined-cycle combustion turbines in the near-term. Technological improvements and production efficiencies are expected to improve the competitive position of many renewable resources and coal-fired power plants (Figure 5-9).
Absent controls on greenhouse gas emissions, new resource needs for the next decade, or longer, will mostly be met with off-peak operation of Southwestern plants, new gas-fired combined-cycle plants, and, possibly, continuing conservation activities (Figure 5-10a). Greenhouse gas controls (such as a carbon tax) could significantly affect this picture. The competitive positions of conservation, renewables and nuclear options would improve relative to existing and new fossil-fuel alternatives (Figure 5-10b). The role of natural gas in this situation is somewhat unclear. Because of their high thermal efficiency and low carbon-content fuel, gas-fired combined-cycle plants might be economic substitutes for older coal or gas-fired steam plants.
Figure 5-9. Resource Cost Trends
[The increase in the cost of wind-generated electricity shown for year 2000 is due to scheduled expiration of federal production incentives. The mid-term increases in the cost of forest thinning biomass is due to the near-term availability of several retired biomass power plants that can be refurbished.]

Figure 5-10. Effect of a Carbon Tax on the Mix of New Resource

5-E. Hydropower System Uncertainties
Another uncertainty the Northwest is facing is how much of the hydroelectric system will be available to generate electricity given operational changes to the system intended to increase fish survival. The existing hydroelectric system and current operations are described in Chapter 4. This section outlines the types of energy and capacity impacts that could occur from changing the operation of that system in an attempt to aid fish.
Congress has recently implemented a budget limitation on Bonneville's expenditures for salmon restoration, including actual program costs and costs for fish-related power purchases and lost revenues. This could provide an adequate budget to maintain current river operations. However, as more information is gathered and more research is conducted, the operation of the river may be further modified. This could lead to more or fewer constraints, depending on the results of the research. This uncertainty is similar to the possibility of a future carbon tax. It may happen, but the timing, magnitude and likelihood is unknown.
It is not now known what set of fish and wildlife recovery measures the region will eventually implement. The Council's Columbia River Basin Fish and Wildlife Program, [Document #94-55, Columbia River Basin Fish and Wildlife Program , December 14, 1994, Northwest Power Planning Council.] the National Marine Fisheries Service's biological opinion [Proposed Recovery Plan for Snake River Salmon , March 1995, U.S. Department of Commerce, National Oceanic and Atmospheric Administration.] and the Columbia River Anadromous Fish Restoration Plan [Wy-Kan-Ush-Mi Wa-Kish-Wit - Columbia River Anadromous Fish Restoration Plan of the Nez Perce, Umatilla, Warm Springs and Yakama Tribes , Vol. 1, June 15, 1995, Columbia River Inter-Tribal Fish Commission.] have all been proposed as salmon recovery plans. Each suggested operation is different and affects the hydroelectric system's capability to produce electricity in different ways. Each scenario would change, to varying degrees, the hydroelectric system's ability to provide both firm energy and peaking capacity. Each scenario could lead to a different set of resource actions for the region.
The current analysis uses an estimate of the availability of hydroelectricity based on the National Marine Fisheries Service's biological opinion. To provide an idea of the size of changes that could be faced, three additional scenarios were analyzed and are described below. They span a range of potential river operations with impacts that are between a gain of 500 average megawatts to a loss of 3,000 average megawatts compared to the biological opinion. Table 5-4 summarizes the impacts of the base case and three additional scenarios relative to current operations. The energy figures shown are the net energy losses. No attempt was made to determine the change in the firm energy load carrying capability (FELCC) of the system.
Water budget operation: This scenario assumes river operations as they were in 1991. It represents an operation with energy and capacity gains compared to current operations. It was the operation in place for the 1991 Power Plan.
Drawdown proposal: This scenario reflects a hypothetical operation that produces both higher energy and capacity losses than current operations. It includes a drawdown of the four lower Snake River dams to natural river elevations year round. All of the energy and capacity from those projects is lost. It should be noted that this is not the same river operation as is contained in the Council's Columbia River Basin Fish and Wildlife Program's Strategy for Salmon.
Tribal proposal: This scenario represents an operation that reduces both the firm energy and capacity of the system well beyond current levels. The operation proposed in the Columbia River Anadromous Fish Restoration Plan is used for this case. This operation calls for higher flow augmentation in both the Snake and Columbia rivers and a drawdown to natural river elevations year round at the four lower Snake River dams and at the John Day Dam.
Table 5-4. Hydroelectric Energy and Capacity Gains or Losses Relative to the 1995 Biological Opinion
[This table reflects only the gain or loss of generating capacity compared to operation under the Biological Opinion. It does not reflect shifting hydrogeneration to other months, when it is not lost, but it may have less value. Calculated losses to firm generating capacity (FELCC) include both factors. The effect on electricity generation from the base case used here -- the Biological Opinion -- is discussed more fully in Chapter 4.]
| Case | Water Budget | Drawdown Proposal | Tribal Proposal |
| Energy Impacts
(average megawatts) |
+500 | -1,300 | -3,000 |
| Capacity Impacts
(megawatts) |
+800 | -2,700 | -5,200 |
The issue for this draft power plan is whether these potential hydropower changes would lead to different resource choices. In general, the answer is no. The availability of additional market purchases in the near term, plus relatively short lead time resources like combined-cycle combustion turbines mean the region could adapt to further losses of hydroelectric capacity, albeit at a cost. Losses on the order of either the Drawdown Proposal or the Tribal Proposal scenarios would require lead time to build replacement resources or increase transmission capability to maintain reliable service. Replacement resources, for example, require from two to five years to bring into service. If needed, intertie expansions might require additional lead time because of the controversy that often accompanies the construction of new, or expansion of existing, transmission lines. On the other hand, were hydroelectric system restrictions to be eased, thus increasing hydroelectric capability, the region would generally be able to reduce more expensive short-term purchases from the Western market.
Fourth Power Plan
posted Apr 16, 2013
- 4-A. Resources Added Since 1991
- 4-B. The Hydroelectric System
- 4-C. Other Generating Resources
- Coal-fired Power Plants
- Nuclear Power Plants
- Natural Gas-Fired Combined-Cycle Power Plants
- Industrial Cogeneration
- Other Renewable Resource Projects
- Other Projects
- 4-D. Conservation
The makeup of the Northwest's electric power system continues to evolve in response to a variety of forces and trends. The existing system and its capability are described in detail in Appendix A. Figure 4-1 shows the composition of generating resources in the region. Generating resources in the Northwest amount to more than 17,000 average megawatts.
The majority of regional generation, about 66 percent, comes from the hydroelectric system. Coal resources are the next largest component, representing 18 percent of all generating resources, followed by natural gas, nuclear and biomass resources.
4-A. Resources Added Since 1991
Beginning in the late 1980s, increased economic activity and accompanying electrical load growth initiated a period of active resource acquisition in the Northwest. For most of this period, utilities relied on competitive bidding, conservation activities and the development of utility-owned projects for meeting growing resource needs. Competitive bidding appeared well-suited both to secure low-cost generating resources and to account for environmental externalities, resource diversity objectives and other non-market societal objectives.
Some conservation also was acquired through competitive bidding, but utility programs, building-and appliance-efficiency standards, market transformation initiatives and other efforts were generally more effective for securing conservation. Since 1980, the Northwest has secured more than 1,200 megawatts of electricity savings. About 520 megawatts of that total have been saved since 1991.
Figure 4-1. Generating Resources of the Northwest Power System (Firm Energy Basis)
[graphic doesn't display correctly]

Conservation and generating projects totaling about 2,470 average megawatts of energy were secured during the 1991 through 1995 period (Figure 4-2). Declining natural gas price forecasts, improving combustion turbine technology, declining capital costs, and relative ease and speed of construction continued to improve the attractiveness of gas-fired combined-cycle power plants. Natural gas-fired projects providing about 1,400 average megawatts of energy were acquired during this period, comprising about 57 percent of total acquisitions on an energy basis. About 520 average megawatts of conservation were acquired since 1991, representing about 21 percent of total new acquisitions. Renewable energy projects, primarily hydroelectric and projects using biomass residue fuels, provided about 420 megawatts of resources that were committed to during this period. The balance of acquisitions include upgrades to existing thermal projects and projects using coal or petroleum coke.
Natural gas resources have increased the most in the last five years, from 3 percent in 1991 to 7 percent in 1996, primarily due to the fact that natural gas is among the least expensive and most flexible new generating options available. Although concerns have been expressed about what some have termed an "over-reliance" on gas-fired new generating resources, overall resource diversity is probably greater than it ever has been because of the new gas-fired resources. Furthermore, because of the increasing importance of the Western wholesale electricity market, resource diversity in the Pacific Northwest will probably be of lesser significance than West Coast resource diversity. The Northwest and California systems combined provide significant resource diversity.
Figure 4-2. Resource Acquisitions: 1991 through 1995 (average megawatts)
[Projects completed during the 1991 through 1995 period, or under construction at the close of 1995. Planned projects for which construction has not commenced are not included in Figure 4-2. Graphic doesn't display correctly.]

Although regional electrical load growth continues, there have been no solicitations for new power plants within the past year. Declining natural gas prices and an increasingly active wholesale market have made the surplus of capacity on the interconnected Western system less expensive, more evident and more accessible. Utilities and large consumers are purchasing inexpensive wholesale power produced by existing plants on the Western system rather than building or purchasing the output of new power generating facilities. Low-price wholesale power has even led to suspension of construction for several projects, most notably the 248-megawatt Tenaska Washington II gas-fired combined-cycle plant.
Conservation activities, too, have declined. Conservation acquisitions in 1996 are expected to amount to only 70 average megawatts, about 60 percent of the region's 1995 acquisitions.
The Northwest power system has also lost resources over the last five years, including:
- Reduction of the operational flexibility and generating capability of the Columbia River Basin hydroelectric system as a result of changes in the pattern of reservoir storage and water releases intended to improve the survival of anadromous and resident fish. This has resulted in an estimated reduction of 850 average megawatts of firm energy capability;
- Closure of the Trojan nuclear power plant in the face of a requirement for significant additional capital investment to remedy problems encountered at the plant. This has meant the loss of 725 average megawatts of energy.
The changes in Northwest electricity resources since 1991 have probably resulted in a net increase in the emissions of carbon dioxide, a gas implicated in global warming. Factors that would increase carbon dioxide production include the closing of the Trojan nuclear power plant and the loss of hydroelectric generation due to spilling water to enhance fish passage.
Fish mitigation activities that shift power production seasonally or from firm to nonfirm periods do not necessarily increase carbon dioxide production. Power produced during fish flow periods, for example, may displace carbon-dioxide emitting fossil-fuel plants in the Southwest. But, foregone hydropower during other seasons and the lost power from Trojan will be replaced by higher carbon-dioxide emitting generation, except to the extent the losses are replaced by conservation, hydroelectricity or biomass generation. The net effect of emissions from new gas-fired combustion turbines is difficult to ascertain because the turbines may displace the operation of power plants that emit even more carbons, such as coal-fired plants.
The remainder of this chapter describes the major electricity resources in use in the Northwest.
4-B. The Hydroelectric System
The Northwest's hydroelectric system, although reduced in its capability and flexibility, is still an adaptable and low-cost resource. It produces more than two-thirds of the electricity in the region. In the near term, the region's advantageous position with respect to gas markets and the relative flexibility of gas-fired generation are important complements to the hydroelectric system. The flexibility of the hydroelectric system may also prove valuable when intermittent renewable resources are integrated into the power system. The challenge is to maintain and enhance the value of the hydroelectric system, while at the same time providing for non-power uses such as flood control, irrigation, recreation, transportation and fish and wildlife.
The hydroelectric system differs from thermal generating resources in that its instantaneous generating capacity far exceeds the amount of energy it can produce over the course of a year. This is because reservoirs cannot store enough water to keep turbines running at full capacity all year. Consequently, Northwest utilities have traditionally focused on meeting annual average energy needs as opposed to daily peak electricity demands.
The Columbia River hydroelectric system's sustained peaking capacity [Sustained peaking capacity is the power system's ability to meet electricity demands during the peak hours of the day for a sustained period of time, usually the five working days of the week. The peak demand period per workday typically lasts 10 hours.] is about 25,000 megawatts, [1995 Pacific Northwest Loads and Resources Study, Bonneville Power Administration " The White Book ," December 1995.] but limitations on the storage capacity of the system result in significant variations in the system's energy output from year to year, depending on annual rainfall and snowpack accumulation. In the driest years, the hydroelectric system produces only about 11,700 average megawatts of energy. Utility planners can expect at least that much energy in any given year, so it is considered guaranteed or "firm" energy. In the wettest years, the hydroelectric system produces about 20,000 average megawatts. In average water years, the dams generate approximately 16,500 average megawatts.
Generation in excess of what can be guaranteed is commonly referred to as "nonfirm" or "secondary" energy. Nonfirm energy is sold on the spot market or under short-term contracts at lower prices than is obtained for firm energy. It is used to serve interruptible loads or to displace more expensive resources both in and out of the region.
Accommodating Fish and Power
The Columbia River historically supported one of the world's largest salmon populations. Over the years, however, the number of salmon and steelhead in the river has decreased dramatically. Several Columbia River Basin salmon species are now extinct. Others have declined nearly to the point of extinction. Hydroelectric development has been an important factor in that decline. The natural flow of the Columbia River peaks in spring and early summer, when the snowpacks melt. Energy production from the hydroelectric system depends on this flow of water. If reservoirs were not available to store water for later use, the energy derived from the hydroelectric system would rise and fall with the natural flow of the river. This would not be a very reliable or valuable source of electricity because peak river flows (in spring) do not coincide with peak electricity demands (in winter). Figure 4-3 illustrates the monthly pattern of river flows under natural conditions, before hydroelectric development, and under current conditions, which include changes in dam operations to protect salmon and other fish and wildlife. [Natural flow data was obtained from the Bonneville Power Administration's document "Seasonal Volumes and Statistics, Columbia River Basin 1928-1989," July 1993.]
By building dams to hold back some of the spring runoff for use the following winter, the output from the hydroelectric system can better meet the seasonal fluctuations in electricity use in the Northwest. Although this shifting of river flows makes the hydroelectric system a more valuable source of power, it also creates a more hostile environment for migrating juvenile salmon. Inundation of spawning and rearing habitat and hazards created at the dams themselves have also affected salmon production and survival.
But the dams were not built for electricity alone. They also help control flooding, provide water for irrigation and industrial use, improve navigation on the river and expand recreational opportunities in the Pacific Northwest. All these uses can have adverse impacts on both fish and power. In addition, salmon populations have been affected by commercial and sport fishing, ocean conditions, hatcheries and hatchery-bred fish, habitat destruction caused by logging, grazing and other developments, and a host of other factors that are not well understood. The Council's Columbia River Basin Fish and Wildlife Program addresses all of these impacts.
Because the hydroelectric system is one of the important factors affecting fish and wildlife survival, its operation has been modified since the early 1980s in an attempt to create a better balance between the generation of electricity and protection for fish and wildlife. As at-risk fish stocks have weakened, further constraints on the operation of the hydroelectric system have been implemented. The effect of most of these changes is to shift the release of water back toward the spring and early summer to more closely approximate the natural flows of the river. By releasing less water from headwater storage projects during the winter months, more is available for later release during the spring smolt migration period.
Figure 4-3. Average River Flows at The Dalles Dam

However, this action reduces the amount of energy available from the hydroelectric system during the winter months and forces the production of energy during a time when it is not in great demand. This effectively reduces the firm energy generating capability of the hydroelectric system. During dry years, lost winter energy must be replaced if all firm energy demands are to be served.
The Council's 1982 Fish and Wildlife Program included measures that reduced the firm energy generating capability of the hydroelectric system by an estimated 300 average megawatts. In addition, water laden with juvenile salmon was spilled over dams to divert the young fish from the turbines. The spills further reduced the firm energy generating capability of the system by about 50 average megawatts. This was the river operation that was used as the basis for resource analysis in the 1991 Power Plan.
Since 1991, more fish and wildlife protection measures have been implemented. Changes in river operations since 1991, including those enacted by the National Marine Fisheries Service to protect endangered Snake River salmon, have reduced the firm generating capability by an additional estimated 850 average megawatts (about a 7-percent loss). Consequently, the total reduction in firm energy generating capability of the hydroelectric system since the Council adopted its first fish and wildlife program amounts to approximately 1,200 average megawatts, representing a 10-percent loss. Figure 4-4 illustrates the average monthly change in hydroelectric generation due to fish and wildlife measures.
Under current operations, the hydroelectric system produces an average of nearly 10,000 megawatt-months less energy in the fall and winter compared to 1991 operations. About 4,000 megawatt-months are shifted into spring and summer months, and nearly 6,000 megawatt-months of energy are spilled or lost due to efficiency losses. [Efficiency losses occur when power is generated at lower reservoir elevations. Reservoirs are operated at lower elevations in order to increase the velocity of the river.]
Figure 4-4. Changes in Hydroelectric Generation by Month Since 1991

In some fall or winter months, it can be necessary to purchase electricity from outside the region to provide adequate water for spring flow augmentation and serve firm Northwest electricity demands. The total cost to the power system of operations to protect fish and wildlife are calculated by combining power purchase costs, lost revenues due to reductions in firm power production and changes in the amount and value of nonfirm power.
A more constrained operation of the mainstem Columbia and Snake river reservoirs also results in capacity losses. For example, prior to the 1980s, the elevation of the lower Snake run-of-river projects varied five feet or more on a daily basis. These dams are drafted during the peak-demand hours of the day and refilled during the light-load hours of the night. If these reservoirs are now constrained to fluctuate only about a foot to benefit various fish populations, they lose much of their ability to meet daily peak-demand swings. This limited operation may also result in the loss of nonfirm energy. If reservoirs are not allowed to fill completely during the lightly loaded hours of the night due to elevation limitations, some water may have to be spilled, resulting in lost generation.
4-C. Other Generating Resources
In addition to the hydroelectric system, other sources of bulk electric power in the Northwest include large coal-fired power plants, the Washington Public Power Supply System's WNP-2, and simple-cycle and combined-cycle natural gas combustion turbines. Electricity is also produced by industrial cogeneration plants, small biomass plants and numerous small hydroelectric projects. A table and map of individual Northwest power generating projects is provided in Appendix A.
Coal-fired Power Plants
Following the development of the Columbia River hydroelectric system, coal and nuclear power were viewed as the most economical new sources of electricity. Abundant supplies of low-cost, low-sulfur coal are available from the Rocky Mountain states and western Canada fields, and more limited supplies of lesser quality from Washington fields. Accordingly, between 1968 and 1986, 14 coal-fired power units at six sites were brought into service by Northwest utilities. These large plants can serve about 6,660 megawatts of winter peak load, of which about 3,990 megawatts are currently dedicated to Northwest loads. These plants can produce about 5,520 average megawatts of energy, of which 3,395 average megawatts are dedicated to Northwest loads. Because the minemouth units have low operating costs, they are operated under nearly all conditions. Units that use coal supplied by rail are more expensive to operate and currently compete with natural gas combined-cycle power plants and off-peak power from Southwestern plants.
Nuclear Power Plants
Concurrent with the development of the region's large coal-fired power plants, regional utilities initiated construction of 10 nuclear plants. Only two, Trojan, in Oregon, and WNP-2, in Washington, were eventually completed. [Trojan was completed in 1976 and WNP-2 in 1984. The Hanford Generating Project operated on steam from the N-reactor, a Hanford Production Reactor, until 1988, when it was shut down upon termination of plutonium production operations at Hanford. ] Two partially completed plants, WNP-1 and WNP-3, were preserved for many years for completion, if needed. With the continuing decline in gas prices, they have been terminated. Nuclear plant operating costs have generally been higher and plant availabilities lower than anticipated when these plants were ordered.
Trojan was permanently shut down in 1993, when it was concluded that the cost of a needed steam generator replacement would result in production costs barely competitive with the cost of power from new resources. WNP-2, upgraded from its original peak capacity, can now serve about 1,170 megawatts of winter peak load. The plant produced 822 average megawatts of energy in Bonneville's 1995 Fiscal Year and was available to produce 890 average megawatts. WNP-2 currently has operating costs that are above market prices. The Washington Public Power Supply System, owner and operator of the plant, has established aggressive cost reduction targets. However, continued low market prices pose a risk for the continued operation of WNP-2.
Natural Gas-Fired Combined-Cycle Power Plants
The abundant gas resources of Western Canada and the Rocky Mountain states are accessible to the Northwest by two interstate pipelines. Declining natural gas prices and improving combustion turbine technology have made gas-fired combined-cycle power plants the least-costly new resource for bulk power production. Most of these projects consist of one or two combined-cycle combustion turbine units, and many serve modest cogeneration loads.
Six gas-fired combined-cycle projects were in service in the Northwest by the end of 1995. Two additional projects are under construction. [Combined-cycle power plants in operation in the Northwest by the end of 1995 include Beaver, March Point, Sumas Energy, Tenaska Washington I, Encogen and Coyote Springs 1. Hermiston Generating Project is scheduled for service in 1996. Construction of the River Road project commenced in February 1996. Additional information regarding these projects is supplied in Appendix A.] Projects in service or under construction at the end of 1995 will serve about 1,900 megawatts of winter peak load and can produce about 1,460 average megawatts of energy. Some of these projects are owned by independent developers and others by utilities.
Additional projects totaling about 930 megawatts of capacity are currently permitted for construction. One of these projects is partially constructed, but further construction has been suspended. Construction on the other projects is not scheduled. License applications for additional projects of about 2,700 megawatts total capacity are being considered by licensing agencies. Developers have indicated that they will apply for licenses for several additional projects.
Three of the projects for which licenses are being sought are part of Bonneville's Resource Contingency Program. This program responded to the 1991 Power plan's call for obtaining "options" on the development of 2,450 average megawatts of new generating resources. By taking projects through the siting and licensing process, but delaying the actual construction until the market for the power is clear, it is possible to reduce the risk of investing in generation in advance of need. The options concept was devised primarily for long lead time resources and a regulated generation market. The value of options with resources that have much shorter lead times and a competitive generation market may not be as great as it was under those earlier conditions. On the other hand, siting and licensing some projects in advance of market demand may continue to provide some benefits for both prospective developers and the public.
Industrial Cogeneration
Industrial cogeneration in the forest products industry has long been a component of Northwest electric power generation. These plants include chemical recovery boilers in the pulp and paper industry, and power boilers fired by wood residues, fuel oil and gas in both the pulp and paper and lumber and wood products sectors. More recently, gas-fired combustion turbines have been installed as industrial cogeneration units.
Because of the many mill closures of recent years, and because many industrial cogeneration plants do not sell power offsite or generate power only when fuel costs are favorable, a precise inventory of operating industrial cogeneration plants is difficult to obtain. There are estimated to be approximately 70 plants in operation. These total in excess of 770 megawatts of capacity and are capable of producing in excess of 600 average megawatts of energy. Most industrial cogeneration plants in the Northwest are owned by the host facility, but recently several have been developed by utilities.
Other Renewable Resource Projects
Biomass: Many of the cogeneration plants described above use wood residues, spent pulping liquor and other biomass fuels. The number and diversity of small biomass plants has expanded in recent years and now includes plants using pulping liquor, wood residues, landfill gas, municipal solid waste and wastewater treatment plant gas.
Hydroelectric: Many hydroelectric projects have been developed on coastal streams, tributaries of Puget Sound and tributaries of the Columbia River. Most suitable large-scale sites have been developed, and recent development has focused on headwater diversion projects, projects on irrigation systems and upgrades of older hydroelectric projects.
Geothermal: There has been no commercial development of the potentially abundant geothermal resources of the Northwest for electric power generation. [Small demonstration projects operated briefly at Raft River, Idaho, and Lakeview, Oregon. Numerous direct applications of geothermal energy for space or process heating are found in the region.] Pilot projects are being developed at Newberry Volcano, in Oregon, and Glass Mountain, in Northern California, to explore the cost and feasibility of using these resources for power generation. Though it is unlikely that these projects will be competitive with the near-term wholesale power market, geothermal may prove to be an important source of renewable power in the long term.
Wind: Four commercial-scale wind projects are being developed to explore the cost and feasibility of using this resource for power generation in the Northwest. Though more expensive than electricity from new gas-fired combined-cycle power plants, wind power is the least-costly renewable alternative for producing large quantities of energy.
Solar: Solar photovoltaic power is often cost-effective for small, remote loads. Applications of this type continue to increase.
Other Projects
Several gas and oil-fired combustion turbines serve peak loads and may generate bulk power when gas prices are low. Other gas or oil-fired small combustion turbines, older steam plants and engine-generator sets provide emergency electricity service.
4-D. Conservation
Conservation is the first-priority electric power resource in the Northwest Power Act, where it is defined as "any reduction in electric power consumption as a result of increases in the efficiency of energy use, production, or distribution." As a result of utility-supported conservation efforts undertaken since the passage of the Act in 1980, the cumulative conservation savings enjoyed by the region's electricity consumers in 1996 amounts to about 1,000 average megawatts. This level of annual savings is equivalent to the power output of five average-sized gas-fired combustion turbines. Utility-funded energy conserved since the passage of the Act amounts to nearly 60 billion kilowatt-hours, with a retail value to consumers of $2.5 billion.
An additional 200 average megawatts are estimated to have been saved through programs, codes and standards at local, state and national levels. Figure 4-5 depicts the annual utility-sponsored first-year conservation savings by sector from 1978 to 1994. This information comes from Nutrak, the Council's Northwest Utility Conservation Tracking System.
To accomplish these savings, the region has weatherized more than half a million homes or apartments, replaced thousands of showerheads with efficient models, installed efficiency measures for a quarter-million irrigated farm acres, produced several hundred thousand new high-efficiency site-built homes and 65,000 high-efficiency factory-built homes, upgraded the residential and commercial energy codes across the region, made conservation modifications to the aluminum refining plants, and developed a thriving energy-efficiency industry. These accomplishments have required perseverance, commitment, fresh thinking and hard work. They also required an estimated outlay of more than $2 billion. The Council has estimated that these savings were acquired at an average real levelized utility cost of about 2 to 2.5 cents per kilowatt-hour, about half the cost of the next most costly resource available at the time.
The pattern of conservation acquisition over time demonstrates some of the flexibility of the resource. After a period of surplus generating capacity in the mid-1980s, the 1991 Power Plan forecast a need for new resources and called for the region to acquire at least 1,500 average megawatts of energy savings by the end of the decade.
Figure 4-5. Regional Summary of First Year Conservation Savings by Sector, 1978-1994

This meant a shift in emphasis from conservation "capability building" to conservation resource acquisition. [Conservation capability building in the mid to late 1980s was directed at maintaining a viable conservation infrastructure and carrying out experimentation to identify viable strategies for conservation acquisition. The major exception to this was the Conservation/Modernization project carried out with the aluminum companies in the late 1980s. The purpose of this project was as much or more to maintain the viability of the aluminum industry in this region in a period of depressed world aluminum prices as it was to acquire conservation savings.] From 1991 through 1994, the region's electric utilities acquired about 400 average megawatts of energy savings, exceeding the expectations of the 1991 plan. Since 1980, the region's public utilities, including Bonneville, have delivered about 56 percent of the total savings, and the investor-owned utilities delivered about 44 percent. The figure below charts the public/investor-owned utility split.
The ups and downs of annual conservation efforts shown in Figure 4-6 are due to the fact that the region was in need of electricity in the late 1970s and early 1980s, and conservation efforts were accelerated. In the early to middle 1980s, the region was in a period of surplus capacity, and conservation efforts were slowed. In the early 1990s, there was again a need for resources, and the region responded once again by increasing conservation efforts. In the mid-1990s, conservation is again being slowed, as utilities see an uncertain future, and inexpensive energy is abundant in the West Coast market.
Fuel Choice
The issue of fuel choice is related to electricity efficiency. The specific issue raised for the Council has been direct use of natural gas in homes and businesses as an alternative to the use of electricity generated by burning natural gas. In 1994, the Council studied the direct use of natural gas in homes. The study found that, although in many cases direct use of natural gas is more energy efficient than electricity use, the most economically efficient resource is very application-specific.
In general, conversion to natural gas is most cost-effective in homes that use a lot of energy. Thus, large homes, poorly insulated homes, or homes in colder climates tend to be the most promising conversion candidates. The Council estimated there might be 730 average megawatts of cost-effective residential fuel conversion savings available in the region. This was primarily from conversions of electric water heaters or electric forced-air furnaces to natural gas. Just as lower avoided electricity costs have reduced the potential amount of cost-effective electricity conservation, so would it reduce the amount of cost-effective fuel conversions.
The Council adopted a policy of considering direct use of natural gas as an alternative to conservation or electricity generation. The policy further stated that market-based approaches were the preferred method of pursuing cost-effective direct gas use. The primary methods of implementing this policy were thought to be encouraging the efficient pricing of electricity and ensuring that conservation incentive payments were not distorting market decisions away from direct use of natural gas where that is the more cost-effective option.
Both of these market-distorting problems are being substantially solved by the restructuring of the electricity industry. Low-priced natural gas generation alternatives have reduced the marginal cost of electricity to near the average cost-based electricity price. As a result, much more accurate price signals are evolving in the electricity market. Electricity market restructuring may also substantially eliminate the ability of electric utilities to make incentive payments for increased electric efficiency. Even before these changes, the market penetration of natural gas had been quite strong in areas where gas is available. With the restructuring of the electricity industry, there is no longer a convincing need to intervene in the fuel-choice market, nor is there really any effective way to do so.
Figure 4-6. First Year Conservation Savings by Utility Type (Public/Investor-Owned)

Fourth Power Plan
posted Apr 16, 2013
- 3-A. Benefits of Competition
- 3-B. Principles for a Competitive Electricity Market
- 3-C. Characteristics of Competitive Markets
- 3-D. Limitations of Competitive Markets
- 3-E. The Transition Matters
The introduction of competition into the Northwest electricity industry is the overarching consideration motivating the Comprehensive Review of the Northwest Energy System. Both the reality of wholesale competition, with much of its focus on the Bonneville Power Administration, and the anticipation of retail competition have captured the attention of the electricity industry and those interested in its effects on the region. Competition in some form will happen. However, how competition evolves in the region will certainly influence how fully the potential benefits of competition are achieved; how the benefits and costs are distributed; the cost and reliability of our power supply; the effects on the environment; and the future role of current institutions, including public and investor-owned utilities, the Bonneville Power Administration and the Council. In the words of one authority on electricity industry restructuring, "You don't just say "We're going to have a competitive market." You have to think very carefully about how the pieces fit together with different mixes of regulation and deregulation." [Hogan, William, "it's all in the Structure," The Electricity Journal, November 1995, p. 60.]
3-A. Benefits of Competition
A fully competitive market for energy services has the potential to create tremendous benefits for the electricity consumers of the Northwest. Competition drives producers to become more efficient, thus lowering prices. It also spurs the creation of new products tailored for specific market niches, providing a greater range of choice to consumers. There are indirect benefits of competition that are equally significant. Historically, low electricity costs have been a major factor in the economic growth of this region. Competition promises to continue that trend and sustain the expansion of the Northwest economy. Competition in electricity markets will result in more transparency of electricity prices and of what is included in these prices. For example, it will be much easier to tell how much of an electric bill is paying for kilowatt-hours, how much is for distribution services, how prices are different at different times and so on. This should lead to greater efficiency. For all these reasons, competition should be embraced. The tricky part will be restructuring the current electric power industry so that effective competition, not just deregulated oligopolies, emerges to benefit all consumers.
3-B. Principles for a Competitive Electricity Market
A well-accepted definition of a perfectly competitive market is a market where no individual participant is large enough to influence the market price of the product. [Samuelson, Paul A., Economics, Seventh Edition, p. 41.] Although we in the United States like to think of ours as a competitive economy, in reality we have a mixed economy. This is because the conditions for perfect competition are seldom met in an industry. Some industries are inherently monopolistic and have traditionally been subject to regulation. For other industries, there is antitrust legislation, enforced in the federal courts, to ensure that a reasonable degree of competition is maintained.
This draft assumes that the portion of the electric utility industry that is opened to competition will be governed by antitrust laws. However, these laws do not apply to federal agencies. This creates a unique issue for the Northwest because more than half the power generated in the region comes from federal sources.
As the Comprehensive Review progresses, it is important to remember that the act of deregulating does not guarantee that adequate competition will result. Without adequate competition, the region will not see the benefits expected from deregulation. The proposed new structure of the electric utility industry should foster and protect competition where it is feasible, and separate competitive markets from non-competitive markets that require continued regulation. In addition, the inherent limitations of fully competitive markets need to be acknowledged.
Absence of Market Power
The absence of dominant market power is the key to fair and effective competition. That is, no player has the ability to control prices and profits. Excessive market power can arise from several factors, all of which require consideration in the course of any restructuring. The sources of market power are: too few sellers; restricted access to markets; mixing of regulated and unregulated activities; and, more generally, situations in which not all participants are subject to the same rules and requirements.
Many Sellers
Market power exists when there are so few sellers that those sellers are able to manipulate prices. [Newberry, David M., "Power Markets and Market Power," The Energy Journal, Vol. 16, No. 3, 1995, pp. 39-66.] Where there are too few sellers, deregulation may just trade regulated monopolies for unregulated oligopolies. Many critics of the results of privatization/industry restructuring efforts in the United Kingdom point to the fact that too much of the generating capacity was held by very few producers, allowing those companies to manipulate prices
In efficiently functioning competitive markets, producers are no longer "price givers," who can set prices to recover costs and, in the case of investor-owned entities, earn an assured rate of return. Producers must accept the prices set by the interplay of supply and demand, or choose not to operate. Those prices will trend toward the marginal operating cost of the most expensive unit to operate in a given time period. From the standpoint of economic efficiency, this is what society wants to see. Consumers get to trade-off the benefit they derive from their marginal unit of consumption against the producer's cost of supplying that marginal unit.
It is also important to recognize that electricity is not a homogenous product. There are many other products associated with the sale of electricity, such as load following capability and reserves. There may be many sellers of some services, but too few for others. Similarly, the market may have many sellers generally, but transmission constraints can limit market entry in some areas. The problem is just as severe if there are many sellers, but a few dominate the market due to their size or other advantages.
Market Access
For a market to function efficiently, suppliers must have access to the market; suppliers must be able to deliver products to consumers. When the Federal Energy Regulatory Commission mandated open, nondiscriminatory, electricity transmission access and functional unbundling, it intended to put this market principle in place by assuring suppliers equal access to potential wholesale customers. The intent of functional unbundling is to separate the generation and transmission functions within a utility's organization to minimize the opportunity or temptation to use control of transmission to the advantage of one's own generation.
Functional unbundling and open access tariffs might provide nondiscriminatory market access. Open access tariffs require an owner of transmission to provide access to others under terms and conditions comparable to those the owner applies to itself. However, leaving generation and transmission under the umbrella of a single organization runs the risk of that organization using its transmission branch to benefit its own generation. It may be very difficult, moreover, for regulators or competitors to demonstrate that anti-competitive behavior actually took place. Many utilities in the Northwest have expressed concern, for example, that Bonneville, which owns so much of the region's high-voltage transmission system, could exercise subtle restraint on transmission access, to benefit its own generating resources.
There are at least three preventative steps beyond those described above that might be taken. Each offers increased certainty that nondiscriminatory open access will be achieved, but each is increasingly complex. The first step is to spin off generation or transmission to an affiliate. While this further separates the two functions, it does not guarantee that transmission decisions would not be influenced by the interests of the generating affiliate.
The second step is to vest decisions over transmission operation in an independent operator with no financial interest in generation. Ownership in the transmission system would not necessarily change hands, only responsibility for operation of the system would change. Many restructuring proposals being considered across the country feature an independent grid operator who would run the transmission systems of multiple owners as a single system. An independent grid operator may offer some operational efficiencies, as well. The independent grid operator could also be responsible for transmission system expansion decisions.
The third, and most certain, but also most difficult step is divestiture, i.e., selling off the generation or transmission assets. Divestiture is certain because the new owner of the transmission would have no interest in generation. It is most difficult because of the legal and financial transactions involved in divestiture. What are the assets worth? How are the proceeds to be allocated? How will the transaction be taxed? These and a host of other issues complicate divestiture, but do not make it impossible. While these difficulties are complex, this alternative would result in a lower ongoing regulatory burden than that associated with continued common ownership of generation and transmission. [Zeigler, Belton, "Affiliate Transactions and Electric Industry Restructuring," The Electricity Journal, October 1995, pp. 20-27.]
Consumer Choice
Consumer choice is the ability of consumers to choose among different products and different suppliers. Choice is a basic requirement for efficient competitive markets in that it is a corollary of having many suppliers with open, nondiscriminatory market access. Consumer choice drives competitive markets. In the case of wholesale competition, it is the ability of wholesale customers to choose among suppliers. In the case of retail competition, it is the ability of retail consumers to choose their supplier directly. In either case, it is consumer choice that forces suppliers to bring down their costs and make innovations in their products and services. Without consumer choice, regulation is needed to substitute for the discipline of the market and protect consumers from the abuse of monopoly power.
Separation of Regulated and Unregulated Activities
If a supplier were able to subsidize its competitive position by shifting costs to its regulated activities, it would unfairly gain market power. For example, there is a consistent complaint from the Bonneville Power Administration that its investor-owned competitors are able to recover the fixed costs of their resources from their regulated retail business and compete for Bonneville's wholesale customers on the basis of variable operating costs alone. Whether this is entirely true is not known, but it does illustrate the concern.
A second concern arising from the mix of regulated and unregulated functions is that the regulated function will take second place in the internal competition for scarce capital resources. Given the choice between investing scarce capital in an unregulated business that can earn an unregulated rate of return and investing it where it can only earn a regulated return, most businesses will be drawn to the higher return. If that is true, the consequence could be that investment needed to ensure the reliability and efficiency of transmission or distribution will go begging. In the telecommunications industry, which is further along in the deregulatory process, recent experience has raised concerns about the quality of local phone service, the part of the business that remains a regulated monopoly.
There are arguments to be made in favor of continued vertical integration of regulated and unregulated activities. In addition to the transaction costs involved in divesting, there is the possibility that the increased transaction costs between the now-separated portions of the business, (e.g., the need to contract for transmission services) could outweigh the competitive benefits achieved by limiting the market power associated with vertical integration. [Kaserman, David L. And John W. Mayo, "The Measurement of Vertical Economies and the Efficient Structure of the Electric Utility Business," The Journal of Industrial Economics, V XXXIX, N. 5, September 1991, pp. 483-502.] However, the principle of minimizing market power is, in the opinions of many people, so important that the burden of proof should rest with those opposing divestiture.
Consistent Rules
Relative market power can also be affected if different competitors are subject to different ground rules. For example, different regulatory regimes, different tax liabilities, different costs of capital and other factors can affect relative competitiveness. The Northwest, with its mix of federal, investor-owned, and local publicly owned entities, has significant potential for these kinds of market distortions.
3-C. Characteristics of Competitive Markets
Although perhaps not as fundamental as the principles discussed above, there are also some characteristics of competitive markets that should be kept in mind in the course of any restructuring process.
Risk and Reward
Competitive markets imply the possibility of business failure and capital loss. A positive return on capital investment can only be guaranteed by substantial market power (historically, monopoly power for utilities). In the regulated monopoly environment, investors trade low risk (the relatively assured recovery of capital investment from franchise customers) for relatively low regulated rates of return. In the competitive environment, investors have no assurance that costs can be recovered. Competitive markets, however, also imply the possibility of success and profit. Investors take on risk in return for the possibility of a higher, unregulated rate of return.
The structure, rules and institutions of a competitive electricity market have to accommodate the possibility of both market success and market failure. Is there the ability to absorb loss? If there is a "profit," how and to whom is it to be distributed? The answers to these questions are fairly clear for investor-owned utilities. Stockholders should realize that their stock might go up or down. The issue is potentially most difficult for the publicly owned part of the industry – Bonneville and the consumer-owned utilities that don't have stockholders to take profits and losses.
Markets are Dynamic
It is tempting to think we know the conditions competition will bring and that if we can adjust the existing legal and regulatory system to fit those conditions, everything will be fine. In reality, however, we can't know what future conditions will be. The interplay of markets and technological advances can stimulate changes that alter the competitive landscape. For example, continued improvements in the cost and performance of small-scale generation and energy storage could result in a very different picture of the competitive future than the one that seems likely today. On the other hand, unforeseen resource constraints or environmental restrictions could turn the market in entirely different directions. In considering the restructuring of the industry it is important to put in place structures and systems that are consistent with the overall principles of competitive markets, not the specifics of the electricity market as we foresee it today.
3-D. Limitations of Competitive Markets
Competitive markets are not without limitations. These limitations also have to be kept in mind as restructuring is considered.
Markets are Rarely Perfect
Markets do a wonderful job of allocating society's resources when all relevant costs are reflected in prices and when market barriers are minimal. However, there frequently are environmental costs that are external to the market process. For example, the health and environmental costs of sulfur dioxide pollution were external to the power industry until federal emissions standards and caps were established.
In addition, customers often lack complete knowledge of their alternatives. Poor information about the cost, performance and reliability of some conservation measures, for example, makes it difficult for them to compete against better understood resources. Some firms also might have a degree of market power in some part of their customer base.
These are imperfections that are not resolved now and can never be resolved fully. They exist to various degrees in most markets. It would be erroneous to assume that by moving from a regulatory environment to a market environment, all misallocations of resources would be eliminated. The move to competitive markets requires continued attention to issues of market externalities and other market imperfections.
Efficiency Not Equity
Markets, even when they perform well, are about efficiency, not equity. There may be societal goals, such as addressing low-income consumers, providing rate relief to groups or areas that would otherwise experience higher costs, or providing stimulus to a socially desired economic activity that may not be met by the competitive market. These can be entirely legitimate policy goals.
This region, and in particular, the Bonneville Power Administration, has frequently used power system revenues or rates to support these kinds of goals, including reducing irrigation and river transportation costs. This type of implicit subsidy was possible in a regulated monopoly. Competitive markets, however, cannot sustain cross-subsidies. One customer's subsidy is potentially another customer's greater-than-market price. With choices among alternative suppliers, a customer will usually find a way to undercut such prices.
This does not mean that revenues from the power system cannot be used to address non-market purposes. If, for example, the Bonneville Power Administration is allowed to charge market prices, and those prices exceed costs, the net revenues can be used for whatever purposes are deemed appropriate – a rebate to customers, low-income services or other purposes. But delivering the dividend in the form of subsidized prices puts the subsidizer at a competitive disadvantage and sends an inefficient price signal as well.
3-E. The Transition Matters
The transition to competitive markets will be neither instantaneous nor easy. Much of the difficulty of the transition has to do with reconciling the consequences of past decisions, made in an era of regulated monopolies, with the new competitive market. Competition has much to offer in the form of lower costs and better products and services. However, it will be difficult to make the transition if some groups – investors or customer groups – believe they would be made worse off because of competition. In addition, the timing of the transition for various customer groups will be important. For example, with an unstructured transition, large industrial customers will likely gain access to lower market prices sooner than individual residential customers.
The debate about this transition has focused primarily on the issue of stranded investment. Stranded investment is investment that cannot be fully recovered at competitive market prices. Most, but possibly not all, of that investment is in generating resources. If some customers can purchase electricity from the competitive market, instead of from their historic supplier, they may "strand" their "share" of the unrecoverable portion of the utility's investment, leaving it with those customers who don't have access to alternative suppliers, with the utility's investors or both.
Stranded investment could occur at the wholesale level, as a result of open transmission access, or at the retail level as a result of opening up retail competition. Even without actual retail wheeling, the special accommodations that are likely to be made for large customers who can threaten to leave the system can effectively strand costs on customers with less market power.
The stranded investment issue tends to generate a great deal of heat and not very much light. Customers who think they can take advantage of the competitive market brand suggestions for some kind of stranded cost recovery as "anti-competitive." Customers who believe they will have less ability to take advantage of the market fear they will have to pay an unfair share of stranded investments. Utility stockholders, arguing that investments were made in good faith expectation of continued utility monopoly and obligation to serve, see failure to provide for stranded investment recovery as unfair to them.
The challenge is to get beyond these polarized positions to a competitive market. Some observations that may help move the debate:
- The amount of potentially stranded generation investment depends on the difference between the cost of existing generation and the market price. In the Northwest, the amount of stranded generation investment is presently thought to be small relative to other parts of the country.
- The amount of stranded investment cannot be figured on an individual resource basis, but rather on the basis of an owner's entire system. Where utilities have been averaging the cost of their high-cost and low-cost resources in determining their regulated rates, stranded investment must be determined on the same basis. One cannot just pick out the high-cost resources and recover stranded investment for those resources, while at the same time receiving market prices for (and making windfall profits from) existing low-cost resources.
- Any stranded investment recovery mechanism should build in incentives to minimize stranded investments. For example, if owners must share in the stranded investment, there is an incentive to work hard to minimize stranded investments. Similarly, stranded investment recovery should not reward inefficient operation. Recovering fixed costs is necessary to some degree. Subsidizing above-market operating costs is neither prudent nor necessary.
- It is difficult to make an argument that all stranded investments should be recovered from customers (although that is what the Federal Energy Regulatory Commission has recommended for wholesale stranded investments). [Bradford, Peter, "A Regulatory Compact Worthy of the Name," The Electricity Journal, November 1995, pp 12-15.] The decisions made in a regulated monopoly environment were perceived to have relatively low risk, but certainly not zero risk. Stranded investment recovery should be shared between customers and investors. The fact that Bonneville does not have investors in the usual sense makes this more difficult, but not necessarily impossible.
- Virtually every electricity industry restructuring process in this country has recommended some level of stranded investment recovery. It is the norm, not the exception.
It should also be recognized that there is a flip side to stranded investment. Stranded investment occurs when total costs are greater than market prices. But for many utilities in this region, existing system costs are well below market prices or could be in a few years. The transition to competitive markets and market prices means that unless some provision is made for existing customers to share in the return, the benefits will all go to investors – a windfall profit. Stranded investment recovery is based on the principle of equity. Investors who received a near-certain, but low rate of return in the regulated environment may be entitled to some level of stranded investment recovery. If existing customers are also to be treated equitably, they are also entitled to some share of the windfall profits. They, after all, helped pay for the below-market resources and accepted the risks associated with those resources. [Cearley, Reed and Lance McKinzie, "The Economics of Stranded Investment — a Two-Way Street," The Electricity Journal, November 1995, pp. 16-23.]
Fourth Power Plan
posted Apr 16, 2013
- 2-A. Competition in Electricity Markets
- 2-B. Restructuring of the Natural Gas Industry
- 2-C. Gas Turbine Technology
The Northwest's electric power industry is constantly evolving. That is nothing new. However, the pace of that evolution is new – a pace many believe is more rapid than at any time in memory. What has been a regulated monopoly, is increasingly becoming a competitive market. The three interacting factors driving change in the electric utility industry are:
- Wholesale electricity markets have become competitive due to regulatory changes that opened the industry to new players. This opening of the wholesale market, combined with lower overall prices for new sources of electricity, has resulted in significant pressure to open retail markets to competition as well.
- The availability of adequate supplies of low-cost natural gas has driven down the marginal cost of new generating resources. In addition, low gas prices have made it economical to operate at very low costs older gas-fired generating plants already in the West Coast system. This has created an abundance of low-cost electricity in the West.
- Finally, gas turbine technology has improved, resulting in a low-cost, efficient resource that can be built quickly and in relatively small increments to meet growing loads. This has significantly lowered the barriers to entering the power generation business, thus contributing to increased competition.
2-A. Competition in Electricity Markets
Probably no change is more important to the electricity industry and, by inference, to this draft power plan and the goals of the Northwest Power Act, than the evolution toward open competition among electricity producers and distributors. The principal benefits of opening an industry to the pressures of competition are to bring down prices and increase customer influence over the variety, quality and price of services the industry delivers. That has been the clear goal of the federal government's restructuring of both the natural gas and telecommunications industries. It is also the goal of restructuring in the electricity industry. A key lesson of restructuring in other industries is that how restructuring occurs and how regulation changes to accommodate increased competition are important.
The Traditional Regulatory Environment
The electric utility industry, until relatively recently, was made up of regulated monopolies – businesses that were, to a large extent, protected from competition. There was always some competition between electricity and competing fuels for such applications as heating and industrial processes, and even competition among electric utilities to attract new loads. But, historically, there was little competition from non-utility generators of electricity, and almost no one competed to sell electricity within a utility's service territory. The utility's franchise was protected.
The traditional regulatory environment reflected the realities of the industry as it existed years ago. It was an industry that required the construction of large, capital-intensive power plants and the rapid expansion of transmission and distribution systems. The regulatory system that evolved was a cost-based system that offered utilities the financial stability associated with a protected customer base. In return, utilities accepted an obligation to serve all customers in their service territory and regulation that prevents the exercise of monopoly power in the prices they charge. This regulatory framework generally holds true today for both the investor-owned utilities, which are regulated by state utility commissions, and the local public utilities, which are regulated by locally elected boards or commissions.
In the Pacific Northwest, the Bonneville Power Administration is a special case in that it is a federal marketer of wholesale power. Bonneville sells the electricity generated at federal Columbia River hydroelectric dams and one nuclear plant, the Washington Public Power Supply System's WNP-2, to retail utilities and to some industrial and government customers that are served directly rather than through utilities. The federal power marketer is required by law to sell to its public agency customers at cost. Because Bonneville markets the power generated at the federal Columbia River dams, those costs were, until recently, well below the cost of alternative power supplies. This meant Bonneville had a secure market for its inexpensive electricity. Furthermore, most of Bonneville's customers are "full requirements" customers, that is, Bonneville supplies all their power needs.
Regulatory Policy – Wholesale Competition
In 1978, the utility industry's near-monopoly on power generation began to crumble. Congress passed the Public Utility Regulatory Policies Act (PURPA) to promote renewable resources and cogeneration and to reduce utility reliance on imported oil. PURPA created a class of non-utility generators that had the right to sell the output of their power plants to utilities at the price the utilities would have to pay to develop their own resources – their so-called "avoided cost." This was an attempt to mimic market-based economics, and it encouraged developers to compete to supply utility resources. While these provisions stimulated wholesale competition, the law was very specific in prohibiting these new producers from selling to retail customers.
The next major federal regulatory change occurred in the National Energy Policy Act of 1992 (EPAct). This legislation created a class of wholesale generators that are exempt from the legal and financial requirements of the Public Utilities Holding Company Act of 1935. Exempt wholesale generators have the ability to structure themselves any way they want, although they are still subject to rate-regulation by the Federal Energy Regulatory Commission when they sell their power in interstate commerce. The 1992 Act further eased entry into the wholesale generation business, but prohibited these exempt generators from making sales to retail customers.
The drafters of the 1992 legislation recognized that transmission access was a necessary condition for a fully competitive wholesale power market. If there is to be true competition in generation, generators need to have a way of getting their power to market under terms and conditions that do not discriminate among the owners of generating resources. EPAct gives the Federal Energy Regulatory Commission the ability to require owners of transmission systems to provide access to others wishing to use the transmission system. Again, the legislation was clear that it was addressing transmission access for wholesale transactions only, and that the Commission did not have the authority to require wheeling to retail customers.
In March 1995, the Commission released what has come to be known as the electricity "mega-NOPR" – its notice of proposed rulemaking implementing the open access provisions of EPAct. Although the rules are not yet final, they give a relatively clear picture of the Commission's intent. They require utilities under the Federal Energy Regulatory Commission's jurisdiction owning both generation and transmission to "unbundle" these functions – separating decisions about generation and transmission within the corporate structure and charging separately for these products.
The utilities are also to adopt transmission tariffs that guarantee "comparability," i.e., charges, terms and conditions for transmission services that are comparable to what the utility applies to itself for these services. The intent is to frustrate the ability of transmission owners to use their transmission to give their own resources an advantage.
The anticipated Federal Energy Regulatory Commission rules will also require establishment of sophisticated information networks that can provide real-time information on the availability and price of transmission capacity. Some industry observers have suggested that functional unbundling and requirements for comparability will not be sufficient to ensure non-discriminatory open transmission access, and that pressure will build for utilities to divest themselves of their transmission assets.
Opening access to the transmission system fosters the need for coordination in the planning and operation of regional transmission grids. The Commission has proposed the formation of regional transmission groups, composed of the users, suppliers and the state regulators of transmission in given regions, to coordinate the planning, expansion and operation of transmission capacity. Many utilities in the Northwest are members of the Western Regional Transmission Association (WRTA) and the Northwest Regional Transmission Association (NRTA).
The Federal Energy Regulatory Commission also indicated its intent to address what it perceives to be a transition issue that will have to be resolved – the so-called "stranded investment" problem. Wholesale stranded investments are those that were made to serve wholesale customers who then take advantage of open transmission access to get service from another supplier. If the investing utility cannot recover its investment from its remaining sales, that investment will be stranded.
There are few examples of potential wholesale stranded investments in the Pacific Northwest. One example could be the investment in the Washington Public Power Supply System nuclear power plants, two of which are uncompleted and have never produced power, and another that is operating, but which produces electricity at above the current market price. Fiscal Year 1995 operating costs of the Supply System's WNP-2 were about 3.5 cents per kilowatt-hour, which are higher than the cost of power from new gas-fired combustion turbines, and much higher than current wholesale power prices. The Supply System has set ambitious targets for reducing operating costs. It remains to be seen how successful they will be.
The financing of these plants was backed by the Bonneville Power Administration to meet what was then perceived to be the need for new resources to serve public agency and direct service customers. The capital costs of these plants were melded with Bonneville's low-cost hydropower, causing rates to climb by about 500 percent. Even so, until the advent of competitive pressures, Bonneville could recover its costs, and until recently, keep its rates below the avoided cost of new resources. However, Bonneville's ability to recover those costs fully in today's low-cost wholesale market and fully carry out its other public responsibilities is far from clear.
The changes in the wholesale market brought about by the forces described above have been dramatic. Independent power producers have become the important developers of new generation. More than 100 power marketers have been licensed by the Federal Energy Regulatory Commission. These marketers may not own any generating resources, but they can purchase supplies from a number of producers and put together packages of power products to meet the needs of their customers.
An active spot market has evolved, with spot prices at COB/NOB (the reference point for West Coast power transactions at the California/Oregon border and the Nevada/Oregon border) published daily in The Wall Street Journal. Some utilities have established power trading floors, and the New York Mercantile Exchange is moving toward establishing a futures market for electricity.
The most compelling effect of the competitive changes in the utility industry is that the market price of electricity has fallen. There is clear evidence from the results of various competitive bidding processes that competition among potential developers and marketers has driven down prices. To some extent, this is the consequence of surplus capacity on the West Coast that can be priced at the operating cost plus a small markup. In the past, that surplus capacity might not have entered the market because it was too expensive. Low gas prices and open transmission access are making that capacity a major factor in today's wholesale power market. Many of these developments parallel the experience in the restructured natural gas market.
The development of the wholesale electricity market has been particularly problematic for Bonneville. Because it is exclusively a wholesale utility, it is fully exposed to wholesale competition. Its heavy debt burden for nuclear plants, high operating costs on the one operating nuclear plant and increased costs of salmon recovery efforts are colliding with the falling prices in the wholesale market. The result is that many of Bonneville's direct service industrial and public agency customers are seeking or have obtained power from other suppliers.
In its 1996 Initial Rate Proposal, Bonneville appears to have been successful in putting together a competitive five-year rate proposal. To do so required extensive cost-cutting efforts and efforts to pare back or eliminate some of its other responsibilities. To many, the apparent conflict between Bonneville's public agency responsibilities and the requirements of the competitive market raise questions about Bonneville's continued existence in its historic form. This is discussed more fully in Chapter 7.
Retail Competition
The availability of low-cost power in the wholesale power market is creating pressure for retail competition, i.e., a situation in which individual factories, businesses and even homes might choose who generates their electricity and what power products they buy. Electricity would be distributed to consumers over the same power lines as serve them today, but one consumer might be served by one utility, while his or her neighbor might be served by a different utility, an independent power producer or a marketer. Many believe that the full benefits of a competitive industry will only be realized when retail customers have full access to power markets.
The authority to allow retail competition lies with state and local regulators – legislatures, state utility commissions and the governing bodies of consumer-owned utilities. Not surprisingly, the pressure for retail competition is greatest where retail rates are highest. California embarked on an ambitious effort to restructure its electricity industry to allow retail access first to large customers and then to all customers within a few years. Although not yet complete, it appears almost certain that some form of retail competition will come about in that state.
California is the most ambitious example of competitive restructuring, but there are other states in which retail competition is also being actively considered. Michigan has an experiment in retail wheeling under way. Massachusetts has recently adopted a goal of providing retail customers with the choice of suppliers. The state also adopted principles for the restructured industry and for the transition to it, and has set a schedule for implementation, as has Wisconsin. Rhode Island also has adopted a set of principles for industry restructuring.
While these examples are perhaps the most prominent, regulatory commissions and legislatures across the country are beginning to address the issue, even in areas that do not have particularly high rates. At least 12 states outside the Northwest are investigating the introduction of retail competition.
Given the relatively low electricity rates in the Northwest, this region would seem an unlikely place for pressures for retail access, but even small reductions in price for large customers can translate into significant monetary savings. As a result, some industrial customers in the Northwest are using their market power to obtain the benefits of low wholesale prices. These relatively few large customers are causing much of the electricity industry, even in the Northwest, to act as if retail access were a given.
Puget Sound Power and Light in Washington has customers that have been granted revised rate structures as a result of their attempt to get direct access to the power market through other suppliers. A major customer of Seattle City Light also has sought direct access to the power market. While these are the most public examples, it is likely there are numerous other instances in the region in which utilities and their customers are wrestling with the trade-offs between opening up retail access or making special rate accommodations to retain major customers. Two state utility commissions, Washington's and Montana's, have undertaken inquiries on competition, and the Washington commission has published "Guiding Principles for an Evolving Electricity Industry." [ Washington Utilities and Transportation Commission, "Guiding Principles for an Evolving Electricity Industry," Docket No. UE-940932, December 13, 1991.]
The effects of anticipation of competition are also evident. Utility efforts to "right-size" and cut costs are prevalent. Mergers and acquisitions are under way in the region and across the country, as utilities try to reduce costs through economies of scale and otherwise achieve competitive advantages. At least two major Northwest utilities have been public in expressing their concerns that they would face stranded investments if retail competition develops. Most utilities have expressed concerns about regulatory pressures to undertake conservation, renewable resource development and accommodation of environmental concerns that might raise their rates if their potential competitors – independent power producers, marketers and so on – are not subject to such pressures. They fear such rate increases will mean customers move to other suppliers.
2-B. Restructuring of the Natural Gas Industry
Changes in the natural gas market have been a major factor in the competitive evolution of the electricity industry. In fact, changes in the gas industry may have far more implications for the future of the electricity industry than any other recent development. Not only do low natural gas prices affect future demand for electricity and the cost and characteristics of electricity supply, but the development of a restructured natural gas commodity market may foreshadow similar changes for the electricity market.
In the early 1970s, natural gas was regulated from the wellhead to the end user. Consumers' gas needs were met by their local distribution company, much as electric utilities serve their customers' needs now. The local distribution company had its gas supplies delivered to the city gate by natural gas pipeline companies that acquired the gas supply, transported it to the city gate, and shaped it to meet demand.
Today, pipeline companies do not own or purchase any gas. They provide transportation and shaping services on an unbundled basis. Local distribution companies and many individual customers now purchase their own gas supplies, transportation, and other services as needed. There is now a fully developed natural gas commodity market. Financial instruments, such as natural gas futures, allow local distribution companies and customers to manage the risk of natural gas price fluctuations. A whole new industry of natural gas marketers now exists to help customers acquire gas supplies, transportation and other services on a bundled or separate basis to fit individual customer needs.
These dramatic changes occurred through a series of restructuring initiatives beginning with the Natural Gas Policy Act of 1978 and culminating in Federal Energy Regulatory Commission Order 636 in April 1992. (See Figure 2-1.) The regulatory changes gradually deregulated natural gas prices at the wellhead (Natural Gas Policy Act, 1978 and Natural Gas Wellhead Decontrol Act, 1989), opened up pipelines for use by anyone wanting to transport gas (FERC Order 436, 1985 and Order 500, 1987), and eliminated the purchase and sale of natural gas by pipeline companies (FERC Order 636, 1992). Order 636 also put into place pricing principles that provided incentives to utilize pipeline capacity more efficiently.
In April 1990, the New York Mercantile Exchange (NYMEX) began trading natural gas futures contracts, signaling the beginning of a complete natural gas commodity market. Finally, legislated restrictions on the use of natural gas for electricity generation contained in the Powerplant and Industrial Fuels Use Act were repealed.
Taken together, these changes have put into place the necessary elements for an economically efficient natural gas market. These elements include direct access to markets by both users and suppliers, a larger number of buyers and sellers participating in the market, proper pricing structures in the regulated portions of the industry, and price discovery and risk mitigation mechanisms provided by the spot and futures markets for the natural gas commodity.
The results have been dramatic decreases in natural gas prices and growing estimates of natural gas supply. Between 1983 and 1987, average wellhead real natural gas prices in the United States fell from $3.70 to $2.08 (both in January 1995 dollars), a drop of 44 percent. Since 1987, natural gas prices have averaged $1.89, while displaying price cycles that typify a competitive commodity market. Figure 2-1 illustrates natural gas price trends and restructuring actions over the past 24 years.
Figure 2-1. Restructuring benchmarks and natural gas prices

Until very recently, these lower price levels were considered unsustainable. Such low prices were not expected to garner sufficient new supplies of gas to meet growing demands. However, the establishment of a more competitive market has led to adoption of new technologies that have greatly increased the success, and reduced the cost, of natural gas exploration and development. In only 10 years, the estimates of ultimate potential gas resources have increased five fold. [For an excellent discussion of the changing views on oil and gas supplies see, William L. Fisher, "How Technology has Confounded U. S. Gas Resource Estimators," Oil and Gas Journal , Oct. 24, 1994, pp. 100-107.]
The theories and models of natural gas supply that were developed during the energy crisis of the 1970s and early 1980s have proven to be far too pessimistic. As a new understanding of the nature of natural gas supplies and markets is being developed, forecasts of future natural gas prices have been falling every year for the last dozen years. It is no longer conventional wisdom that natural resource prices will necessarily rise in real terms over time as those resources are produced. This change is reflected in the Council's forecasts of natural gas prices, described in Chapter 5.
Lower gas prices have meant that gas-fired steam generating plants, primarily used by California utilities to meet peaking needs, can now be run economically with gas. These existing generators are already available, they simply have not been used extensively in the past due to the high price of their fuel. The availability of low-cost gas for these plants has meant that the West Coast market has a significant amount of inexpensive electricity at its disposal right now. The extent of that market is described in Chapter 5.
2-C. Gas Turbine Technology
Changes in the structure of the gas industry coincided with improvements in gas-fired power plants. Gas turbine technology has benefited from military and aerospace research and development. This has resulted in improved efficiency and reliability. New gas-fired power plants also are smaller than conventional thermal power plants, so more of their components can be assembled in factories. This makes their onsite construction faster. These two effects combine to reduce their overall costs. In addition, natural gas-fired combined-cycle combustion turbines have greatly reduced local and global environmental impacts. Consequently, they are easier to permit and require less permitting lead time. The dramatic benefits of today's low-cost gas-fired generation and the key characteristics of a gasified coal plant, as described in the 1991 Power Plan, are compared in Table 2-1.
In addition to the direct effect of providing electricity that is inexpensive and less-polluting, the characteristics of gas-fired combustion turbines have also lowered the barriers for entry into the power generation business. It is no longer necessary to undertake the risks associated with very large, long lead time, capital-intensive generating resources to enter the generation business. Thus, one of the conditions for a competitive generation market – ease of market entry – is within reach.
Table 2-1. Marginal Resource Comparison: Draft Plan Compared to 1991 Power Plan
| Resource Characteristics | 1991 Plan Gasified Coal |
Draft Plan Gas-Fired Turbine |
Change |
| Size (MW Capacity of Typical Plant) | 420 | 228 | 46% Smaller |
| Lead Time (years) | 7 | 4 | 43% Shorter |
| Capital Cost ($/kW) | $2,520 | $684 | 73% Lower |
| Availability (%) | 80 | 92 | 15% Greater |
| Efficiency (%) | 36 | 47 | 30% Greater |
| Levelized Cost (cents/kwh) | 6 | 3 | 50% Lower |
| Particulates (T/GWh) | 0.07 | 0.03 | 57% Less |
| SO 2 (T/GWh) | 0.04 | 0.02 | 50% Less |
| NO X (T/GWh) | 0.50 | 0.07 | 85% Less |
| CO (T/GWh) | 0.02 | 0.02 | similar |
| CO 2 (T/GWh) | 985 | 497 | 50% Less |
Fourth Power Plan
posted Apr 16, 2013
- The Fourth Northwest Power Plan
- The Evolving Northwest Electricity Industry
- Capturing the Benefits of Competition
- The Existing Northwest Power System
- Forecasts and Resource Trends
- Resource Issues in Competitive Markets
- The Role of the Bonneville Power Administration
- The Role of the Northwest Power Planning Council
- Structuring the Competitive Marketplace
The electricity industry in the United States is in the midst of significant restructuring. This transformation will move the industry from the regulated monopoly structure of the past 50 years to a more competitive model.
There is much to be gained in this transition. Electricity consumers are already benefiting from competition in a number of significant ways. Competition in the natural gas industry has helped lower the cost of electricity from gas-fired generating plants. Competition among manufacturers and developers of combustion turbines has contributed to less expensive, more efficient, shorter lead time power plants. Broad competition in the electricity industry could result in lower prices for consumers and more choices about the sources, variety and quality of their electrical service. This is good news. The opportunities are great.
But, there are also risks inherent in the transition to more competitive electricity services. Merely declaring that a market is competitive will not necessarily achieve the full benefits of competition or ensure that they will be broadly shared. It is entirely possible to have deregulation without true competition. How competition is structured is important.
It is also important to recognize the limitations of competition. Competitive markets are about efficiency, not fairness or other social goals. To the extent that the citizens of the Northwest want their electricity system to deliver certain social benefits, such as low-cost electricity to rural areas or fish and wildlife recovery, special attention will be required to accomplish those goals during and after the industry's transition.
Similarly, markets are never perfect. For example, prices rarely reflect the environmental consequences of resource development and operation. Inadequate information and related market barriers also inhibit the market for energy efficiency. Again, if the citizens of the Northwest value environmental quality and energy efficiency, special care will be required to ensure that these values are upheld while the region captures the benefits of a more competitive electricity industry.
To seize the opportunities and moderate the risks inherent in the transition to competitive electricity markets, the governors of the four Northwest states convened a "Comprehensive Review of the Northwest Energy System." The governors appointed a broadly representative steering committee to study that system and make recommendations about its transformation. Each governor has also appointed a representative to make certain the public is educated about and involved in the Comprehensive Review.
In establishing the review, the governors stated:
"The goal of this review is to develop, through a public process, recommendations for changes in the institutional structure of the region's electric utility industry. These changes should be designed to protect the region's natural resources and distribute equitably the costs and benefits of a more competitive marketplace, while at the same time assuring the region of an adequate, efficient, economical and reliable power system."
This is not the first time the Northwest states and stakeholders within the region have come together to address the future of the region's power system and related issues critical to the economy and environment of the Northwest. For more than 15 years, Idaho, Montana, Oregon and Washington have worked cooperatively to protect the resources of the Columbia River Basin, which is the source of the region's vast hydroelectric system and its largest and most complex ecosystem.
Through the Northwest Power Act of 1980, these states formed a compact and established the Northwest Power Planning Council to help plan for the future of the power system, and inform and involve citizens of the region in the planning process. Congress and the four Northwest states identified and embraced a set of long-term goals in the Power Act:
- To achieve cost-effective conservation;
- To encourage the development of renewable energy resources;
- To establish a representative regional power planning process; and
- To assure the region of an adequate, efficient, economical and reliable power supply.
Since the creation of the Council, utilities, businesses, local governments and others in the region have saved more than 1,200 average megawatts of electricity, enough to power a city the size of Seattle. These savings cost utilities an average of 2 cents to 2.5 cents per kilowatt-hour. that's about half the cost of power from the lowest-cost new generating resources available at the time. The environmental benefits of foregoing new generating resources in favor of conservation have not been calculated, but it is likely that they are substantial.
The four states, utilities, local governments, businesses and citizens have also worked together to promote wind and geothermal demonstration power plants, which are now in various stages of development. These are accomplishments of which the Northwest can be proud. No other region in the nation has worked so successfully as a team to manage so vast and complex a resource as the Northwest power system.
The goals of the Northwest Power Act were the product of a different era, an era of regulated monopoly utilities and large, capital-intensive resources. Nonetheless, many of these goals are still relevant in the increasingly competitive utility world. The industry transformation could challenge or help further those goals, depending on how the transformation is structured and how successful the region is in fashioning mechanisms to achieve those goals.
The Fourth Northwest Power Plan
This Draft Fourth Northwest Conservation and Electric Power Plan was begun as fulfillment of the Power Act mandate to prepare and adopt "a regional conservation and electric power plan" and review that plan at least every five years. The Council's last plan was adopted in 1991.
The timing of this draft plan, in light of the governor's review, requires a different approach than that taken in previous Council power plans. Consequently, this draft contains few recommended actions or policy decisions. It is instead a reference tool, containing background on the industry and its current restructuring, as well as analysis of some of the major issues that must be addressed as the Northwest advances toward its new energy future. Because the Bonneville Power Administration, which markets about half the electricity generated in the Northwest, and the Council itself will be profoundly affected by the transformation of the industry, issues related to their futures are also explored.
The goal of this draft plan mirrors and supports the governors? goal in setting in motion the Comprehensive Review. The key issues and findings are summarized in the following pages.
The Evolving Northwest Electricity Industry
The electricity industry in the Northwest is evolving rapidly in the direction of increased competition. This trend is the product of the interaction of a number of developments. Prices for natural gas have fallen dramatically. And the technology of gas-fired electricity generation has been advanced to the degree that new combined-cycle gas power plants are relatively low-cost, flexible resources. These changes have broken down the financial barriers that once blocked entry into the electricity generation business.
These forces have been amplified by important policy changes at federal and state levels. Federal policies encouraging competition in generation began with the Public Utilities Regulatory Policy Act of 1978 (PURPA) and have been advanced by the National Energy Policy Act of 1992. The Federal Energy Regulatory Commission is in the process of adopting new rules to ensure competitive wholesale power markets. Progress toward competition at the retail level has been left to the states to determine and shape. In many states, the prospect of lower-cost power is driving consumers of large amounts of electricity to seek access to the competitive market or at least to market prices.
While rates in the Northwest are generally lower than elsewhere in the country, the pressure for retail competition is evident here as well. The Bonneville Power Administration, which markets electricity from the federal power system, is a power wholesaler and, as such, is already fully exposed to competition. Bonneville's size and importance in the regional power system mean that wholesale competition will have dramatic effects in the Pacific Northwest regardless of actions at the retail level. This plan reviews the evolution toward increased competition and the forces driving it in Chapter 2.
Capturing the Benefits of Competition
Competition in the electricity industry has been promoted because it is considered to be more effective than regulation in fostering improved productivity, greater innovation, increased choice and lower costs to consumers. However, while the Pacific Northwest could benefit greatly from more open competition in the utility industry, the region shouldn't assume that deregulation alone will ensure these benefits. Without a market structure that fosters effective competition, the industry could simply replace regulated monopolies with deregulated oligopolies -- where a few large companies have near-monopoly power.
There are generally recognized conditions that need to be met to foster effective competition. For example, an effective market requires an adequate number of sellers, and market access by buyers and sellers to ensure that no individual has the power to influence prices in the market. The Federal Energy Regulatory Commission (FERC) is pursuing policies intended to satisfy these conditions at least partially, by expanding access to electricity markets through transmission systems.
An effective market also requires that sellers cannot subsidize their competitive position by shifting costs to customers in a monopoly part of their business. This condition could be met by separating companies into their competitive and monopoly components.
Even if effective competition is achieved in the utility industry, market imperfections and other barriers could keep the industry from functioning efficiently. For example, if environmental costs and benefits are not taken into account, the utility industry will fall short of environmental goals. Other market barriers can limit the amount of energy conservation that is secured. Consequently, continued attention to market imperfections may still be required even in competitive markets.
There are also some things that competitive markets simply can't do. In the Northwest, for example the utility system supports social goals, such as economic development in remote rural areas or promotion of irrigated agriculture, generally by offering lower rates for these purposes. In a competitive electricity market, it may be difficult to include the costs of providing low rates to some in the prices charged to others. If supporting such social goals is to continue, new avenues and sources for the support may need to be identified.
Finally, how the transition from the regulated utility industry to a more competitive market is structured is critical. The transition requires reconciling decisions and actions made in the regulated environment with the new realities of competition.
Stranded investment -- the inability to recover the full costs of past utility decisions at current market prices -- is the most contentious issue in this area. While stranded investment in this region is small compared to other regions, it may still be an issue. Where legitimate stranded costs exist, the allocation of those costs between utility stockholders and utility customers will need to be negotiated.
For some Northwest utilities with existing low-cost resources, the ability to charge market prices could lead to windfall profits. These gains also need to be divided between investors and consumers. The Council offers some guiding principles and cautions for a competitive electricity industry in Chapter 3.
The Existing Northwest Power System
The foundation for the transition to more competitive electricity markets is the existing regional power system. This system is still dominated by hydroelectric power. Today, hydropower accounts for about 66 percent of the region's annual electricity supply. Since the Council's 1991 Power Plan, the region added 2,470 average megawatts of generating resources and conservation. Natural gas accounted for 57 percent of these additions, while conservation made up 21 percent of the new resources. Renewable resources, largely small hydropower and some biomass, accounted for about 17 percent of the additions. The preponderance of natural gas-fired resources in the recent additions to the system has raised concerns, but overall, the power system today embodies more resource diversity than did the system of 1991.
During the same period, the region also lost some electricity resources. The closure of the Trojan nuclear plant decreased energy supplies by about 725 average megawatts.
In addition, changes in how the hydropower system is operated, designed to protect endangered salmon and other fish and wildlife, have reduced the annual firm energy capability and limited the flexibility of the system to meet seasonal and hourly variations in electricity loads. The fish and wildlife protections reduced the firm energy capability of the region's hydroelectric system by about 850 average megawatts. The availability of low-cost electricity from the Southwest has helped the region offset the loss of energy from the increased flows for fish. This draft plan devotes Chapter 4 to a description of existing regional energy resources.
Forecasts and Resource Trends
The opportunities and risks inherent in the transition to a more competitive Northwest electricity industry must be analyzed in the context of certain key factors. These include: future electricity use, the price and availability of natural gas, the amount of and cost of electricity in the West Coast power market, the availability and cost of new resources, and uncertainties regarding the Northwest hydroelectric system.
In the midst of the changes in the electricity industry, growth of the region's economy and the reliance of that economy on affordable and reliable electricity continue. Because future economic growth and electricity requirements are inherently uncertain, the Council prepares a range of economic and demand forecasts rather than a single point prediction. The mid-range of that forecast anticipates electricity use will grow by 1.3 percent per year, or approximately 280 average megawatts annually. This figure reflects an expectation that the region will experience relatively stable and even slightly declining electricity prices in real dollar terms as a result of lower gas prices and transactions on the West Coast power market.
Future gas prices are a major factor in the demand for electricity and the cost of the options to supply that demand. The emergence of a competitive natural gas market has resulted in declining prices and the expectation of ample supplies at comparatively low prices for the future. Again, because future gas prices are uncertain, the Council prepares a range of forecasts intended to encompass that uncertainty. The mid-range forecast suggests a real growth rate of 0.4 percent per year for residential and commercial gas prices, 1.1 percent for industrial use and 1.6 percent for electric generation. The lower end of the forecast range reflects expectations that future gas prices may be constant in real terms or even decline slightly.
Falling natural gas prices, the opening of transmission access and the availability of substantial excess generating capacity in California and the Southwest have combined to create a vigorous West Coast market for electricity. The availability of relatively low-cost power in this market makes it an attractive alternative to the Northwest's meeting demand growth entirely with the construction of new resources.
The Council's analysis finds that the West Coast market is likely to have substantial supplies of electricity costing around 2 cents per kilowatt-hour well into the next decade. Taking into account transmission constraints, if the Northwest were to rely on that market for as much as 3,000 annual average megawatts, the future cost of electricity to the region could be reduced by an average of $3 billion, compared to a strategy of building new resources to meet Northwest load. [These present value savings include estimates of costs and benefits that accrue beyond the 20-year planning horizon because many of these resources have lifetimes that extend beyond 2015. See Appendix H for more detail.] The level of reliance on the West Coast market would be considerably greater than 3,000 average megawatts in some months and much less in others.
When new generating resources are required, the Northwest has numerous options. Natural gas-fired combined-cycle combustion turbines are the most likely choice. The Council estimates there are sites available that are capable of supporting an additional 7,400 megawatts of gas-fired capacity. These sites could supply 6,800 average megawatts of energy at costs of 2.7 to 3.3 cents per kilowatt-hour under the medium gas-price forecast.
The other generating alternatives analyzed in this draft plan include industrial cogeneration, coal-fired generation, forest thinning residue-fired generation, geothermal, wind, hydropower, land-fill gas recovery, mixed wood residue burning, nuclear and solar. Currently, there are few generating alternatives that are cost-competitive with combined-cycle combustion turbines -- only some industrial cogeneration, small amounts of new hydropower and a few biomass applications. However, there is a significant amount of cost-competitive conservation available. In the long run, coal-fired generation, some additional hydropower and biomass, wind generation at good sites and fuel cells are expected to become competitive. Gas-fired combined-cycle plants maintain their cost advantage even if a small carbon tax is assessed. If a large carbon tax is implemented, non-fossil fuel burning resources become cost-effective.
The region continues to face uncertainty with respect to the degree to which the operation of the hydropower system might be further constrained to protect fish or wildlife. The Council analyzed three alternative hydropower operations in comparison to the current system operation. Depending on the alternative, the capability of the hydropower system could be increased somewhat or it could experience substantial further losses in energy and capacity.
These changes are uncertain. There is no way to be certain if, when and to what extent new fishery recovery measures might be implemented. The important question is whether the region would make different resource choices in the near term in the face of this uncertainty. The Council believes the answer is no. The flexibility of the resource choices available to the region are such that, given sufficient lead time, the power system could adapt. However, some hydropower system changes could come at a significant cost. These issues are analyzed in Chapter 5.
Resource Issues in Competitive Markets
The advent of competitive electricity markets raises new issues with respect to the development of conservation, renewable resources and the consideration of environmental costs and benefits. These issues are explored in detail in Chapter 6 and described in the following paragraphs.
Cost-Effective Conservation
An objective of the Northwest Power Act is "to achieve cost-effective energy conservation." Despite the region's success in conservation development, significant cost-effective energy savings remain. This plan identifies 1,535 average megawatts of electricity savings that could be obtained over the next 20 years at an average levelized cost of 1.7 cents per kilowatt-hour. These savings are equivalent to the electricity generated by seven typical combustion-turbine power plants, and on average, they cost about two-thirds as much.
If this conservation is developed, the region's consumers would save $2.3 billion on their future electricity bills. [ These present value savings are estimated as explained earlier and in Appendix H.] Consumers on their own will make some of the efficiency improvements identified in this plan. The region's utilities have indicated they will secure more. Together, consumers and utilities in the region will probably capture about a third of the available and cost-effective savings over the next 20 years. But, unless the remaining two-thirds of the savings are secured, the region will pay $1.7 billion more in power system costs and natural resource impacts than it needs to.
There are significant uncertainties inherent in any long-term look at the benefits of conservation. In addition to evaluating the conservation over a wide range of demand and fuel price forecasts, the Council looked at a wide range of alternative scenarios to determine how robust conservation's value was to the region. These scenarios included a reduction in the estimate of the available conservation, a dramatic improvement in the cost of generating technologies, and the sudden loss of 3,000 average megawatts of load. In the worst case, the value of conservation dropped as low as $830 million.
On the other hand, there is the risk that growing scientific evidence that global climate change is occurring could result in the imposition of measures to reduce emissions of carbon dioxide and other greenhouse gases thought to contribute to this climate change. If a carbon tax between $10 and $40 per ton of carbon dioxide were implemented in 2005, the value of the conservation would grow to between $3.2 and $6.1 billion.
In even extreme scenarios, the development of further cost-effective conservation is a positive long-term investment for the region. In the shorter term, however, conservation requires that the region incur somewhat higher costs today compared to buying electricity off the West Coast market. For conservation to be successfully developed in the future, the near-term costs must be weighed against its longer-term benefits.
Bonneville and the region's utilities have been the dominant forces behind the success of conservation efforts in the past. However, their role is changing because competitive pressures are making some utilities reluctant to spend money on conservation programs when some of their competitors do not make such investments. As a result, utilities will be unable to secure all the remaining conservation that is cost-effective.
Consumers are expected to save some electricity on their own, but there are significant market barriers that will likely limit this activity. Most Northwest utility resource plans include significant amounts of conservation acquisitions over at least the next four years. As a result, the region has some time to think through potential actions that might be appropriate for the long run.
In light of the potential benefits that may be at risk, the Council suggests that the Comprehensive Review and the states evaluate the costs and benefits of potential mechanisms to acquire conservation beyond what will naturally be developed in the market. The goal should be a competitive market that preserves as much of the conservation benefit as possible.
Some options include: waiting during this transition period to see what happens in the market; instituting a system benefits charge similar to the charge on phone bills that pays for the 911 emergency line; granting utilities distribution monopolies only if they offer conservation opportunities to their customers; or requiring that a certain amount of load growth be met by conservation. The last suggestion would result in efficiency trading, similar to emissions trading, which is already in practice in the electricity industry. Important qualifications for any mechanism are:
- That it be competitively neutral and not interfere with the market pricing of electricity;
- That it complement the emergence of competitive markets for energy-efficiency services;
- That it provide some symmetry between who pays and who benefits;
- That it be administratively efficient;
- That it use competitive mechanisms to the greatest extent possible; and
- That it incorporate mechanisms to ensure performance.
Renewable energy projects -- those powered by the sun, wind, biomass, water and geothermal energy sources -- are valued because they have generally favorable environmental characteristics, they offer diversity and flexibility, and they help ensure the long-term sustainability of the power system. An objective of the Northwest Power Act is "to encourage the development of renewable energy resources within the Pacific Northwest."
Renewable projects producing more than 420 average megawatts of energy have been developed since the 1991 Power Plan. These were primarily hydropower and biomass resources. This represents about 17 percent of all resources developed during this period.
Encouraging progress has also been made on the renewable resource confirmation agenda of the 1991 Power Plan. The confirmation agenda incorporates research, demonstration and development activities necessary to test renewable resources under Northwest climate conditions. However, declining wholesale electricity prices have resulted in near-cessation of the development of additional generating resources. This is consistent with the surplus of generating capacity on the Western electrical system, but it raises the question as to what type and level of renewables activity, if any, is desirable in this environment.
Analysis presented in Chapter 6 shows that, for the reasons noted above, few renewable resources are cost-effective in the near term. Even over the long-term, the large inventory of undeveloped renewable resources available to the Northwest has little expected economic value. However, the potential value of these resources would increase substantially if mitigation of carbon dioxide production were required to control global climate change. Such controls could raise the cost of competing resources.
But, even if carbon dioxide controls were needed in the future, there appears to be little economic value in developing renewables in advance of need and cost-effectiveness. Such projects would require a substantial cost premium, they preclude the benefits of later technological development and are unlikely to produce significant economic benefit. This finding holds even with consideration of uncertain fuel prices, water conditions, demand growth and with adoption of relatively high carbon taxes.
Renewable resources are unlikely to be selected by utilities in a competitive market in the near term because they are not cost-competitive. However, key development and demonstration activities conducted now will help the region integrate such resources into the power system in the future.
Based on this analysis, a renewable resource strategy for the Northwest should focus on:
- Ensuring that the restructured electric power industry provides equitable opportunities for the development of cost-effective renewable resource projects;
- Ensuring that the renewable resource potential of the Northwest is adequately defined and that prime undeveloped renewable resources remain available for future development. This will require completion of key demonstration projects and additional resource assessment activities that are already under way;
- Supporting research and development efforts to improve renewable technology;
- Offering green power purchase opportunities; and
- Monitoring fuel prices, the global climate change issue and other factors that might influence the value of renewable resources. More aggressive preparation for the development of renewables could be initiated if changes in these factors indicate that accelerated development of renewables is desirable.
The Northwest Power Act requires quantifiable environmental costs and benefits of the power system be taken into account. While there are a number of these costs, for this draft plan, the Council has focused on the implications of possible global climate change.
There is increasing scientific concern that global climate change may be caused by emissions of greenhouse gases, most notably carbon dioxide. Carbon dioxide is produced in large quantities by power plants (and other energy equipment) that burn fossil fuels. Global climate change is a particularly difficult issue to address in power planning for several reasons. First, while the uncertainty regarding global climate change is narrowing, there remain questions regarding the existence, causes and magnitude of that climate change. The consequences of global climate change are also not well understood.
Second, global climate change is largely "external" to the Northwest. While the Northwest would experience the effects of any climate change that occurs, actions taken unilaterally by the region could not, in and of themselves, significantly affect the degree of climate change experienced by the region. Third, because of the large hydroelectric resources of the Northwest, the electric utility industry is not the most significant producer of greenhouse gases in the Northwest. Reductions in greenhouse gases might be accomplished at less expense in other sectors of the economy or in other parts of the world.
Still, the possibility that emissions of greenhouse gases might someday need to be controlled poses a financial risk. For example, a carbon tax could significantly increase the cost of electricity from fossil fuel power plants. If the type, magnitude and timing of possible carbon dioxide regulations were better known, certain near-term resource choices or, alternatively, investing in carbon offsets (e.g., tree planting) might be good hedges against carbon regulation. However, because of the lack of sufficient information, the Council cannot evaluate strategic responses to global climate change with the level of sophistication that it can bring to, for example, gas price uncertainties or future electricity requirements of the region.
Instead, however, the Council estimated the potential impacts of carbon dioxide control measures on the overall cost of providing electricity to the region, as well as on the relative costs of alternative resources. A range of possible carbon tax rates was used to represent the cost of carbon dioxide control measures. A carbon tax would raise the Northwest's total electricity bill and increase the value of energy-efficiency improvements, renewable resources and nuclear power plants. The value of efficient natural gas-fired resources would also increase relative to other fossil-fuel resources.
Until the uncertainty regarding climate change is resolved by scientific consensus, and national and international policies respond to that consensus, the region can reduce its exposure to risk by:
- Avoiding investments in generating resources that are heavy emitters of greenhouse gases;
- Securing cost-effective conservation;
- Gaining experience with measures to offset greenhouse gas emissions, such as reforestation; and
- Considering the carbon dioxide offset value of the region's only operating nuclear plant.
The Role of the Bonneville Power Administration
The transition to a competitive electricity industry raises many issues for the Bonneville Power Administration. The reasons for this are several. First, as a wholesale utility, competition is already here for Bonneville and will probably become more intense. Second, Bonneville markets the output of a public resource, the Federal Columbia River Power System. Third, Bonneville plays an extremely large role in both generation and transmission in the region. And fourth, Bonneville is responsible for a number of public purposes besides power production, including discounts for rural customers, energy-efficiency programs, fish and wildlife recovery, and research and development.
As the region thinks about the role of Bonneville in a more competitive power industry, the questions raised by the principles for effective competition (in Chapter 3) must be asked and answered for Bonneville, just as for any other actor in the market. Does Bonneville have undue market power in transmission or generation? If so, how is that market power most effectively mitigated? More fundamentally, what is the appropriate role for a federal agency in a competitive market? Can it be a full competitor or must its role be somehow limited? Are there alternatives for ownership of Bonneville's assets or marketing rights that might be preferable, and, if so, what are some of the key issues that must be resolved? How should the benefits and risks of the system be allocated? How should the products of the system be marketed and priced? And how should the public purposes currently carried out by Bonneville be fulfilled? None of these questions has easy or clear answers.
Many argue that the Bonneville Power Administration, as currently configured, violates several of the principles for a competitive electricity market. It combines generation and transmission in one entity. It has substantial market power. It is not in a good position to deal with market risk. And it carries out several public purposes that may be difficult to support in a competitive wholesale power market, at least in the ways they have been supported in the past. At the same time, Bonneville is at the heart of the regional power system and embodies many of the values of the region.
Deciding the future role of Bonneville is a key task of the Comprehensive Review. A successful resolution of Bonneville's role is necessary to set the stage for an efficient and competitive regional power system that maintains the benefits of the Federal Columbia River Power System for the Northwest. Some of these considerations are explored in more detail in Chapter 7.
The Role of the Northwest Power Planning Council
Just as the role of the Bonneville Power Administration may be different in the future, the role of the Council in power planning is also in question. The Council's role of establishing a power plan to guide the resource acquisitions of the Bonneville Power Administration is moot if Bonneville is no longer acquiring resources. More generally, the role of a long-term regional power plan in an open market environment is questionable.
The Council's planning responsibilities were not intended as an end in themselves. These were intended to serve the overall purposes of the Northwest Power Act:
- To encourage conservation and efficiency in the use of electric power;
- To encourage the development of renewable resources;
- To assure the Pacific Northwest an adequate, efficient, economical, and reliable power supply;
- To provide for the participation and consultation of the states; local governments, consumers, customers, users of the Columbia River system and the public at large in:
- the development of regional plans and programs related to energy conservation, renewable resources, other resources, and protecting, mitigating and enhancing fish and wildlife resources;
- facilitating the orderly planning of the region's power system;
- providing environmental quality; and
- to protect, mitigate and enhance the fish and wildlife, and their habitat, of the Columbia River Basin. [ 16 USC ?839 (1)-(6).]
Through the Comprehensive Review, the region will be re-evaluating many of these goals and identifying mechanisms that can accomplish many of the key goals in a new utility context. A number of activities that the Council currently carries out in the course of developing and encouraging the implementation of its plans could be useful to the region, both during the transition to a more competitive utility industry and beyond. These activities include:
- Providing up-to-date information on future electricity demands, new generating and efficiency technologies, system operations and market forecasts;
- Serving as a broker for information exchange among utilities and others;
- Working at federal and state levels to resolve legal and institutional barriers to accomplishing regional goals;
- Providing impartial analysis of issues with a long-term regional perspective;
- Serving as a focus for analysis of the interactions between power and fish;
- Representing the interests of states and the public in power issues; and
- Being a regional convener of forums to resolve issues.
The restructuring of the Northwest's electricity industry may result in new roles that are appropriate for the Council. On the other hand, some of the existing and potential new roles might also be performed by others. There may still be a need for strategic thinking about the directions the electricity industry might take and the implications for the region. The Comprehensive Review will need to explore these and other possible Council roles. This draft plan elaborates on this question inChapter 8.
Structuring the Competitive Marketplace
This draft power plan is long on analysis and short on conclusions. That is deliberate. It is designed to provide supporting information and analysis for the Comprehensive Review of the Northwest Energy System that was inaugurated in January 1996 by the governors of Idaho, Montana, Oregon and Washington. If this draft plan offers any advice, it is this: a deregulated electricity industry will not automatically deliver benefits to all consumers. Deregulation without attention to how competition is structured will not secure the low-cost and reliable electricity that has long been a mainstay of the Northwest's economy. Nor will competition necessarily secure the societal and environmental values this region has come to expect from its power system.
To achieve the full benefits of a competitive electricity market -- lower power costs, innovation in both services and technologies, more choices for consumers, and attention to societal and environmental values -- the Northwest will need to design its own structure for that market. No region in this country is more capable of doing that than the Pacific Northwest.
Report of Independent Auditors in accordance with OMB Circular A-133 and Financial Statements
posted Apr 16, 2013
See attached Moss-Adams audit which concluded September 30, 2012.
Preventing an Invasion: Building a Regional Defense against Quagga and Zebra Mussels
posted Apr 16, 2013
Revised Fourth Northwest Conservation and Electric Power Plan
posted Apr 15, 2013
(also see 6th and 5th Power Plans)
Background
In March 1996, the Northwest Power Planning Council released for public comment the Draft Fourth Northwest Conservation and Electric Power Plan. Comment on that draft was held open through 1996, while the Comprehensive Review of the Northwest Energy System was conducted. This Addendum to the draft power plan updates information that has changed since the release of the draft plan, incorporates recommendations from the Comprehensive Review Steering Committee and suggests ways to implement those recommendations. The Council will take public comment on this Addendum through October 31, 1997. Hearings are being scheduled in all four Northwest states, and consultations on the Addendum will be held as needed.
The Draft Fourth Northwest Power Plan describes the changing electricity industry, analyzes some of the consequences of the more competitive power market that is emerging, and suggests some alternative strategies the Northwest may adopt in response to industry changes. No changes have been made to that draft; all updating and comments have been incorporated into the Addendum.
Chapter 1: Executive Summary
- The Fourth Northwest Power Plan
- The Evolving Northwest Electricity Industry
- Capturing the Benefits of Competition
- The Existing Northwest Power System
- Forecasts and Resource Trends
- Resource Issues in Competitive Markets
- The Role of the Bonneville Power Administration
- The Future Role of the Northwest Power Planning Council
- Structuring the Competitive Marketplace
Chapter 2: The Evolving Northwest Electricity Industry
- 2-A. Competition in Electricity Markets
- 2-B. Restructuring of the Natural Gas Industry
- 2-C. Gas Turbine Technology
Chapter 3: Capturing the Benefits of Competition
- 3-A. Benefits of Competition
- 3-B. Principles for a Competitive Electricity Market
- 3-C. Characteristics of Competitive Markets
- 3-D. Limitations of Competitive Markets
- 3-E. The Transition Matters
Chapter 4: The Existing Northwest Power System
- 4-A. Resources Added Since 1991
- 4-B. The Hydroelectric System
- 4-C. Other Generating Resources
- 4-D. Conservation
Chapter 5: Forecasts and Resource Trends
- 5-A. Growing Demand for Electricity
- 5-B. Natural Gas Price Forecasts
- 5-C. The Western Power Market
- 5-D. New Generating Resource Potential
- 5-E. Hydropower System Uncertainties
Chapter 6: Resource Issues in Competitive Markets
- 6-A. Cost-Effective Conservation
- Utilities and Conservation: A New Paradigm
- 6-B. A Renewable Energy Strategy
- Why People Support Renewables
- 6-C. Environmental Considerations
- International Response to the Climate Change Issue
Chapter 7: The Role of the Bonneville Power Administration
- 7-A. Alternatives for the Federal Columbia River Power System
- 7-B. Consistency with the Principles, Characteristics and Limitations of Competitive Markets
- 7-C. Allocation of Benefits
- 7-D. Public Purposes
- 7-E. Conclusions
Chapter 8: The Future Role of the Northwest Power Planning Council
- 8-A. Goals of the Northwest Power Act
- 8-B. The Council's Power Planning Innovations
- 8-C. The Future Role of the Council
Links to Related Materials and Sites
1983 Northwest Conservation and Electric Power Plan
posted Apr 15, 2013
This report is also called the 1st Power Plan.
See our current power plan page for the most current plan, and history of previous plans.
- Plan (5.4mb PDF)
- Appendices (3.5mb PDF)
Introductory letter
To The People of the Pacific Northwest:
Three generations ago, the people of the region started building the largest hydropower system in the world. The resulting supply of low-cost power has contributed immeasurably to the quality of life and economic development in the Pacific Northwest. Now, the region must plan to meet future energy needs with conservation programs and resources that are 6 to 15 times more expensive than power from the existing dams. The challenge facing us is to support a strong growing economy while protecting our investment in the low-cost hydropower supply.
The Northwest Power Planning Council is charged with the responsibility of determining how much electric power the region will need and planning for the cheapest way to serve that need. The Congress directed the Council to complete the first regional conservation and electric power plan by April 28, 1983.
Adoption of this plan marks the beginning of the planning process, not the end. We now look forward to working with the citizens of the Northwest, Bonneville, and other federal agencies, utilities, state and local governments, Indian tribes, and businesses to ensure the successful implementation of this power plan and the Columbia River Basin Fish and Wildlife Program, which was adopted on November 15, 1982.
The Council is confident that the region can develop the resources needed to meet the region's
future needs for electricity at the lowest possible cost.
[Signed by Daniel Evans, Robert Saxvik, Charles Collins, Larry Mills, Keith COlbo, Alfred Hampson, Gerald Mueller, Roy Hemmingway]
1986 Northwest Conservation and Electric Power Plan
posted Apr 15, 2013
This report is also called the 1986 Northwest Power Plan, or 2nd Power Plan.
See our current power plan page for the most current plan, and history of previous plans.
- Volume 1 (6mb PDF)
- Volume 2 (7mb PDF)
- 1989 Supplement Volume 1, document 89-1 (2mb PDF)
- 1989 Supplement Volume 2, document 89-1 (8mb PDF)
Introductory letter
In December 1980, the U.S. Congress passed the Pacific Northwest Electric Power Planning and Conservation Act — Public Law 96-501 (referred to in this document as the Northwest Power Act or the Act). The Act made sweeping changes affecting the region’s electrical power system. Among the most important, it authorized the Northwest states of Idaho, Montana, Oregon and Washington to enter into an interstate compact for the purpose of long-range planning and protection of some specific shared resources. As a result of the Act, each of those four states passed enabling legislation to create the Northwest Power Planning Council in April of 1981. The states’ governors each appointed two members to the Council.
The Act required the Council to develop and adopt both a 20-year electrical power plan for the region and a program to protect, mitigate and enhance the fish and wildlife affected by hydroelectric development in the Columbia River Basin. The Act also instructed the Council to conduct these activities with broad-based public involvement.
The Council adopted the Columbia River Basin Fish and Wildlife Program in November 1982 and subsequently adopted an amended version in October 1984. The Council adopted its first Northwest Conservation and Electric Power Plan (the Northwest Power Plan or the plan) in April 1983. This document, the 1986 Northwest Conservation and Electric Power Plan, is the second 20-year power plan produced by the Council with extensive public involvement. It was adopted in January 1986 in compliance with the Northwest Power Act’s directive that the plan be reviewed and changed if necessary at a minimum of every five years.
This plan is more than an amended version of the first plan. Because of a number of significant and rapid changes in the Northwest electrical power picture and because of refinements in information availability and processing, the Council conducted a complete review of the power plan. This is essentially a new 20-year power plan and supersedes the 1983 Power Plan. However, the Columbia River Basin Fish and Wildlife Program, as amended, is incorporated as a part of this 1986 plan.
Unlike the 1983 plan, which set up a two-year planning cycle, the Council expects this 1986 plan to be in effect for a substantial period. The Council will report on the status of the regional economy and electrical needs every six months and will regularly monitor developments that affect resource availability. Sections of this plan will then be updated as needed.
1991 Northwest Conservation and Electric Power Plan
posted Apr 15, 2013
This report is also called the 1991 Northwest Power Plan, or 3rd Power Plan.
See our current power plan page for the most current plan, and history of previous plans.
- Volume 1 — 50-page summary (21mb PDF)
- Volume 2, Part 1, Chapters 1-7 (10mb PDF)
- Volume 2, Part 2, Chapters 8-end (15mb PDF)
Introductory letter
To the People of the Pacific Northwest:
These are pivotal times in the Pacific Northwest, urgent times. The region needs new supplies of electricity now, and this plan describes the most financially and environmentally sound means of acquiring them. It is a plan that calls on everyone in the Northwest to use electricity as efficiently as possible. It sets an agenda for a regional commitment to study and develop new energy producing technologies.
Throughout the 1980s, the Northwest had more electric power than it required. But we experienced such an economic rebound that we've exhausted that surplus.
That's why this plan is a call to action. In it, we outline a strategy designed to respond to a wide range of uncertainty. Between now and the year 2000, we are asking this region to lead the nation by securing at least 1,500 megawatts of conservation in our homes, farms, businesses and industries, as well as efficiency improvements to our power system. This will be an exciting challenge.
We are calling for exploration and demonstration of renewable resource technologies. And we seek answers to questions that have hobbled this region's ability to be decisive about our future use of thermal power plants.
While we were designing this plan, we were also mindful of the need to protect the Columbia River Basin's salmon, particularly those runs that have become the focus of possible declarations under the Endangered Species Act. Much of what we do in our society affects the salmon's survival, but there is no question that the dams we rely on for power are a major source of the problem. Changes in how the dams are operated-changes that could reduce the amount of electricity we can draw from the dams at certain times of the year-are one possible response to any salmon listing. We have already begun the process of amending our Columbia River Basin Fish and Wildlife Program to improve conditions for salmon.
If we are to continue to meet this region's electrical needs at the lowest possible cost — to rate payers, the environment and the Northwest's economy — we will need the cooperation of every Northwesterner. Now is the time to act. The power is yours; make the most of it.
[signed by James Goller, Ted Bottiger, Robert Saxvik, Tom Trulove, John Brenden, Angus Duncan, Stan Grace, Ted Hallock]
1982 Columbia River Basin Fish & Wildlife Program
posted Apr 15, 2013
To the People of the Pacific Northwest:
Three generations ago, when the Columbia River and its many tributaries ran free to the sea and fish and wildlife were plentiful, the people of our region were presented an unmatched opportunity. To the credit of their vision, skill and courage, they harnessed this mighty river system into a seemingly boundless supply of low-cost electricity. Thanks to their foresight, we have all benefited immensely.
But this achievement, like all great achievements, had a price. The development of the Columbia River System’s hydroelectric projects dramatically changed the natural fish and wildlife habitat, especially that of the prized Pacific salmon and steelhead. The fish runs were nearly destroyed, and it falls to this generation to rebuild the natural resources that flourished before we came.
The fish and wildlife program is an important step in this rebuilding. To use our region’s rivers as a continuing source of renewable energy while implementing this program requires a new sense of purpose. By tapping the ingenuity and commitment of our citizens, we can rebuild our damaged fishery and wildlife habitat. It is with this renewed sense of stewardship for our natural resource heritage that we have developed this program.
Columbia River Basin Fish and Wildlife Program — Strategy for Salmon
posted Apr 15, 2013
The Strategy for Salmon was published in 1992 and scanned for web access in 2006.
Volume 2 is divided into sections for faster downloading (but still be aware of some large file sizes).
Volume 1 (19mb PDF): Overview of the fish program
Volume 2: Measures, Conclusions, recommendations
Executive Summary (4.5mb PDF)
Section 1: Introduction (4.7mb PDF)
Section 2: Program Framework and Goal (3.2mb PDF)
Section 3: Juvenile Salmon Migration (9.9mb PDF)
Section 4: Adult Salmon Migration (1.5mb PDF)
Section 5: Salmon Harvest (3.6mb PDF)
Section 6: Coordinated Salmon Production and Habitat (14.7mb PDF)
Section 7: Coordinated Implementation, M&E (3.7mb PDF)
Section 8: Mitigation of Adverse Effects (900k PDF)
Appendices (3.8mb PDF)
1994/95 Columbia River Basin Fish and Wildlife Program
posted Apr 15, 2013
This report combines the Dec 1994 Program Amendments (document 94-55) and Sep 1995 Amendments (95-20).
1994 Program Amendments
All amendments or jump to sections:
- Introduction
- Systemwide goal and framework
- Coordinated implementation, research, monitoring and evaluation
- Salmon goal and framework
- Juvenile salmon migration
- Adult salmon migration
- Coordinated salmon production and habitat
- Salmon harvest
- Mitigation for adverse effects of salmon and steelhead measures
- Resident fish
- Wildlife
- Future hydroelectric development
- Amendment process
- Disclaimers
- Findings on the recommendations for amendments to the anadromous fish portions of the program
Appendices or separate files:
- Recommendations regarding habitat objectives and funding sources
- Summary of hydropower costs and impacts of the mainstem passage actions
- Assuring an adequate, efficient, economical and reliable power supply
- Staff analysis of biological benefits of mainstem passage actions
- Minority opinion
- Response to comments
1995 Program Amendments
All amendments or in sections:
Twenty Years of Progress: Columbia River Basin Fish and Wildlife Program
posted Apr 15, 2013

The Council's fish and wildlife program is the region's program. The Council's process is open to all interested parties. Decisions are made in public, and public comments are crucial in helping the Council shape the program.
Through the planning and implementing of the program, diverse interests from around the Columbia River Basin, from local landowners to state and federal agencies and Indian tribes, have the opportunity to identify and address problems affecting fish and wildlife and to build a mitigation program that is consistent with goals and legal requirements for production, harvest and restoration. By addressing the impacts of hydropower on all fish and wildlife of the basin, the program incorporates actions that benefit both Endangered Species Act-listed and nonlisted fish and wildlife.
Fish and wildlife recovery can be a contentious undertaking, but the collaborative nature of the Council's program development and implementation brings potential litigants to the same table and provides the opportunity to work through areas of disagreement in an open, public process. The result is a scientifically credible mitigation effort that enjoys broad political and public support and is unique in the nation.
Twenty Years of Progress: Columbia River Basin Fish and Wildlife Program
posted Apr 15, 2013
While the heart of the program is a set of actions to improve conditions for fish and wildlife, the program also recognizes that these efforts are based on scientific knowledge that is imperfect. Thus, the program directs funding toward improving scientific knowledge through research, monitoring and evaluation.

The program emphasizes monitoring and evaluation of project implementation to ensure that the effects of the actions are measured and analyzed. The results of this monitoring and evaluation will help the Council select the best projects to implement the program in the future.
Data management also is important. By investing in improved data management, the program supports the research, monitoring, and evaluation strategies by making the results readily available. Improved data management also will enhance public accountability of the program by making the results accessible not only to specialists, but also to the public at large.
Research and evaluation expenditures through the program since 1982 total more than $200 million.
Twenty Years of Progress: Columbia River Basin Fish and Wildlife Program
posted Apr 15, 2013

While salmon and steelhead harvests are regulated by state fish and wildlife agencies and the federal court, the Council has addressed the impacts of harvest on weak salmon and steelhead populations. The Council proposed that harvest be reduced in order to protect weak stocks, which mix with more abundant stocks in the Columbia River.
To protect these stocks from overharvest and to provide fisheries at the same time, the program directs funding to an experimental program in the lower Columbia River in which salmon are raised in net pens in bays and sloughs. The fish are released from the pens and return to the bays and sloughs as adults, where they are harvested. This reduces fishing pressure in the main Columbia River, allowing the more depleted stocks to pass by on their way to spawning areas upstream. The program also paid for experiments with innovative gill nets designed to capture salmon and steelhead but not kill them. In this way, fishers can identify and release the protected, naturally spawning stocks and keep the more abundant hatchery fish.

In the future the program will address conflicts between harvest and fish conservation through subbasin plans, which will identify the purposes of artificial production programs and wildlife mitigation efforts and recommend harvest policies consistent with goals and objectives of the fish and wildlife agencies and Indian tribes and also account for the ecological carrying capacity of habitat within the subbasins.
Harvest-related expenditures through the program since 1982 total more than $35 million.
Twenty Years of Progress: Columbia River Basin Fish and Wildlife Program
posted Apr 15, 2013
Beginning in 1982 the program initiated extensive efforts to boost artificial production of salmon and steelhead, primarily through the experimental technique of supplementation, which means incubating fish in the protective environment of hatcheries, acclimating them to conditions they will face in the wild, and then releasing them into streams and rivers to rebuild naturally spawning populations. Although still being evaluated by the scientific community, supplementation is thought by many to help rebuild genetically distinct populations of fish and increase the diversity of life history types and species in order to sustain a system of populations in the face of environmental variation. This includes intensive rescue efforts for the weakest runs, such as Snake River sockeye salmon, which are raised to adulthood and spawned in the protective hatchery environment. The progeny of these few fish then are released into tributary lakes to attempt to re-establish naturally spawning populations. Supplementation techniques also include raising fish to release into streams to rebuild naturally spawning runs where none exists currently. There are major supplementation facilities for salmon and steelhead funded by Bonneville through the Council's program in Columbia and Snake river tributaries in Washington, Oregon and Idaho.
The Council protected 44,000 miles of stream habitat from future hydroelectric development.
In areas now blocked to salmon and steelhead passage, the program also initiated and continues to fund extensive hatchery production of non-ocean, or resident, species such as trout and kokanee to replace losses of these fish and also losses of salmon and steelhead.
The program directs the construction and operation of fish hatcheries to 1) complement habitat improvements by supplementing native fish populations up to the sustainable carrying capacity of the habitat with fish that are as similar as possible in genetics and behavior to wild native fish; and 2) replace lost salmon and steelhead in blocked areas. This is a shift in artificial production philosophy from traditional hatchery practices, which focused on replacing salmon and steelhead lost to construction of dams with sufficient numbers of fish to supply commercial fisheries in the lower Columbia River. But the program does not discount the importance of fisheries. In fact, the Council is required by the Northwest Power Act to include measures in the program that complement the existing and future activities of the region's fish and wildlife agencies and Indian tribes, and these entities certainly have an interest in fisheries.
To this end, the program recognizes the value of hatchery production for the purpose of supporting fisheries – Throughout the Columbia Basin, not just in the lower river. To reconcile these sometimes competing objectives – rebuilding naturally spawning runs and also providing fish for harvest – the program initiated a thorough review of artificial production at the request of Congress. A panel of experts appointed by the Council worked with the region's fish managers to identify and review the purposes of all fish hatcheries in the Columbia River Basin and suggest operational changes consistent with the goals and objectives of the fish managers for rebuilding runs, providing fish for harvest and preserving the genetic integrity of wild and naturally spawning fish. The Artificial Production Review and Evaluation was completed in September 2003.

The program also directs substantial investment toward propagating and rebuilding resident fish populations using native fish species, particularly in areas where dams blocked anadromous fish passage. In this way, resident fish are substituted for the lost anadromous populations. Resident fish substitution also includes providing an alternate source of harvest, such as a hatchery stock.
Artificial production expenditures through the program since 1982 total more than $350 million.
Twenty Years of Progress: Columbia River Basin Fish and Wildlife Program
posted Apr 15, 2013
The program recognizes that improved fish passage at dams is not sufficient by itself to restore fish and wildlife populations. Habitat improvements are needed, too.

This work includes installing screens at irrigation pumps and water diversions to deflect juvenile fish, revegetating streamsides in areas where fish spawn and rear, and purchasing land or easements as habitat for both fish and wildlife. Since 1982 more than 1,000 water diversions have been screened. Some of these diversions were screened for the first time. At others aging screens were replaced. Hundreds of miles of streamside habitat have been fenced, revegetated and, where appropriate, recontoured and reconstructed to improve conditions for fish — both anadromous and resident.
Wildlife species ranging from birds to mammals to amphibians also were affected by the dams. Through the program, the Council identified wildlife losses due to construction of the dams and then called upon the region's fish and wildlife managers to use the losses as a starting point for wildlife mitigation agreements and measures. The program provides for substitute habitat away from the dams and reservoirs by setting aside and protecting land that is home to ecological communities similar to those that were affected by the dams. Through the program, 371,431 acres have been acquired, either through outright purchase or the purchase of easements, and set aside as wildlife habitat and managed by states and Indian tribes.
Also through the program, in 1989 the Council protected 44,000 miles of stream habitat from future hydropower development. The Federal Energy Regulatory Commission is required by law to account for these protected areas in determining whether to issue licenses for new hydropower dams.
Habitat and watershed expenditures through the program since 1982 total more than $450 million.
Twenty Years of Progress: Columbia River Basin Fish and Wildlife Program
posted Apr 15, 2013
The fish and wildlife program initiated improvements in fish passage at dams including increased flows to help juvenile fish migrate between the dams, construction of juvenile fish bypass facilities at the dams and a coordinated program of spilling water over dams for the benefit of fish that don't go through bypass facilities.
To boost flows between the dams, the 1982 program created the water budget, which is an amount of water reserved in upriver storage reservoirs in winter and then released in the spring and early summer to help boost river flows at the time when juvenile salmon and steelhead are migrating to the ocean. In subsequent revisions of the program, the Council increased the size of the water budget from its initial 3.45 million acre-feet to about 12 million acre-feet, when that amount of water is available. The current federal biological opinions establish flow standards that accomplish the same purpose as the water budget. The average is between six million and eight million acre-feet per year.
The 1982 program also called for installation of juvenile fish bypass facilities at the mainstem dams and for water spills at the dams to pass juvenile fish while the facilities were under construction. In 1984 the Council amended the program to call on the U.S. Army Corps of Engineers, the federal agency that owns and operates the dams, to develop coordinated interim juvenile fish passage plans, including spill, while it developed solutions to fish passage problems at five dams on the lower Snake and Columbia rivers. In later years the Council established standards for fish passage efficiency and fish survival at the dams through the use of mechanical bypass facilities and spill. The current version of the program, amended in 2003 with specific recommendations for the mainstem dams, calls for dam-by-dam studies to determine the most efficient level of bypass spill in order to maximize passage efficiency and fish survival and preserve water for hydropower generation when it is not needed for spill.
Juvenile fish bypass facilities have been improved or installed at seven of the eight dams on the lower Snake and Columbia rivers.
These bypass facilities and other measures have improved the survival of juvenile fish to the point that survival today is as high, or higher, through the eight dams than it was in the 1960s when only four dams were in place, according to NOAA Fisheries. Only The Dalles Dam does not have screens or a bypass system, but its ice and trash sluiceway has been used effectively for juvenile fish passage, and screens and a bypass system are being designed. Screens and bypass systems have been studied or tested at the five mid-Columbia dams owned by public utility districts.

Recently, surface bypass technology, which means passing fish over a dam close to the surface of the river rather than forcing the fish to dive 40 feet or so to the level of the spillway, has been tested at Lower Granite Dam and will be tested at Bonneville Dam. This technology has promise for passing juvenile fish effectively with less water than spillway passage.
The program also provided funding for efforts to reduce predation on salmon and steelhead. Reservoirs behind dams provide ideal breeding habitat for predator fish such as northern pikeminnow. The program funded a multi-year project that successfully reduced pikeminnow populations through a bounty reward fishery. The program also funded an effort to reduce predation by birds, particularly Caspian terns in the Columbia River estuary.
The program recognizes that dam operations also affect resident fish (these do not migrate to the ocean) and wildlife. Through the program, the Council directed the Corps of Engineers, which operates Libby Dam, and the Bureau of Reclamation, which operates Hungry Horse Dam, to provide habitat conditions in the reservoirs above the dams and the rivers below them that are necessary to restore populations of native fish to self-sustaining levels capable of supporting harvest. Both dams are in Montana, where there are no salmon. These dam operations include improving the seasonal pattern and stability of river discharges and reservoir conditions. The Council also directed the Bureau to operate Grand Coulee Dam in a manner that provides conditions necessary to protect spawning and rearing habitat for fish in and adjacent to Lake Roosevelt in order to build fish populations to levels capable of supporting harvest consistent with the goals of the Spokane and Colville tribes. The program includes other measures to protect and enhance resident fish and wildlife affected by the construction and operation of dams elsewhere in the Columbia River Basin and also recognizes that for some species, such as waterfowl, the creation of reservoirs and the inundation of shoreline areas increased wildlife habitat.
Expenditures in the mainstem Columbia and Snake rivers, not including fish passage facilities, lost hydropower income and power purchases in response to river operations to protect fish, such as spill, total more than $200 million since 1982.

Twenty Years of Progress: Columbia River Basin Fish and Wildlife Program
posted Apr 15, 2013
Introduction
The Columbia River Basin Fish and Wildlife Program is unique in the nation. The Northwest Power and Conservation Council (known until 2003 as the Northwest Power Planning Council) created the program in November 1982 in response to direction in the Northwest Power Act of 1980, the law that authorized the states of Idaho, Montana, Oregon and Washington to create the Council. The Act directs the Council to mitigate the impacts of Columbia River Basin hydropower dams on fish and wildlife by protecting and enhancing the affected species and their habitat, including the mainstem of the Columbia River and its major tributaries.
The fish and wildlife program establishes goals, objectives and strategies for mitigation. Projects that implement the program are vetted through the Independent Scientific Review Panel and the Columbia Basin Fish and Wildlife Authority, as well as the Council itself. Following these reviews, the Council recommends projects to the Bonneville Power Administration, which provides funding.
Since 1982, funding for the Council's direct program, which does not include the cost of installing fish passage facilities at the major hydropower dams on the Columbia and Snake rivers, amounts to about $1.16 billion. Bonneville also spent $1.03 billion on fixed expenses, which primarily is debt service on federal bonds issued to pay for capital investments at the dams, and $634 million to reimburse the federal Treasury for the power share of other federal agency efforts to protect, mitigate and enhance fish and wildlife affected by hydropower, primarily to improve fish passage at the federal dams and construct and operate federal hatcheries. Power purchases ($2.31 billion) and forgone revenues ($1.29 billion) and other lesser expenditures bring the total since 1982 to $6.45 billion (see Figure 1).
click to enlarge |
![]() click to enlarge |
Impressive numbers of adult salmon and steelhead have been returning to the Columbia River Basin in recent years. While no single factor can be credited for the increased run sizes, improved ocean conditions likely are one cause. Ocean conditions today are similar to conditions in the 1950s, which was a period of cool water temperatures in the north Pacific. But salmon and steelhead returns today are far higher than in the 1950s. Other factors, then, such as the habitat, hatchery and hydropower improvements accomplished through the Council's program, likely also are contributing to the increased success.

Beginning in 2000, above-average returns of salmon to the river were sustained for three years in a row, setting records in 2001 for many different salmon species. In 2003, tribal fishers were allowed to set gillnets in the river during the summer run of chinook salmon for the first time in 38 years. The higher returns have been a boon for recreational fishing as well: In 2001, an estimated 176,000 angler trips were recorded for the run of spring chinook.
The Columbia River Basin Fish and Wildlife Program contributes to rebuilding fish and wildlife populations in each of the four broad areas of impact – the so-called Four Hs: hydropower, habitat, hatcheries and harvest. Here is a brief look at the Council's efforts in these areas.
Step 2 Response Review of the Klickitat Master Plan (1988-115-35)
posted Apr 12, 2013
At the Council’s January 7, 2013 request, the ISRP conducted a review of the Yakama Nation’s response to the ISRP’s Step 2 review of the Klickitat River Anadromous Fisheries Master Plan (project 1988-115-35).
The ISRP organized its review and recommendations around three components of the Master Plan:
1. Segregated Steelhead Harvest: Response Requested
The ISRP requests a response from the sponsors that addresses the questions raised in the attached report concerning the segregated steelhead harvest program. The Master Plan has two goals for steelhead: to provide harvest opportunities to tribal and non-tribal members through a segregated hatchery program and to enhance or restore natural populations in the future through habitat restoration and supplementation. More information is needed on how a balance between conservation and harvest objectives will be achieved. There is not enough information to conclude that the proposed segregated steelhead hatchery can be operated in a manner that protects and conserves the ESA-listed natural populations in the Klickitat. Data are presented that suggest the current program, which involves out-planting of out-of-basin Skamania steelhead in the Klickitat, has had a low genetic impact on natural steelhead. What is needed, however, is a description of the yearly research, monitoring, and evaluation efforts that will be employed to ensure this determination remains valid in the future. Along with this description of methods, there should also be an explanation of how data will be used to help determine if the program should be maintained as is, or changed from its current design. It would be very helpful if explanatory text, similar to the spring Chinook appendix, could be produced for the segregated hatchery program. Such a document could be used to address the questions raised in this review.
2. McCreedy Creek Steelhead Supplementation: Meets Scientific Review Criteria (Qualified)
Questions raised in the ISRP’s comments can be addressed in the Step Three review.
3. Spring Chinook Integrated Harvest and Colonization: Meets Scientific Review Criteria (Qualified)
The ISRP appreciated the thorough explanation of this project. A few questions about this program, however, still remain. These can be addressed in the Step Three review.
Please see the attached report for details.
HLI report
posted Apr 10, 2013
Fish Tagging Forum Meeting
posted Apr 4, 2013
Date: Thursday April 11, 2013
Schedule: 8am to 3:30pm
NEW Location: Pacific States Marine Fisheries Commission, 205 SE Spokane Street, Suite 100 Portland, OR 97202
Contact: Kevin Kytola (email) kkytola@sapereconsulting.com (Phone) 509.200.9804
2010 Wildlife project review
posted Apr 3, 2013
About the Fast Track BiOp Review
posted Apr 3, 2013
This review is for BiOp Fast Track projects that were identified under the recent Columbia Basin RM&E Collaboration process and workshops. The projects identified are intended to meet high priority FCRPS RPA gaps by being implemented as soon as possible. The projects identified can be found in the AA/NOAA/NPCC BiOp RM&E Workgroup Recommendations Report. The suggested modifications to existing projects and new projects to address the FCRPS BiOp gaps were made as part of the RM&E Collaboration workshop in November 2009. The actions and associated projects required to address the highest priority gaps as identified by the Workgroups should be submitted through this Fast Track Review process as feasible.
Guidance for project sponsors
The ISRP is reviewing your project in its entirety (existing work, plus fast-track actions). This review is intended to immediately inform decisions on fast-track actions. The review is also intended to meet the needs of the larger RM&E categorical review process, to the extent possible. Depending on the outcome of the ISRP review, BPA make limit funding decisions to only address the specific fast-track actions being requested by BPA. Regardless of BPA’s funding decisions, your full proposal will be reviewed again in context with other similar projects in the RM&E category review. You will not be required to submit another full proposal for that review, but if additional information is requested by ISRP, you may augment your fast-track proposal that moves forward to the RM&E review with additional information.
Do I need to submit a fast-track proposal?
Project sponsors, COTRs, and NOAA need to confirm that the high-priority actions of the projects could be implemented shortly after April for FY10, if approved by the ISRP. If not, we ask you submit your proposal as part of the regular NPCC RM&E Categorical Review later in March 2010.
Confirmation of the applicability of the fast track process involves evaluation among Sponsors, COTRs, and when appropriate NOAA:
- If the newly proposed actions are within the original scope of the 2007-09 proposal, which previously received a positive ISRP review, no fast-track proposal is needed.
- If the project is feasible to implement in FY 10, after the April Fast Track ISRP review; or if permits and review are essential to get components on the ground before the NPCC RM&E Categorical review, which is scheduled to end in September for FY 2011 projects, a fast track proposal is recommended.
- If the fast track route is not feasible or would not result in a faster implementation of the work the project, BPA requests a “delayed” submission through the later, March 2010 RM&E Categorical review for FY2011 implementation.
These are process steps and key dates for submittal and ISRP review, and include information about permitting and contracting for the proposed work:
| Date | Milestone | Note |
| Dec 14, 2009 | Proposal forms ready | On Council’s website; updated for RM&E |
| Jan 25, 2010 | Proposal forms due | Done |
| Jan 27 | Proposals sent to ISRP for review | Done |
| Feb 24 | ISRP initial report complete | Final recommendations on some projects; preliminary recommendations on others. Done. |
| Feb 24 | Public comment on ISRP report begins | |
| Feb 24 | Emails requesting "response" to ISRP | |
| Mar 25 | Public comment period ends | Council and staff consider comments and prepare recommendations |
| Mar 25 | Sponsor responses due back to ISRP | ISRP reviews responses and develops final report due Apr 16 |
| Apr 1 | Staff recommendations to Council | On subset of projects that met scientific criteria from Feb 24 |
| Apr 13 | Committee recommendations | On staff recommendations |
| Apr 14 | Council recommendations | On committee recommendations |
| Apr 15 | Final ISRP report due | On "response requested" proposals |
| Late April/May | Possible Special Council meeting, or at regular May meeeting | To approve final fast-track set |
FY 2010 Fast Track BiOp Review
posted Apr 3, 2013
- Council recommendation
- Final ISRP review
- Responses to initial ISRP review
- Initial ISRP review
- About the review and schedule
- Contact Lynn Palensky, 503-222-5161
Click ID for proposal (at cbfish.org) or Council Rec for reviews
| ID | Title | Rec | Meets criteria? | Council Rec | Sponsor | Province | Subbasin | FY10 | FY11 | FY12 |
|---|---|---|---|---|---|---|---|---|---|---|
| 201003500 | Abundance, productivity and life history of Fifteenmile Creek Steelhead | Yes | Yes | Fund | Oregon Department of Fish & Wildlife | Columbia Gorge | Fifteenmile | $403,200 | $559,450 | $309,700 |
| 201002600 | Chinook and Steelhead Genotyping for Genetic Stock Identification (GSI) at Lower Granite Dam | Yes (Qualified) | Yes (Qualified) | Fund | Idaho Department of Fish & Game | Mainstem on the ground/Multiprovince | Mainstem on the ground/Multiprovince | $865,858 | $669,448 | $669,448 |
| 199703000 | Chinook Salmon Adult Abundance Monitoring [Includes fast track Joseph Creek Steelhead Escapement project] | Yes | Yes | Fund | Nez Perce Tribe | Mountain Snake | Salmon | $448,061 | $438,367 | $448,680 |
| 201003300 | Estimate the Relative Reproductive Success of Hatchery and Natural Origin Steelhead in the Methow River Basin | Response requested | No | (see review) | Washington Department of Fish and Wildlife | Columbia Cascade | Methow | $225,801 | $231,446 | $237,234 |
| 201003000 | Estimate viable salmon population (VSP) parameters for Yakima steelhead major population group (MPG) | Response requested | Yes (Qualified) | (see review) | Yakama Nation and WDFW | Columbia Plateau | Yakima | $644,271 | $639,960 | $655,958 |
| 201003600 | Expansion of Washington’s Tag Recovery Program in the Lower Columbia Region to Improve Fisheries and Viable Salmonid Population Monitoring | Response requested | Yes | (see review) | Washington Department of Fish and Wildlife | Lower Columbia | Columbia Lower | $1,000,000 | $839,902 | $881,896 |
| 199800702 | Grand Ronde Supplementation: Lostine River Operation and Maintenance and Monitoring and Evaluation | In Part (response requested) | Yes (Qualified) | (see review) | Nez Perce Tribe | Blue Mountain | Grande Ronde | $597,795 | $771,299 | $790,582 |
| 199107300 | Idaho Natural Production Monitoring | Response requested | Yes | (see review) | Idaho Department of Fish & Game | Mountain Snake | Salmon | $880,401 | $869,622 | $891,919 |
| 199005500 | Idaho Steelhead Monitoring and Evaluation Studies | Response requested | Yes (Qualified) | (see review) | Idaho Department of Fish & Game | Mountain Snake | Clearwater | $807,012 | $808,944 | $828,301 |
| 198909800 | Idaho Supplementation Studies | In Part (response requested) | In Part (Qualified) | (see review) | Idaho Department of Fish and Game | Mountain Snake | Salmon | $1,990,884 | $1,992,328 | $2,041,844 |
| 201003200 | Imnaha River Steelhead Status Monitoring (was 200205600) | Response requested | Yes | (see review) | Nez Perce Tribe | Blue Mountain | Imnaha | $648,269 | $419,370 | $430,086 |
| 201002800 | Implement a Rotating Panel Sampling Adult Steelhead in Small Tributaries of the Tucannon and Snake rivers | Response requested | Yes | (see review) | WDFW | Columbia Plateau | Snake Lower | $66,441 | $52,381 | |
| 200301700 | Integrated Status and Effectiveness Monitoring Program (ISEMP): The design and evaluation of monitoring tools for salmon populations and habitat in the Interior Columbia River Basin. | Yes (Qualified) | In Part | (see review) | Northwest Fisheries Science Center | Mainstem/Systemwide | Systemwide | $1,561,176 | $1,614,788 | $755,401 |
| 201003800 | Lolo Creek Permanent Weir Construction | Yes (Qualified) | Yes (Qualified) | Fund | Nez Perce Tribe | Mountain Snake | Clearwater | $200,000 | $1,100,000 | |
| 199305600 | Research to advance hatchery reform | Yes | Yes | Fund | Northwest Fisheries Science Center | Mainstem/Systemwide | Methow | $510,000 | $587,559 | $597,707 |
| 199801600 | Salmonid Productivity, Escapement, Trend, and Habitat Monitoring in the John Day River Subbasin | Yes (Qualified) | Yes (Qualified) | Fund | Oregon Department of Fish & Wildlife | Columbia Plateau | John Day | $200,571 | $1,165,975 | $1,223,075 |
| 201003100 | Snake River Chinook and Steelhead Parental Based Tagging | Yes (Qualified) | Yes (Qualified) | Fund | Idaho Department of Fish and Game | Mainstem on the ground/Multiprovince | Mainstem on the ground/Multiprovince | $1,702,206 | $1,701,034 | $1,058,029 |
| 201004200 | Tucannon Expanded Pit Tagging | Yes | Yes | Fund | Washington Department of Fish and Wildlife | Blue Mountain | Tucannon | $15,010 | $15,509 | $16,035 |
| 201003400 | Upper Columbia Spring Chinook and Steelhead Juvenile and Adult Abundance, Productivity, and Spatial Structure Monitoring. | Yes (Qualified) | Yes (Qualified) | Fund | Washington Department of Fish and Wildlife | Columbia Cascade | Wenatchee | $702,643 | $719,646 | $737,638 |
Final Council recommendations for FY 2010 Wildlife proposals
posted Apr 3, 2013
Sponsors submitted these projects for review in January 2009, and ISRP gave its final review in May 2009.
Click ID for proposal (at cbfish.org) or Council Rec for reviews
| ID | Title | Rec | Meets criteria? | Council Rec | Sponsor | Province | Subbasin | FY10 | FY11 | FY12 |
|---|---|---|---|---|---|---|---|---|---|---|
| 199206106 | Albeni Falls Wildlife Mitigation - Coeur d'Alene Tribe | Response requested | Yes (Qualified) | Fund | Albeni Falls Interagency Work Group | Intermountain | Coeur d'Alene | $505,558 | $478,668 | $466,774 |
| 199206103 | Albeni Falls Wildlife Mitigation - IDFG | Response requested | In Part (Qualified) | Fund | Idaho Department of Fish & Game | Intermountain | Pend Oreille | $3,498,906 | $3,483,926 | $3,476,182 |
| 199206102 | Albeni Falls Wildlife Mitigation - Kalispel Tribe | Response requested | Yes | Fund | Albeni Falls Interagency Work Group | Intermountain | Pend Oreille | $734,609 | $734,609 | $734,609 |
| 199206105 | Albeni Falls Wildlife Mitigation - Kootenai Tribe O, M and E | Yes | Yes | Fund | Kootenai Tribe of Idaho | Intermountain | Pend Oreille | $378,482 | $397,425 | $475,806 |
| 199205900 | Amazon Basin/Eugene Wetlands | Yes | Yes | Fund | Nature Conservancy | Lower Columbia | Willamette | $3,537,812 | $10,365,722 | $3,518,942 |
| 200600500 | Asotin Creek Wildlife Area O&M (Schlee Acquisitions) | Response requested | Yes (Qualified) | Fund | Washington Department of Fish and Wildlife | Blue Mountain | Asotin | $152,632 | $155,123 | $157,688 |
| 199204800 | Colville Confederated Tribes Wildlife Mitigation | Response requested | Yes | Fund | Colville Confederated Tribes | Intermountain | Columbia Upper | $1,428,000 | ||
| 200600300 | Desert Wildlife Area O&M (Wetland Enhancement) | Yes (Qualified) | Yes (Qualified) | Fund | Washington Department of Fish and Wildlife | Columbia Plateau | Crab | $163,325 | $167,438 | $171,623 |
| 200307200 | Habitat and Biodiversity Information System For Columbia River Basin | Yes | Yes | Fund | Northwest Habitat Institute | Mainstem/Systemwide | Systemwide | $954,740 | $958,556 | $983,075 |
| 200600600 | Habitat Evaluation Procedures (HEP) | Response requested | In Part (Qualified) | Fund | Columbia Basin Fish & Wildlife Authority | Mainstem/Systemwide | Systemwide | $575,619 | $585,391 | $600,025 |
| 199506001 | Iskuulpa Watershed Project | Response requested | Yes | Fund | Confederated Tribes of the Umatilla Indian Reservation | Columbia Plateau | Umatilla | $205,000 | $210,126 | $215,378 |
| 199107800 | John R. Palensky Wildlife Area (was Burlington Bottoms Wildlife Mitigation Project) | Yes | Yes | Fund | Oregon Department of Fish & Wildlife | Lower Columbia | Willamette | $147,934 | $153,133 | $161,043 |
| 200201100 | Kootenai Floodplain Operational Loss Assessment, Protection, Mitigation, and Rehabilitation | Yes | Yes | Fund | Kootenai Tribe of Idaho | Mountain Columbia | Kootenai | $1,279,412 | $1,291,473 | $2,295,872 |
| 200000900 | Logan Valley Wildlife Mitigation Site | Yes | Yes | Fund | Burns Paiute Tribe | Middle Snake | Malheur | $150,511 | $154,274 | $158,131 |
| 200002700 | Malheur River Wildlife Mitigation | Response requested | Yes (Qualified) | Fund | Burns Paiute Tribe | Middle Snake | Malheur | $332,722 | $341,040 | $349,566 |
| 199608000 | NE Oregon Wildlife Project (NPT) Precious Lands | Yes | Yes | Fund | Nez Perce Tribe | Blue Mountain | Grande Ronde | $432,977 | $449,800 | $460,895 |
| 199802200 | Pine Creek Conservation Area | Yes | Yes | Fund | Confederated Tribes of Warm Springs Reservation of Oregon | Columbia Plateau | John Day | $362,043 | $365,294 | $361,253 |
| 200002600 | Rainwater Wildlife Area Operations and Maintenance | Yes | Yes | Fund | Confederated Tribes of the Umatilla Indian Reservation | Columbia Plateau | Walla Walla | $307,500 | $307,500 | $307,500 |
| 199404400 | Sagebrush Flat Wildlife Area (SFWA) | Yes | Yes | Fund | Washington Department of Fish and Wildlife | Columbia Cascade | Columbia Upper Middle | $313,064 | $308,001 | $309,952 |
| 199609401 | Scotch Creek Wildlife Area | Yes | Yes | Fund | Washington Department of Fish and Wildlife | Columbia Cascade | Okanogan | $387,721 | $399,324 | $453,156 |
| 200002100 | Securing Wildlife Mitigation Sites - Oregon Ladd Marsh WMA and Grande Ronde Subbasin Wetlands | Yes | Yes | Fund | Oregon Department of Fish & Wildlife | Blue Mountain | Grande Ronde | $285,461 | $182,036 | $129,107 |
| 200301200 | Shillapoo Wildlife Area | Response requested | Yes | Fund | Washington Department of Fish and Wildlife | Lower Columbia | Columbia Lower | $404,314 | $311,922 | $319,720 |
| 199505700 | Southern Idaho Wildlife Mitigation | Response requested | Yes (Qualified) | Fund | Idaho Department of Fish & Game | Upper Snake | Snake Upper | $2,604,388 | $2,386,217 | $2,421,776 |
| 199505701 | Southern Idaho Wildlife Mitigation | Response requested | Yes (Qualified) | Fund | Idaho Department of Fish & Game | Middle Snake | Boise | $1,986,188 | $1,990,496 | $1,995,022 |
| 199505702 | Southern Idaho Wildlife Mitigation | Yes (Qualified) | Yes (Qualified) | Fund | Shoshone-Bannock Tribes | Upper Snake | Snake Upper | $380,000 | $380,000 | $430,000 |
| 199505703 | Southern Idaho Wildlife Mitigation | Yes (Qualified) | Yes (Qualified) | Fund | Shoshone Paiute Tribes | Middle Snake | Owyhee | $2,675,850 | $2,758,682 | $2,777,468 |
| 199800300 | Spokane Tribe Wildlife Mitigation Operations & Maintenance | Response requested | Yes (Qualified) | Fund | Spokane Tribe | Intermountain | Spokane | $419,806 | $429,344 | $439,109 |
| 200201400 | Sunnyside Wildlife Mitigation | Response requested | Yes | Fund | Washington Department of Fish and Wildlife | Columbia Plateau | Yakima | $325,556 | $287,096 | $349,904 |
| 199106100 | Swanson Lake Wildlife Mitigation (Swanson Lakes Wildlife Area) | Response requested | Yes | Fund | Washington Department of Fish and Wildlife | Columbia Plateau | Crab | $254,046 | $261,476 | $277,470 |
| 200001600 | Tualatin River NWR Additions | Response requested | Yes | Fund | Tualatin River NWR | Lower Columbia | Willamette | $2,012,125 | $1,494,393 | $1,594,132 |
| 200800700 | UCUT Wildlife M&E Program (UWMEP) | Response requested | Yes (Qualified) | Fund | Upper Columbia United Tribes | Intermountain | Columbia Upper | $220,000 | $220,000 | $220,000 |
| 199009200 | Wanaket Wildlife Area | Response requested | Yes | Fund | Confederated Tribes of the Umatilla Indian Reservation | Columbia Plateau | Umatilla | $256,251 | $262,656 | $269,222 |
| 200600400 | Wenas Wildlife Area O&M | Response requested | Yes | Fund | Washington Department of Fish and Wildlife | Columbia Plateau | Yakima | $448,442 | $445,109 | $802,685 |
| 200102700 | Western Pond Turtle Recovery - Columbia River Gorge - Washington | Response requested | Yes | Fund | Washington Department of Fish and Wildlife | Columbia Gorge | Columbia Gorge | $88,933 | $91,158 | $93,437 |
| 199206800 | Willamette Basin Mitigation | Response requested | Yes (Qualified) | Fund | Oregon Department of Fish & Wildlife | Lower Columbia | Willamette | $794,632 | $787,293 | $780,107 |
Final Council decision on FY 2010 wildlife project review
posted Apr 2, 2013
(Also see reviews and projects at BPA's Taurus site)
At its July 2009 meeting in Portland, the Council approved to recommend funding of 34 projects in the Wildlife Category Review to Bonneville to implement the Council’s Columbia River Basin Fish and Wildlife Program in Fiscal Years 2010-2014.
This report includes two attachments that contain and explain the Council’s recommendations:
- Final decision document; and
- A spreadsheet summarizing the recommendations by project.
Both documents together describe and explain programmatic issues; programmatic and project-specific planning budgets; project-specific qualifications; and areas of potential cost savings.
The Council recommends funding the work proposed in this wildlife project portfolio, with some qualifications, to maintain the habitat units previously acquired in the program, to work toward full mitigation, and to improve the coordination and efficiency of monitoring wildlife habitats. The recommended planning budget for wildlife projects does not include specific annual amounts. The Council recommends a five-year expense planning budget (FY2010-FY2014) for proposed work which is a not-to-exceed amount. The Council also recommends a three-year capital not-to-exceed planning budget (FY2010-FY2012) for new acquisitions. The Council expects Bonneville to achieve cost savings as described in the recommendations.
If you have any questions on the recommendations, please call Lynn Palensky or Mark Fritsch in our office at 503-222-5161.
FY 2010 Wildlife Review
posted Apr 2, 2013
News & background
- Southern Idaho Wildlife Mitigation:
- Revised proposals: 199505700 and 199505701
- Council recommendation and decision
- About the review
- Presentations from March 3-4
- BPA wildlife crediting site
- Summary of ISRP Programmatic Wildlife Comments 1997-2008
- Guidelines for enhancement, operation and maintenance activities for wildlife mitigation projects
Contacts
- Lynn Palensky, 503-222-5161, Lead
- Erik Merrill , 503-222-5161, Science review
Sixth Power Plan Mid-Term Assessment Summary
posted Apr 2, 2013
This is a brief summary of the full Mid-Term Assessment report.
Fiscal Year 2012 Annual Report
posted Apr 2, 2013
To Congress and citizens of the Pacific Northwest:
This document is the annual report of the Northwest Power and Conservation Council to Congress for Fiscal Year 2012, Oct. 1, 2011 through September 30, 2012. The annual report is required by the Northwest Power Act of 1980, the federal law that authorized the states of Idaho, Montana, Oregon, and Washington to create the Council.
The report provides an overview of the Council’s plans and actions regarding electricity in the Northwest and fish and wildlife in the Columbia River Basin in Fiscal Year 2012, as well as information about salmon and steelhead returns in calendar year 2011 and the effectiveness of the Council’s Columbia River Basin Fish and Wildlife Program.
Guided by the Council ’s Sixth Northwest Power Plan, the Northwest increased its energy-use efficiency by 280 average megawatts in 2011. Expressed as generated power, that would be enough for 189,000 Northwest homes. It was a one-year record achievement, and the average cost of the efficiency was about 1.8 cents per kilowatt-hour. That is about half the cost of power from the most efficient natural gas-fired power plant using the least-expensive natural gas.
The Council’s Fish and Wildlife Program directed $311 million for projects to boost fish and wildlife survival and abundance in the Columbia River Basin in Fiscal Year 2012. The largest share — $141 million — was for habitat-improvement efforts.
Thank you for your interest in the Council and its work.
Sincerely,
Stephen L. Crow, Executive Director
A Northwest Guide to Energy Efficiency
posted Apr 1, 2013
For more than a generation, the Pacific Northwest has been a leader in acquiring energy efficiency. Since 1978, the region has reduced electricity demand by more than 5,100 average megawatts, about half the region's load growth--more than enough to power four Seattles.
One of the reasons for this success has been the unique role that the Regional Technical Forum plays in providing a systematic way to validate energy efficiency savings.
Created in 1999 as an advisory committee to help the region meet the Council's targets for cost-effective energy efficiency, the forum uses a set of detailed guidelines for estimating savings. The savings are peer-reviewed so it's clear how the forum determined a measure's energy savings. Members include representatives from the Bonneville Power Administration, utilities, and energy organizations.
"My impression was that the forum was the designated authority on measures, but I learned that's not really the case," said Scott Williams, a senior market analyst at Puget Sound Energy in Bellevue, Washington, and a new member fo the forum.
"It's an advisory group that provides expertise that can be used by utilities and others. My understanding is that going to our state utilities commission with measures that have been blessed by the forum reduces our risk to almost a certainty that the claimed savings will be honored. That's a good thing for us."
Learn more about the forum in the upcoming Council Quarterly.
Independent Scientific Review Panel background
posted Mar 29, 2013
Independent scientific review is an established tradition in research and development programs in the United States and much of the world. Scientific review can help decision-makers separate scientific issues from other considerations (political, economic, cultural, etc.) and help ensure that environmental decision making reflects the best available scientific knowledge. In the Columbia River Basin, the magnitude of scientific research undertaken and uncertainties that remain are staggering. Independent scientific review can identify where there is consensus or disagreement among scientists and help focus implementation and research on those areas most relevant to management and policy decisions.
Independent scientific review for the fish and wildlife program is implemented by two groups: the Independent Scientific Review Panel (ISRP) and the Independent Scientific Advisory Board (ISAB). Each group provides unique services to the program. The ISRP is formed under the Council's program and reviews individual fish and wildlife projects funded by Bonneville Power Administration and makes recommendations on matters related to those projects. The ISAB operates in conjunction with the National Marine Fisheries Service and reviews programmatic and scientific issues in the basin.
Responsibilities
The ISRP was created by the Council in response to section 4(h)(10)(D) of the Northwest Power Act as amended in 1996. Under the amended Act, the ISRP provides the Council with independent scientific review of projects funded by the Bonneville Power Administration. The amended Northwest Power Act and subsequent Congressional report language defined three major areas of focus for the ISRP:
1) Review of projects proposed for direct funding by the Bonneville Power Administration under this program.
The 1996 amendment to the Northwest Power Act directed the ISRP to advise the Council regarding projects that are directly funded by Bonneville Power Administration under this program. This refers to projects proposed for funding in response to measures contained within the Council's fish and wildlife program.
The amended Act directs the ISRP to review projects in the context of the Council's program and in regard to whether they:
- are based on sound science principles;
- benefit fish and wildlife;
- have clearly defined objectives and outcomes; and
- have provisions for monitoring and evaluation of results.
The ISRP reports the results of its review before the Council adopts funding recommendations. The Council uses the ISRP review as a basis for making recommendations regarding funding, and will provide an explanation in writing where its recommendations diverge from those of the ISRP.
2) Retrospective review of project accomplishments
The amended Power Act also directs the ISRP to prepare for the Council a retrospective report based on a review of results from the projects funded the previous year.
3) Review projects funded through the Bonneville Power Administration's "reimbursable" program
In 1998, the U.S. Congress? Senate-House conference report on the fiscal year 1999 Energy and Water Development Appropriations bill directed the ISRP to annually review all fish and wildlife projects, programs, or measures included in federal agency budgets that are reimbursed by Bonneville. Many of these projects are not directly referenced in the Council's program. The ISRP is to determine whether the proposals are consistent with the criteria specified for direct program projects in the 1996 amendment.
The four major components of the reimbursable program include:
- Columbia River Fisheries Mitigation Program (Corps of Engineers)
- Fish and Wildlife Operations and Maintenance Budget (Corps of Engineers)
- Lower Snake River Compensation Plan (U.S. Fish and Wildlife Service)
- Leavenworth Hatchery (Bureau of Reclamation).
Implementation of responsibilities
Description
The amended Power Act established the Independent Scientific Review Panel as an eleven-member group of scientists. The Act also provides for the creation of Peer Review Groups to assist the ISRP in its review. These are groups formed to provide the panel with specific expertise and review. Appointments to the ISRP and Peer Review Groups are made by the Council based on recommendations from the National Research Council. The Act specifies that the panel should include expertise in fish and wildlife and in ocean sciences.
Project review
The ISRP provides the Council with independent scientific review of fish and wildlife recovery projects within the context of the Council's program. The Council directs the ISRP to focus its review on those projects that, in the panel's judgment, would benefit from scientific review. This includes especially research, evaluation, and management projects. The Council also may ask the ISRP to review subbasin and other plans to ensure that strategies are consistent with the Scientific Principles, guidelines and other established scientific information. Most projects to support coordination between parties should not require scientific review. Similarly, projects that are confined to engineering or construction of a previously reviewed strategy may not require additional scientific review.
Sequencing and scheduling of project review are based on the annual project review procedures agreed to among the Council, Bonneville Power Administration and the region's fishery managers and tribes. The review of direct and reimbursable projects are scheduled to provide the Council sufficient time to make recommendations to Bonneville and to mesh with funding cycles.
ISRP reviews are based on written proposals prepared by project sponsors and submitted in accord with Bonneville funding procedures. The Panel may also utilize additional written reports and materials that will assist them in understanding the scope and context for the proposal. In some cases, it may be appropriate for the panel to directly communicate with proposers or to conduct site visits, however, there are procedures to ensure that all communications are conducted in a fair and open manner that maintains the independence of the panel.
Review of the Comparative Survival Study 2010 Draft Annual Report to suggest topics for further review and to provide comments to improve the Annual Report
posted Mar 29, 2013
Return to the River
posted Mar 27, 2013

Contents
- Introduction
- Existing conceptual foundation for the Program
- Alternative conceptual foundation for restoration
- Diversity, structure and status
- Freshwater habitats
- Hydroelectric system
- Salmon mortality and effectiveness of migration
- Artificial production
- Harvest management
- The marine environment
- Monitoring and evaluation
- Conclusions and strategies
- Literature cited
Council begins review of regional fish and wildlife program
posted Mar 27, 2013 by John Harrison
The Council this week begins a once-every-five-years process of reviewing the largest regional fish and wildlife program in the nation, one that last year paid for nearly $250 million in habitat work, hatchery operations, hydropower system fish-passage improvements, research and related activities in the Columbia River Basin.
The Columbia River Basin Fish and Wildlife Program, which is funded by the federal Bonneville Power Administration under authority of the Northwest Power Act of 1980, is designed to protect, mitigate, and enhance fish and wildlife, and related spawning grounds and habitat, of the basin that have been affected by hydropower dams. Bonneville’s direct spending on projects that implement the program totaled $248.9 million in Fiscal Year 2012.
Under the Power Act, the Council largely bases the program on recommendations of state and federal fish and wildlife agencies and Indian tribes in the Northwest, but anyone can submit recommendations to the Council. Beginning this week, the Council will accept recommendations through July 19. After that, the Council will develop a draft program by mid-November and make it available for public comments through mid-January 2014, and then adopt the new program in April.
The program has evolved over time from its initial focus in 1982 on improving hydrosystem passage for salmon and steelhead to the extensive and multi-dimensional program it is today. The last revision was in 2009.
This time around the Council is interested in encouraging a regional conversation about the future direction and oversight of the program. Among many questions for this conversation are:
- What should be the focus of the program over the next decade?
- In what way should the Council exercise its responsibilities to maximize policy and program benefits and minimize process costs?
- In what way can the Council and the regional program be more effective, efficient and streamlined, and generate more value?
More information, including a letter requesting recommendations and directions for submitting them, is available on the Council’s program-amendment webpage, www.nwcouncil.org/amend.
The Northwest Power and Conservation Council is a compact of the states of Idaho, Montana, Oregon, and Washington and is directed by the Northwest Power Act of 1980, a federal law, to prepare a power plan to assure the Pacific Northwest region an adequate, efficient, economical, and reliable power supply. The power plan includes a program to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin affected by hydropower dams.
Contact:
Bill Bradbury, Chair, 503-229-5171
John Harrison, Information Officer, 503-222-5161
Fiscal Year 2014 budget and Fiscal Year 2013 revisions
posted Mar 27, 2013 by Sharon Ossmann
form test
posted Mar 25, 2013
Object reference not set to an instance of an object.Thank you for your recommendation.
posted Mar 22, 2013
If you provided an email or postal address we will keep you updated as the amendment process continues.
Otherwise, check back at the 2013 Amendments page periodically for updates.
NEET Work Group # 5
posted Mar 20, 2013
| 8:30 AM | Refreshments |
| 9:00 AM | Convene for Introductions/Agenda Overview/Key Outcomes (Pat Egan) |
| 9:10 AM | Taskforce Charge (Phil Jones)
|
| 9:40 AM | Panel Discussion - Definition of the Problem (Moderated by Cal Shirley)
|
| 10:40 AM | BREAK |
| 10:50 AM | Inventory/Library of Existing Work (Phil Jones)
|
| 11:20 AM | Short-Term Work/Assignments (Cal Shirley)
|
| 11:50 AM | Good of the Order/Meeting Plans (Pat Egan) |
| 12:00 PM | Adjourn |
NEET Work Group #5
posted Mar 20, 2013
| 1. | Welcome and meeting outcomes - Agenda (25k Word) |
| 2. | Brief review of questions from August 14 meeting |
| 3. | Status (60k Excel) - Inventory of PNW Education and Training Programs
|
| 4. | Status (100k Word) - EE/Green Job Inventory
|
| 5. | Workforce recruitment and retention draft (50k Word)
|
| 6. | Other Issues/Discussion |
| Additional Materials: | |
NEET Work Group # 5
posted Mar 20, 2013
| 1. | Introductions |
| 2. | Review of Agenda |
| 3. | Questions from NEET Executive Committee |
| 4. | Context/Conclusions of Literature Review |
| 5. | Recommendations/How Should We Proceed? |
| Meeting Materials: | |
Work Group #5 - Building the Energy Efficiency Workforce of the Future
posted Mar 20, 2013
What skills are needed to implement energy efficiency planning, development and implementation? What research or other efforts are currently underway to meet energy efficiency workforce needs in the region, in the West and across the country? What post high school programs exist in the Northwest to train an energy efficiency workforce? What are the key skills anticipated for the energy efficiency industry in the future? What are the current workforce demographics and analysis for the region? What initiatives do individual states have to promote a green-collar workforce?
If you would like further information, please contact Darby Collins, (503) 230-3811.
posted Mar 18, 2013
Power Supply Outlook
The Outlook should be available late March; thank you for your patience as we continue migrating content to our new site.
Power Generation Map
View hundreds of Northwest power facilities in this GoogleMaps and Google-Earth based tool. Links to detail for each facility.
Generating projects
- Existing and new/proposed power plants (Apr 2013)
- This combined spreadsheet now includes both existing projects, and new/proposed projects in the Northwest.
- Includes projects under construction, permitted sites, proposals, recently-completed projects and recent retirements.
- Graphs below are based on this spreadsheet
Capacity is essentially the 'horsepower' rating of power plants - how much they are designed to produce at full load operation
Capability is the maximum amount of energy the plants are capable of producing over the course of an average year
Total energy produced each year
Energy brought online or retired each year (new plant construction, etc.)
ISRP 2006 Retrospective Report
posted Mar 18, 2013
This report provides:
- an analysis of results reporting in FY 2007-09 Columbia River Basin Fish and Wildlife Program project proposals,
- guidance to improve future reporting and program evaluation, and
- a summary comparison of FY 2007-09 project recommendations from the ISRP and Council with each other and past reviews
Program-related questions to consider
posted Mar 18, 2013
Habitat
Intensively Monitored Watersheds (IMW's)
- If IMWs are research projects, will they provide insight into practical monitoring and evaluation questions of the Programs habitat type projects or technology transfer information in 12 to 20 years? Many IMW’s have been ongoing for awhile. What is the appropriate end point for an IMW project to reach conclusions and come to a close?
- Do we need more IMWs? If so, then where in the basin do we need them? What criteria should be applied to establish additional IMWs? In addition, how should the IMW link to the habitat type projects being implemented in the program? How would a regional approach to monitoring factor in the information gained from the IMW?
- If we do not need more IMWs, should they be included in the fish and wildlife program?
Climate Change
- If climate change results in increased water and air temperatures, higher sea level, snow pack decreases, forces changes in vegetation patterns and water use and adds stresses to native species, how should the fish and wildlife program evolve to be responsive to climate change?
- Should the program prioritize protection of cold-water refugia for resident and anadromous fish; and if so how?
- Modeling indicates the region will be receiving increased precipitation in the future, however it will be in the form of rain, not mountain snow pack. Should the program support construction of additional water storage reservoirs in the region?
- Should the program identify sacrifice zones and thereby prioritize efforts to protect/recover stocks in those subbasins identified as least affected by climate change and those with the best and most resilient habitat? Or, should the program provide interim protection to areas likely to be high priority because of climate change, as well as continuing to protect current high priority areas for future use?
Climate and Human Population
- If population growth presents the possibility of loss and fragmentation of habitat, along with increased land, water and electricity demands, how should the fish and wildlife program evolve to be responsive to population growth and incorporate population growth changes at the planning and implementation levels?
- Land use decisions are made at the state and local level, but are there useful ways the fish and wildlife program can influence, assist, or provide incentives for local land use planning?
- Considering both climate change and population growth factors, should the Council increase its participation in water acquisitions and transfer activities given predictions of water availability in the basin?
Nutrient Enhancement
- Should the program consider prioritizing areas where marine-derived nutrient enhancement activities and associated monitoring would benefit tributary systems?
Mainstem
- How can mainstem survival performance standards be established in a way that is meaningful given that fish experience variable passage history, river and ocean conditions?
- What additional changes or modifications need to be made at each mainstem dam to improve fish passage and survival to meet project and system performance standards?
- What opportunities exist to fine-tune spill levels (with or without surface bypasses), flow augmentation, and fish bypass structures at each dam, to improve in-river survival to meet performance standards?
- What changes in juvenile fish transportation would increase overall system survival?
- What policies can effectively address the effect on summer migrants of warm water and slow flows in the summer? What opportunities exist to better balance flow and temperature releases from Dworshak Dam and the Hells Canyon hydroelectric complex?
- Have the fish and wildlife program expenditures for fish passage improvements at mainstem hydroelectric dams reached the point of diminishing returns, and might some of that funding be directed more effectively to other parts of the program, such as habitat improvements upriver or in the estuary?
- What mainstem water quality improvements need to be addressed?
- What are the remaining limiting factors and critical uncertainties in the mainstem and in the program and how should they be addressed in the amended program?
- Should the Program prioritize the long-term study of the survival benefit of barge transportation for subyearling fall Chinook salmon from the Snake River in comparison to the survival benefit of summer spills at the Snake River dams to aid the downstream migration of these fish?
- Are we measuring the appropriate life history stage to assess program improvements in survival?
Lower Columbia River and Estuary
- How should the Fish and Wildlife Program focus habitat restoration efforts in the estuary and lower Columbia River considering the widely varied lengths of stay in the estuary of different salmonid populations and hatchery vs. wild fish? How can policies better connect the hydropower system to the lower river and estuary, synthesizing available scientific knowledge in order to direct future research and policy-making?
- How should the Fish and Wildlife Program focus research efforts related to the estuary, and the lower Columbia River to improve our understanding of stock-specific use of habitat including tributary deltas? Should greater efforts be made to link management of the estuary to the operation of the hydroelectric system?
- Should the FWP focus research efforts to estimate survival in the estuary of different salmonid populations including hatchery vs wild fish? Should emphasis be put on survival as well as habitat use?
Coastal and Ocean Ecosystems
- Should the Program continue to implement/invest in comprehensive fish-tagging studies to better understand how ocean conditions, distribution and high-seas fisheries management affect Columbia River stocks?
- Should strategies be designed to meet escapement goals using stock-specific estimates of early ocean survival and abundance?
- Should hatcheries be operated to put fewer juvenile fish into the river when ocean conditions are poor?
- Should the program have specific policies regarding visible marking of hatchery fish? And should the program encourage selective harvest for all stocks and fisheries?
Other Program areas
- Should the Fish and Wildlife Program focus predator control efforts in the basin? If so, how?
- Should the program continue to be a habitat-based program; and if not, what are other focal areas to consider?
- How should the Fish and Wildlife Program focus protection and/or restoration efforts for lamprey, sturgeon, burbot, Bull trout and other native species?
- Should the performance of hatcheries be evaluated solely on the number of juvenile fish released or on the number of adult returns?
- How can the program better balance protection of wild fish with the production and release of hatchery fish in the system?
- How can the FWP facilitate better linkages between research and management efforts in the watershed, estuary and ocean so that the system can be managed in a more integrated fashion?
Science Policy Exchange, Sep 12-13, 2007
posted Mar 18, 2013
Summary
Rick Williams, a scientist from Eagle, Idaho, moderated the two-day exchange. Dr. Williams, former chair of the Council’s Independent Scientific Review Panel and an expert in population and evolutionary genetics and ecology, facilitated the Science-Policy Exchange and helped focus the discussion sessions on the policy ramifications of the emerging scientific issues and how they might inform the upcoming Fish and Wildlife Program amendment process.
Results and recommendations from the Exchange are based around the habitat, mainstem, estuary, and ocean themes. For each theme, the report includes: the guiding assumptions from the Fish and Wildlife Program; the state of current science; consistency of the current science with program assumptions; and policy recommendations or implications derived from the roundtable discussions. Each session ends with the questions, answers, and insights from the roundtable discussion period.
Agenda
Day 1: Wednesday, September 12
Welcome and Exchange Overview: 8:00 - 8:20 am – Dr. Tom Karier and Rick Williams
I. Habitat Session: 8:20 am - Noon
| Time | Title | Presentations (PowerPoint) |
Abstracts (20k PDFs) |
| 8:20 - 8:30 | Introduction: Rick Williams
Return to the River and Program Assumptions |
download (1.6mb)
download (1.2mb) |
|
| 8:30 - 8:50 | A. Intensively monitored watersheds: Bob Bilby – Overview | download (300k) | abstract |
| 8:50 - 9:10 | Gordie Reeves (Case study) | download (1mb) | abstract |
| 9:10 - 9:40 | Discussion | ||
| 9:40 - 9:55 | Break | ||
| 9:55 - 10:10 | B. Habitat strategies: Susan Hanna – Overview | download (5mb) | abstract |
| 10:10 - 10:30 | Peter Paquet (strategies) | ||
| 10:30 - 11:00 | Discussion | ||
| 11:00 - 11:15 | C. Nutrient enhancement: Pete Bisson – Overview | download (1.5mb) | abstract |
| 11:15 - 11:30 | Matt Mesa (Case study) | download (4.7mb) | abstract |
| 11:30 - Noon | Discussion | ||
| Noon - 1:00 | Lunch (on your own) |
II. Mainstem Session: 1:00 - 5:30 pm
| Time | Title | Presentations (PowerPoint) |
Abstracts (20k PDFs) |
| 1:00 - 1:10 | A. Mainstem passage and survival – introduction: Rick Williams | download (1.2mb) | |
| 1:10 - 1:30 | Status trends and current management strategies: Paul Wagner | download (4.6mb) | |
| 1:30 - 1:45 | 1. Direct dam and reach survival: Steve Smith | download (1.3mb) | abstract |
| 1:45 - 2:00 | 2. Adult passage: Chris Peery | download (3.7mb) | |
| 2:00 - 2:15 | 3. RSW passage and survival: Noah Adams and Gordon Axel | download (1.3mb) | abstract |
| 2:15 - 2:30 | 4. Relationship of Snake River stream-type Chinook survival rates to in-river, ocean and climate conditions: Howard Schaller | download (5mb) | abstract |
| 2:30 - 2:45 | Break | ||
| 2:45 - 3:20 | Discussion (35 min) | ||
| 3:20 - 3:30 | B. Snake River Fall Chinook introduction: Rick Williams | download (340k) | |
| 3:30 - 3:50 | Status trends and current management strategies: Paul Wagner | download (3.3mb) | |
| 3:50 - 4:05 | 1. Fall chinook productivity – Snake and Clearwater: Jay Hesse and Billy Connor | download (1.7mb) | abstract |
| 4:05 - 4:20 | 2. Life history characteristics – relative significance of yearling and sub yearlings and relative contribution to returning adults: Billy Connor | download (1.8mb) | |
| 4:20 - 4:35 | 3. Flow/Spill – recent update of juvenile migration characteristics: Jerry McCann | download (870k) | abstract |
| 4:35 - 4:50 | 4. Dworshak and Brownlee Operations – cold water release and flow augmentation: Greg Haller | download (440k) | abstract |
| 4:50 - 5:30 | Discussion (40 min) |
Day 2: Thursday, September 13
III. Estuary Session: 8 am - noon
| Time | Title | Presentations (PowerPoint) |
Abstracts (20k PDFs) |
| 7:30 - 8:00 | Coffee and pastries in the lobby | ||
| 8:00 | Welcome and opening remarks: Council Chair, Dr. Tom Karier | ||
| 8:05 - 8:20 | Overview of the Science/Policy Exchange: Rick Williams
|
download (3mb) | |
| 8:20 - 8:30 | Estuary and ocean introduction: Rick Williams
Big picture for hydro system, research needs |
||
| 8:30 - 8:45 | Estuary overview: Colin Levings | download (6.6mb) | abstract |
| 8:45 - 9:20 | 1. Survival through the estuary: John Ferguson & Don Lyons | download1 (6mb) download2 (3mb) |
abstract |
| 9:20 - 10:00 | 2. Salmon life histories, habitats, and food webs in the Columbia River Estuary: Dan Bottom | download (4.7mb) | abstract |
| 10:00 - 10:25 | Discussion | ||
| 10:25 - 10:45 | Break | ||
| 10:45 - 11:10 | 3. Current restoration activities: Lower Columbia River Estuary Partnership | download (3.4mb) | abstract |
| 11:10 - Noon | Recap and discussion | ||
| Noon - 1:15 | Lunch (on your own) |
IV. Ocean Conditions Session: 1:15 - 5:00 pm
| Time | Title | Presentations (PowerPoint) |
Abstracts (20k PDFs) |
| 1:15 - 1:30 | Oceans introduction: Rick Williams | download (1.6mb) | |
| 1:30 - 1:45 | Coastal / ocean ecosystem overview: Bill Pearcy | download (4.3mb) | abstract |
| 1:45 - 2:15 | 1. Ocean-entry timing and plume research: Ed Casillas | download (3.4mb) | abstract |
| 2:15 - 2:35 | 2. Ocean productivity, variability and Pacific decadal oscillation: Ed Casillas | download (4.3mb) | |
| 2:35 - 3:00 | Discussion | ||
| 3:00 - 3:15 | Break | ||
| 3:15 - 3:20 | Northeast Pacific Basin introduction: Kate Myers | download (8.3mb) | abstract |
| 3:20 - 4:20 | 1. Distribution and migration — coded wire tag and genetics studies 2. POST System data 3. Review of comprehensive tagging strategies |
||
| 4:20 - 5:00 | Discussion and wrap-up |
Columbia River Estuary Science Policy Exchange
posted Mar 18, 2013
September 10-11, 2009
River View Room
Holiday Inn Express
204 West Marine Drive
Astoria, Oregon
Welcome to the Columbia River Estuary Science and Policy Exchange.
Purpose: To facilitate an exchange of information and ideas among members of the Council, the scientific community and fish and wildlife managers regarding ongoing habitat restoration work and RM&E in the lower Columbia River and estuary.
Facilitator: Donna Silverberg, DS Consultants
See the meeting notes from this conference
Day 1, September 10
Morning Session
Review of ongoing status and trend monitoring efforts
| 8:45-8:55 | Welcome and opening remarks — Joan Dukes and Dick Wallace (NWPCC) | ||
| 8:55-9:15 | The current state of knowledge on how juvenile salmon use the Columbia River estuary and plume habitats, including a summary of the Council's 2007 Science-Policy Exchange. John Ferguson (NOAA Fisheries) |
abstract | presentation 21mb PowerPoint or 2mb PDF |
| 9:15-9:45 | The Columbia River as a system: An oceanographic point of view David Jay (PSU) |
abstract | presentation 4.4mb PDF |
| 9:45-10:15 | Invasive species: implications for habitat restoration and effects on salmonids Mark Sytsma (PSU) |
presentation 14mb PowerPoint or 2.8mb PDF |
|
| 10:30-11:00 | Review of wetland habitat characteristics in the lower Columbia River and estuary Amy Borde (PNNL) |
abstract | presentation 2mb PDF |
| 11:00-11:25 | Survival and behavior of juvenile chinook salmon in the lower Columbia River, estuary and plume Geoffrey McMichael (PNNL) |
abstract | presentation 7mb PowerPoint or 1mb PDF |
Afternoon Session
Review of research to reduce restoration uncertainties
| 1:00-2:00 | Toxic contaminants and their effects on resident fish and salmonids Jennifer Morace (USGS), Lyndal Johnson (NOAA-F) and Elena Nilsen (USGS) |
abstract | presentation 10mb PowerPoint or 2mb PDF updated 10/5/09 |
| 2:00-2:45 | Ecological role of tidal-freshwater and tidal-saltwater habitats for salmonids Nichole Sather (PNNL) |
abstract | presentation 9.4mb Powerpoint or 1.5mb PDF |
| 2:45-3:00 | and Ed Casillas (NOAA-F) | abstract | presentation 11mb PowerPoint or 1.8mb PDF |
| 3:00-3:30 | Development of an ecosystem classification system for the Columbia River estuary Mary Ramirez (Univ of WA) |
abstract | presentation 19mb PowerPoint or 6.7mb PDF |
| 3:30-4:00 | Implementing the 2008 FCRPS Biological Opinion using emerging scientific tools and restoration strategies Tracey Yerxa (BPA) |
abstract | presentation 4.8mb PowerPoint or 1.5mb PDF |
| 4:00-4:35 | Review of estuary actions for salmon and steelhead contained in the Columbia River Estuary ESA Recovery Plan Module, NOAA 2008 Biological Opinion and Council’s Fish and Wildlife Program Phil Trask (PT&A) and Cathy Tortorici (NOAA-F) |
abstract | presentation 380k PowerPoint |
Day 2, September 11
Case studies of various habitat restoration actions, adaptive management and action effectiveness monitoring
| 8:30-9:15 | Overview and approaches to ecosystem restoration in lower Columbia River and estuary Catherine Corbett (LCREP) and Ian Sinks (Columbia Land Trust) |
abstract | presentation 13mb PowerPoint or 5mb PDF |
| 9:15-9:45 | Adaptive management for an ecosystem restoration program in lower Columbia River and estuary Blaine Ebberts (COE) |
abstract | presentation 1.7mb PowerPoint |
| 10:15-10:45 | Project-level effectiveness monitoring in the estuary and response in fish communities Micah Russell (CREST) |
abstract | presentation 13mb PowerPoint or 2mb PDF |
| 10:45-11:15 | Evaluating cumulative ecosystem response of the Columbia River estuary ecoysystem to past and current restoration efforts Ron Thom (PNNL) |
abstract | presentation 22mb PowerPoint or 6.7mb PDF |
| 11:15-11:45 | Panel discussion wrap-up with Council members and audience | presentation 70k PowerPoint |
|
| 11:45-12:00 | Conference summary, identification of next steps and takeaways Colin Levings (ISAB) |
presentation 50k PowerPoint |
6th Power Plan Energy Efficiency Two-Pager
posted Mar 14, 2013
(Jump to 2nd part "Northwest Energy Efficiency Achievements, 1980-2008")
Energy Efficiency in the Future: The Sixth Northwest Power Plan
Energy efficiency is at the heart of the Sixth Northwest Power Plan, which the Council adopted in February 2010. The plan, the sixth five-year revision of the regional plan first adopted by the Council in 1982, guides the Bonneville Power Administration.
According to the Plan, Northwest population will increase from about 13 million today to 16.7 million by 2030, and load (the ongoing power requirement) will increase from about 21,000 average megawatts today to about 28,000 average megawatts by 2030, an increase of about 7,000 average megawatts overall.
Cost-effective energy efficiency could meet 85 percent of the new load over the next 20 years (about 5,900 of 7,000 average megawatts). This efficiency, combined with new renewable energy, could delay investments in new fossil-fuel power plants until future environmental legislation is clear and alternative low-carbon energy sources have matured in technology and cost.
The Plan includes five specific recommendations:
- Develop cost-effective energy efficiency aggressively — at least 1,200 average megawatts by 2015, and equal or slightly higher amounts every five years through 2030.
- Develop cost-effective renewable energy as required by state laws, particularly wind power, accounting for its variable output.
- Improve power-system operating procedures to integrate wind power and improve the efficiency and flexibility of the power system.
- Build new natural gas-fired power plants to meet local needs for on-demand energy and back-up power, and reduce reliance on existing coal-fired plants to help meet the power system’s share of carbon-reduction goals and policies.
- Investigate new technologies such as the “smart-grid,” new energy-efficiency and renewable energy sources, advanced nuclear power, and carbon sequestration.
Related links:
Energy Efficiency talk
Northwest Energy Efficiency Achievements 1980-2008
How much energy efficiency has been achieved?
- Through 2008 (the latest year for which we have data) regional savings were just shy of 4,000 average megawatts. Expressed as generated electricity, that is enough to power all of the state of Idaho and Western Montana all year, with enough left over to meet the needs of a city the size of Eugene.
- In 2008, the region’ s electric utilities set an all-time record for acquiring energy efficiency - 235 average megawatts in one year (as generation, enough to power more than 14,200 Northwest homes for a year).
- Since 1980, half of the growth in demand for electricity in the Northwest has been met with energy efficiency.
- As a result of the conservation savings, we didn't have to build 8-10 new coal- or gas-fired generating plants. This means we emitted 15 million tons less carbon-dioxide in 2008 alone.
- The average cost of these savings to utilities has been less than 2 cents per kilowatt-hour, which is less than the roughly 3 cents per kilowatt-hour the Bonneville Power Administration currently charges its electric-utility customers. Energy efficiency costs about 20 percent as much as wind power, which currently costs 8 to 12 cents per kilowatt-hour.
- Because consumers didn’t have to buy 4,000 average megawatts of electricity in 2008, they paid $1.8 billion less for electricity — even after accounting for the cost of energy-efficiency programs in their electric rates.
Where is the energy efficiency, past and future?
- Major sources have been home weatherization (insulation, windows), improved efficiency in commercial lighting, improved irrigation efficiency (fewer leaks, more efficient pumps, lower water pressure), industrial motors, and lighting (installation of compact fluorescent lights, particularly).
- In the future large savings are expected to come from more efficient televisions, high-performance windows, more efficient clothes washers, water heaters, and industrial energy use. There also is a significant potential available from improving the efficiency of utility distribution systems with better voltage management, higher-efficiency transformers, and other utility-level improvements. There even are significant savings available from more-efficient dairy farm equipment.
Energy Efficiency Quick Facts
posted Mar 14, 2013
Regional energy achievements and what they mean
- Through 2008 (the latest year for which we have data) regional savings were just shy of 4,000 average megawatts. Expressed as generated electricity, that is enough to power all of the state of Idaho and Western Montana all year, with enough left over to meet the needs of a city the size of Eugene.
- In 2008, the region’ s electric utilities set an all-time record for acquiring energy efficiency - 235 average megawatts in one year (as generation, enough to power more than 14,200 Northwest homes for a year).
- Since 1980, half of the growth in demand for electricity in the Northwest has been met with energy efficiency.
- As a result of the conservation savings, we didn't have to build 8-10 new coal- or gas-fired generating plants. This means we emitted 15 million tons less carbon-dioxide in 2008 alone.
- The average cost of these savings to utilities has been less than 2 cents per kilowatt-hour, which is less than the roughly 3 cents per kilowatt-hour the Bonneville Power Administration currently charges its electric-utility customers. Energy efficiency costs about 20 percent as much as wind power, which currently costs 8 to 12 cents per kilowatt-hour.
- Because consumers didn’t have to buy 4,000 average megawatts of electricity in 2008, they paid $1.8 billion less for electricity — even after accounting for the cost of energy-efficiency programs in their electric rates.
Where is the energy efficiency, past and future?
- Major sources have been home weatherization (insulation, windows), improved efficiency in commercial lighting, improved irrigation efficiency (fewer leaks, more efficient pumps, lower water pressure), industrial motors, and lighting (installation of compact fluorescent lights, particularly).
- In the future large savings are expected to come from more efficient televisions, high-performance windows, more efficient clothes washers, water heaters, and industrial energy use. There also is a significant potential available from improving the efficiency of utility distribution systems with better voltage management, higher-efficiency transformers, and other utility-level improvements. There even are significant savings available from more-efficient dairy farm equipment.
Sixth Power Plan Summary
posted Mar 14, 2013
The Sixth Northwest Power Plan is the sixth five-year plan adopted by the Council since Congress passed the Northwest Power Act in 1980. The Power Plan, which guides the Bonneville Power Administration, details a strategy to meet future demand for electricity in a manner that assures an adequate, economic, affordable, and reliable power supply.
The Plan looks 20 years into the future. According to the Plan, Northwest population will increase from about 13 million today to 16.7 million by 2030, and load (the ongoing power requirement) will increase from about 21,000 average megawatts today to about 28,000 average megawatts by 2030, an increase of about 7,000 average megawatts overall or about 1.4 percent (about 339 average megawatts) per year.
The Northwest electricity system faces huge challenges: uncertainty about future climate-change policy, fuel prices, salmon-recovery actions, economic growth, and integration of variable wind power. Energy efficiency is the most cost-effective and least risky resource to meet future demand.
According to the Plan, cost-effective energy efficiency could meet 85 percent of the new load over the next 20 years (about 5,900 of 7,000 average megawatts). This efficiency, combined with new renewable energy, could delay investments in new fossil-fuel power plants until future environmental legislation is clear and alternative low-carbon energy sources have matured in technology and cost.
The resource strategy in the Plan includes five specific recommendations:
- Develop cost-effective energy efficiency aggressively — at least 1,200 average megawatts by 2015, and equal or slightly higher amounts every five years through 2030.
- Develop cost-effective renewable energy as required by state laws, particularly wind power, accounting for its variable output.
- Improve power-system operating procedures to integrate wind power and improve the efficiency and flexibility of the power system.
- Build new natural gas-fired power plants to meet local needs for on-demand energy and back-up power, and reduce reliance on existing coal-fired plants to help meet the power system’s share of carbon-reduction goals and policies.
- Investigate new technologies such as the “smart-grid,” new energy-efficiency and renewable energy sources, advanced nuclear power, and carbon sequestration.
New Northwest Power Plan
posted Mar 14, 2013
PORTLAND, Oregon — According to a new regional power plan adopted today by the Northwest Power and Conservation Council, 85 percent of the new demand for electricity over the next 20 years in the Northwest can be met by using energy more efficiently.
The plan’s target for the first five years, 1,200 average megawatts, is the energy equivalent of the power use of a city the size of Seattle. Over time, the energy-efficiency target in the plan — 5,900 average megawatts over 20 years — would be the most aggressive regional target in the nation.
Investments in energy-efficient equipment and products will cost less than half as much as buying electricity from new power plants, saving consumers millions of dollars. Additionally, investments in energy efficiency will reduce greenhouse gas emissions from the region’s power supply by 17 million tons per year by 2030 and create as many as 47,000 new jobs in the Northwest according to calculations by the Council staff.
“With its emphasis on energy efficiency, the plan enhances the benefits we already enjoy in the Northwest from our extensive hydropower system, which is low-cost and carbon-free,” Council Chair Bruce Measure said.
Energy efficiency and carbon-emissions control are at the heart of the Sixth Northwest Power Plan, a regional energy blueprint developed by the Northwest Power and Conservation Council that guides the region’s largest electricity supplier, the federal Bonneville Power Administration. Under federal law, the Council revises the 20-year plan every five years. Today the Council approved the latest, sixth, revision of the plan following more than two years of work that included extensive public participation and comment. While Bonneville implements the plan, the plan also serves as a reference document for the region’s electric utilities in their own planning.
The plan recommends that in addition to energy efficiency, future demand for power be met with renewable energy — mainly wind — plus new natural gas-fired turbines in areas where demand grows rapidly and utilities need new generating plants in addition to renewable power and efficiency improvements. Natural gas is preferred because it produces fewer greenhouse-gas emissions than coal. The plan anticipates no new coal-fired power plants over the 20-year planning horizon.
The plan addresses future risks, uncertainties, and growth with strategies and an action plan that minimize the expected cost of the regional power system over the next 20 years and ensure that the power supply remains affordable and reliable. Importantly, the plan assesses the risks and costs associated with carbon emissions from the regional power supply.
According to the plan, three things must happen in order to meet existing regional and state carbon-reduction targets for the year 2030:
- acquire 5,900 average megawatts of energy efficiency, which is key to reducing carbon emissions;
- meet renewable-energy portfolio standards adopted in three of the four Northwest states, which will displace power plants that burn fossil fuels; and
- reduce the future use of existing coal-fired power plants by half compared to present-day use. As well, hydropower generation must be preserved as much as possible within the limits of legal requirements to protect fish and wildlife.
Energy efficiency in the plan is responsible for reducing carbon emissions from regional generating plants by a total of 17 million tons per year by 2030. Failure to achieve the efficiency improvements in the plan will increase both the cost and risk of the power system.
Achieving all of the new efficiency could produce as many as 47,000 new jobs in the Northwest by 2030, according to calculations by the Council’s staff. Investment in energy efficiency creates jobs, both through direct installation of efficiency measures and indirectly over time through lower energy bills. The Council’s staff estimates that, on average, the annual investment in energy efficiency envisioned in the power plan will create about 3,500 new jobs per year in the energy and energy-services industries. With sustained investment in conservation over the next 20 years, the region can expect an additional net increase of 43,500 jobs throughout the economy due to the ongoing increased savings in energy bills.
Related links:
Contact:
- Bruce Measure, Chair, 406-444-3952
- Melinda Eden, Power Committee Chair, 541-938-5333
- John Harrison, Information Officer, 503-222-5161
Overview of power generation in the Northwest
posted Mar 14, 2013
From the late 1800s, when the first hydropower turbines were installed on Columbia River tributaries, into the 1960s water power from dams in the Columbia River Basin provided most of the electricity in the Pacific Northwest. Then, as population increased and the regional economy grew, demand for electricity surpassed the output of the dams. Other types of power plants were built, steadily adding to the region’s electricity supply. Primarily these were thermal plants fueled by coal, nuclear fission and natural gas. These plants boil water to make steam; the pressurized steam drives power-generating turbines. The modern power supply also includes propeller-driven turbines that make electricity from wind.
Electricity in the Northwest still is dominated by hydropower, which accounts for about 51 percent of the supply. The amount of hydropower varies with water conditions. Most of the region’s hydropower is generated on the Columbia River and its tributaries, but there also are dams on other rivers, particularly those that empty into Puget Sound. In years when precipitation and runoff are normal, the region’s hydroelectric system can provide about 16,000 average megawatts of electricity (an average megawatt is one million watts supplied continuously for a period of one year). The amount can be as much as 20,000 in a wet year or as little as 12,000 in a dry year. About 20 percent of the region’s electricity comes from plants that burn coal, and about 21 percent comes from plants that burn natural gas. The region’s single operating nuclear plant, located in eastern Washington, provides 3.2 percent of the region’s power. In all, the region’s power supply totals about 32,000 megawatts.
The resource not shown in this map — in fact, the most important resource to the Council — is energy conservation. Consistent with the Northwest Power Act of 1980, the federal law that authorized the four Northwest states to create the Council, energy conservation gets planning preference over all other sources of electricity to meet future demand for power. At a cost that is less than the cost of building new generating plants, measures can be implemented to improve energy efficiency — insulation, double-paned windows, compact fluorescent light bulbs, low-wattage traffic lights and energy-efficient industrial motors, for example. Between 1983, when the Council completed its first Northwest Power Plan, and 2004 more than 2,900 megawatts of conservation have been achieved in the Northwest. Expressed as energy generation, that is more than enough power for two cities the size of Seattle.
Related links:
- Canada: Virtual tour and photo index of dams
- Renewable Northwest Project's map of renewable energy projects (some data shared between maps)
- Contact Eric Schrepel at 503-222-5161 with any questions or data requests
The International Columbia River
posted Mar 14, 2013
The Council and the Columbia Basin Trust (CBT) aim to improve public access to environmental data and general information about the international aspects of the Columbia River. See links to environmental data from both sides of the international border, Columbia River history in British Columbia and the United States, hydropower generation at Columbia River dams in both countries, and the history and future of the Columbia River Treaty.
The Council, an agency of the states of Idaho, Montana, Oregon, and Washington, is responsible for long-range electric energy planning in the Northwest and also for protecting and enhancing fish and wildlife that have been affected by the construction and operation of hydropower dams in the United States portion Columbia River Basin.
The CBT, an agency of the Province of British Columbia, also addresses the impacts of Columbia River Basin dams – specifically the impacts of the three Columbia River Treaty dams in the province. Created by the people, for the people, the Trust serves the affected area by assisting communities through funding and grants for programs including arts; culture and heritage; business advocacy; environment; scholarships; and community development. In addition, the Trust supports regional initiatives such as climate change adaptation, water stewardship, literacy, youth engagement, and land conservation.
Through this site, the Council and CBT hope to create greater public awareness of the environmental characteristics of the basin, its history, and its future.
News and updates
- Introduction to the Columbia River Treaty brochure
- OPB story "U.S., Canada ponder terms for shared Columbia River"
- Interview with Garry Merkel, Columbia Basin Trust (excerpt from Spring 2011 CQ)
- Reassessing the Treaty, interview with Steve Oliver, BPA (excerpt from Winter 2011 CQ)
Columbia River Treaty
- Full treaty (Center for Columbia River History)
- Full treaty as PDF (United States Army Corps of Engineers)
- Exchange of Notes (United States Department of State and Canadian Embassy, March 31, 1999)
- Speakers’ Corner: A video project of the Columbia Basin Trust to record and share ideas about the Treaty
2014/2024 Review
- BC Columbia River Treaty Review
- 2014-2024 Treaty Review (Bonneville Power Administration, United States Army Corps of Engineers)
Columbia River Treaty History
- Northwest Power and Conservation Council (United States)
- Columbia Basin Trust (Canada)
Columbia River History
- Northwest Power and Conservation Council (United States)
- Columbia Basin Trust (Canada)
- Center for Columbia River History
Maps and Data
- Columbia Basin Watershed Management (Columbia Basin Trust/Selkirk College)
- Columbia Basin Biodiversity Atlas (Columbia Basin Trust/Selkirk College)
- Columbia River Basin (International Joint Commission)
- Northwest Subbasin Data Browser (Bonneville Power Administration)
- Columbia Basin GIS Data (Northwest Habitat Institute)
- StreamNet (Pacific States Marine Fisheries Commission)
Climate Change in the Columbia Basin
- Oregon Climate Assessment Report (Oregon Climate Change Research Institute, Oregon State University)
- Pacific Northwest Climate Decision Support Consortium
- Institute for a Sustainable Environment (University of Oregon)
- Climate Impacts Group (Center for Science in the Earth System, Joint Institute for the Study of the Atmosphere and Ocean, University of Washington)
- NOAA Climate Services Center
- Climate Change in the Canadian Columbia Basin (Columbia Basin Trust)
- BC Climate Exchange (Fraser Basin Council)
- Pacific Climate Impacts Consortium (University of Victoria)
Tribes and First Nations in the Columbia Basin
- First Nations in British Columbia
- Ktunaxa Nation
- Shuswap Nation
- Sinixt Nation
- Columbia River Intertribal Fish Commission (Nez Perce, Umatilla, Warm Springs, Yakama)
- Upper Columbia United Tribes (Coeur d'Alene, Kalispel, Spokane, Kootenai, Colville)
- Upper Snake River Tribes Foundation (Shoshone-Bannock, Shoshone-Paiute, Burns Paiute, Fort McDermitt Paiute-Shoshone)
- The Confederated Tribes of the Grand Ronde (Umpqua, Molalla, Rogue River, Kalapuya, Chasta)
- Cowlitz Indian Tribe
Agencies
- Permanent Engineering Board
- Bonneville Power Administration
- United States Army Corps of Engineers
- International Columbia River Board of Control (International Joint Commission)
Montana member Anders elected vice chair of Northwest Power Council
posted Mar 14, 2013
The Northwest Power and Conservation Council this week elected one of its newest members, Montana’s Jennifer Anders, as vice chair for the remainder of 2013. Ms. Anders replaces former Vice Chair Bruce Measure, a Montana member who resigned last month.
Ms. Anders, of Helena, and Pat Smith, of Arlee, were appointed to the Council by Governor Steve Bullock in January.
Ms. Anders, an assistant attorney general in Montana before her appointment to the Council, worked closely with Governor Bullock during his 2009-2012 tenure as Montana’s Attorney General. As an assistant attorney general, Ms. Anders dealt with a number of high profile issues including energy development, water quality, climate change, public land management, and interstate water compact allocations. She has spent her entire professional career in public service, working for four separate attorneys general in both civil and criminal law.
Ms. Anders has a law degree from the University of Montana and an undergraduate degree from the University of California, Santa Barbara.
Contact: Jennifer Anders, 406-444-3952
Energy efficiency is improving, wind power development may slow, assessment of regional power plan implementation shows
posted Mar 14, 2013 by John Harrison
An assessment by the Council shows that the efficiency of electricity use continues to improve and that the region is on track to meet the Council’s goal to improve efficiency by 1,200 average megawatts in the five years between 2010 and 2014. Expressed as power generation, that is enough for a city the size of Seattle.
Energy efficiency is the Northwest’s second largest energy resource. It now meets about 17 percent of the region’s demand for electricity and is still growing. Hydropower, which supplies about 55 percent of the region’s power, remains the largest resource.
Meanwhile, development of renewable resources, mainly wind power, has continued but the pace may slow in the future because of changes in renewable energy policies in California, where much of the wind power generated in the Northwest is consumed.
The Council’s assessment is in the form of a mid-term report on implementation of its 2010 Northwest Power Plan. The power plan includes a forecast of electricity demand 20 years into the future and also an action plan for acquiring generating and energy efficiency resources to meet the anticipated demand.
“This assessment, which was developed with extensive public outreach and consultation, will help the Council frame the issues and policies that will form the foundation of our next regional power plan,” Council Chair Bill Bradbury said.
The Council revises the plan every five years; it provides overall guidance for implementation activities by the Bonneville Power Administration, the region’s predominant electricity supplier. The Council will begin work on the next plan later this year.
Other key conclusions of the mid-term assessment will help define the direction of the next Northwest Power Plan. They include:
- The actual costs for energy efficiency acquisitions are well below the cost of other types of new electricity resources.
- With non carbon producing resources accounting for more than 70 percent of the region’s energy supply, the Northwest power system has the lowest greenhouse gas emissions intensity of any region in the country. Recent announcements that the Boardman and Centralia coal-fired power plants will close indicate that emissions will be even lower in the future.
- The character of the region’s power system is changing. Historically, needs for new resources were driven mostly by seasonal power needs. Today, however, the need to meet peak loads and provide flexibility to back up variable-output renewable resources is expanding the focus of the region’s planning and development of new resources.
- Conditions vary across the region and from utility to utility. Some have growing loads, and others are flat or have lost large customers. Some have surplus resources, and others face deficits. These differences affect utilities’ incentives to acquire resources, including energy efficiency.
- In addition to planned energy efficiency and renewable generation, additional resources will be needed to assure continued adequacy in the future. Planned utility resource acquisitions appear sufficient to meet these needs.
Contact:
- Bill Bradbury, Chair,, 503-229-5171
- John Harrison, Information Officer, 503-222-5161
Sixth Power Plan Mid-Term Assessment Report
posted Mar 13, 2013
This report, which received broad public review and comment, covers the region’s progress in implementing the Sixth Power Plan adopted in 2010, the changes in the energy field, and key topics for the Seventh Power Plan. It was formally adopted by the Council on March 13, 2013.
Key findings:
- The actual costs for energy efficiency acquisitions are well below the cost of other types of new electricity resources.
- With non carbon producing resources accounting for more than 70 percent of the region’s energy supply, the Northwest power system has the lowest greenhouse gas emissions intensity of any region in the country. Recent announcements that the Boardman and Centralia coal-fired power plants will close indicate that emissions will be even lower in the future.
- The character of the region’s power system is changing. Historically, needs for new resources were driven mostly by seasonal power needs. Today, however, the need to meet peak loads and provide flexibility to back up variable-output renewable resources is expanding the focus of the region’s planning and development of new resources.
- Conditions vary across the region and from utility to utility. Some have growing loads, and others are flat or have lost large customers. Some have surplus resources, and others face deficits. These differences affect utilities’ incentives to acquire resources, including energy efficiency.
- In addition to planned energy efficiency and renewable generation, additional resources will be needed to assure continued adequacy in the future. Planned utility resource acquisitions appear sufficient to meet these needs.
Habitat RME Review: ISEMP, CHAMP, and Action Effectiveness Monitoring
posted Mar 12, 2013
This ISRP report covers the:
- Integrated Status and Effectiveness Monitoring Program (ISEMP) (Project #2003-017-00)
- Columbia Habitat Monitoring Program’s (CHaMP) (Project #2011-006-00)
- Action Effectiveness Monitoring of Tributary Habitat Improvement (AEM)
In sum, the ISRP appreciates the hard work that has gone into ISEMP and CHaMP. Together, these companion projects have achieved major gains in the collection of habitat data, the elucidation of relationships between fishes and their habitats, and the effectiveness of tributary habitat restoration actions. The ISRP also appreciates that both ISEMP and CHaMP are works in progress, and that their organization, analytical tools, and data archiving will evolve as learning occurs. Without ISEMP and CHaMP, it is likely that uncoordinated habitat monitoring will continue and learning from our successes and failures will be hindered. The AEM plan provides a useful general framework for stratifying action effectiveness monitoring, but more details are needed, especially with regard to the integration of the AEM approach into ISEMP and CHaMP objectives.
Assuming AEM will collect data compatible with the CHaMP/ISEMP programs, these three efforts should provide valuable information on the productivity gains that can be achieved through habitat actions. This understanding has been lacking for the Columbia Basin, and elsewhere in the Pacific Northwest, and has likely severely hampered the effectiveness of restoration efforts over the last thirty years.
See the report for the ISRP’s detailed recommendations and comments.
The ISRP will present their review findings at the Council’s April 9, 2013 meeting in Spokane and to the Federal Caucus on March 19, 2013, NOAA offices, Portland.
Predation in the Columbia River Basin
posted Mar 12, 2013
August 9, 2012 9am – 4:30pm
Ambridge Event Center, Sellwood Room
1333 NE MLK Jr Blvd, Portland
Agenda
| 9:00 - 9:05 am | Welcome and Introductory Comments | Phil Rockefeller |
| 9:05 - 9:25 | Background & Expectations for Workshop; Introductions | Dave Ward |
| 9:25 - 9:40 | Summary of ISAB’s Columbia River Food Web Report | Robert Naiman, ISAB |
| 9:40 - 9:45 | Group Discussion | |
| Piscivorous Predation | ||
| 9:45 - 10:00 | Ecological Impacts of Non-native Species in Flathead Lake | Bonnie Ellis, Flathead Lake Biological Station |
| 10:00 - 10:15 | Ecological Impacts of Non-native species in FDR Lake | Holly McLellan, Colville Tribes |
| 10:15 - 10:30 | Coffee Break | |
| 10:30 - 10:45 | Ecological Impacts of Northern Pike in the Pend Oreille River | Deane Osterman, Kalispel Tribe |
| 10:45 - 11:00 | Summary/Benefits of Bonneville’s Pikeminnow Sport-Reward Fishery Program | John Skidmore, BPA |
| 11:00 - 11:15 | Group Discussion | |
| Avian Predation | ||
| 11:15 - 11:30 | Ecosystem-based Management of Predator-Prey Relationships between Piscivorous Birds and Salmon | Beth Sanderson, NOAA |
| 11:30 - 11:45 | Summary of Predator-Prey Relationships between Piscivorous Birds and Salmon in the Columbia River Basin | Dan Roby, OSU |
| 11:45 - 1:00 pm | Lunch Break | |
| 1:00 - 1:15 | Management of Predator-Prey Relationship between American White Pelicans and Yellowstone Cutthroat Trout in Blackfoot Reservoir | Dan Schill, IDFG |
| 1:15 - 1:30 | Group Discussion | |
| Pinniped Predation | ||
| 1:30 - 1:45 | Ecological Role of Sea Lions as Predators and Competitors | Bill Wilson, NOAA (retired) |
| 1:45 - 2:00 | Summary of Observed Sea Lion Predation on Salmonids, Sturgeon and Lamprey below Bonneville Dam | Robert Stansell, COE |
| 2:00 - 2:15 | Group Discussion | |
| 2:15 - 2:30 | Coffee Break | |
| Predation Dynamics | ||
| 2:30 - 2:45 | Piscivorous Predation Dynamics in the Columbia River Basin and the Need for a More Food Web-based Approach | Matt Mesa, USGS |
| 2:45 - 3:00 | Group Discussion | |
| Discussion of Predation Management Strategies and Alternatives | ||
| 3:00 - 3:30 | Discuss/Develop Predation Management Strategies for the Columbia River Basin | Dave Ward and Group |
| 3:30 - 4:00 | Identify Advantages and Disadvantages of Each Alternative Strategy | Dave Ward and Group |
| Workshop Summary and Wrap-up | ||
| 4:00 - 4:25 | Summary and Discussion of Management Options for Predation in the Columbia River Basin | Robert Naiman, ISAB |
| 4:25 - 4:30 | Concluding Remarks and Adjourn | Phil Rockefeller |
Review of 2009 Fish and Wildlife Program
posted Mar 8, 2013
ISAB Chair Rich Alldredge, Vice-chair Chris Wood, and member Greg Ruggerone presented findings from this report at the Council’s March 13 meeting in Portland.
Executive Summary
This report contains the evaluation by the Independent Scientific Advisory Board (ISAB) of the Northwest Power and Conservation Council's 2009 Columbia River Basin Fish and Wildlife Program (Program). In general, the ISAB finds the 2009 Program to have been a useful framework for providing context for the complex issues facing the altered Columbia River Basin ecosystem. In Part I, we revisit the conceptual foundation for the Program, focusing primarily on recommendations for updating the scientific principles based on advances in the sciences of landscape ecology and complex adaptive systems. In Part II, we examine progress in implementing the Program and in monitoring its outcomes; then we consider some major threats to future success and identify potential gaps in the current Program. In Part III, we discuss some general opportunities for improving the effectiveness of the Program.
Sustainability as a conceptual foundation
The concept of sustainability in ecology describes how biological systems remain diverse, robust, and productive over time. Sustainability can be enhanced by building ecosystem resilience and adaptability. Natural systems do not fluctuate within a fixed range of variability. What we have seen historically will not be a reliable indicator of the future, and we must seek to be more flexible and adaptable in our management responses. Uncertainty is inevitable and is an essential feature of resilience thinking, structured decision making, and adaptive management. Success is not a completed state, but a process requiring sustained monitoring, intentional learning, communication, and cooperation. Indeed, the Program amendment can be considered as the learning phase of the adaptive management cycle, and as an opportunity to benefit from 30 years of experience.
Threats to sustainability
In this review, the ISAB has identified major threats to the sustainability of the Columbia River ecosystem and to the success of the Program. This list includes loss of biological diversity, climate change (both directly and indirectly through linkages to the ocean ecosystem), proliferation of chemicals and contaminants within the Basin (including the estuary), the emergence of hybrid food webs due to the spread of non-native and artificially propagated species, and a failure to understand and respect the carrying capacity of the Columbia River ecosystem.
Biological diversity arises naturally within diverse landscapes and habitats, and it provides the redundancy and options for ecological innovation that contribute to resilience and adaptability in the face of environmental variability and change. The capacity to systematically monitor biological diversity at scales relevant to the Basin is limited. Moreover, relatively little effort is being directed at documenting trends in diversity or at understanding how actions implemented across the Basin affect diversity and the consequences of losing diversity. The ISAB recommends that the Program develop quantitative objectives for diversity and promote an active program of research to systematically collect information so that trends in biological diversity can be monitored and reported at the scale of the entire Basin.
Climate change predictions point toward changes in the timing and distribution of water flow, including extreme events such as floods and droughts. The concept of return periods of floods and droughts based on historical data may no longer be adequate for designing and planning for extreme events. Fisheries impacts due to warmer water temperatures include physiological effects such as lower growth rates that can result in higher predation, increased susceptibility to invasive and non-native species, and reduced cold water refuges. Ocean habitat suitable for salmonids in the Gulf of Alaska is projected to be substantially reduced in extent by the 2080s, due to changes in temperature, salinity, and acidification.Given the importance of climate change to the success of the Program, the ISAB recommends that the amended Program promote development of a comprehensive strategic plan to explore strategies to cope with potential impacts of climate change throughout the Basin. Modeling and analyses are needed to provide guidance for flood control and hydropower operations to enhance ecosystem resilience and adaptability under climate change.
Artificial chemical proliferation in the Basin is a priority for resolution. In addition to contaminants of the past, there is a growing concern about emerging contaminants. The estuary and the coastal ocean communities are particularly vulnerable to the accumulation of contaminants because of their spatial position in the watershed. There is an urgent need to quantify and map the spatial patterns of these chemicals; assess their transfer, accumulation, and persistence; and document their impact on native organisms and on the carrying capacity of the Columbia River ecosystem for juvenile salmonids. The Council has an opportunity to take an active role – through cooperation with regional partners – to ensure that monitoring of toxic contaminants and evaluation of their effects on fish and wildlife are addressed.
Non-native species’ spread is a major issue confronting the Program. Well-reasoned policies and procedures are needed to address the risk posed by non-native species, as well as native species spreading outside of their native ranges within the Basin. The Program could play a key role in fostering development of policies and effective methods for monitoring and controlling the spread of these species.
The limitation of the carrying capacity for juvenile salmonids is an urgent and specific priority for research, management, and restoration activities in the Basin. It is not clear whether the Columbia River can provide sufficient food in the long term to support the large populations of artificially propagated fishes produced today, as well as natural salmonids and other organisms. The concept of carrying capacity for target species in the Basin must ultimately constrain Program objectives related to the abundance and productivity of those species. The amended Program should explicitly address carrying capacity for juvenile salmonids when integrating and prioritizing plans for hatchery production and habitat restoration. The ISAB also sees a need to conduct empirical investigations and to develop bioenergetic models to estimate trophic demands on food supplies by native and non-native competitors of juvenile salmonids.
Artificial production, used to mitigate for lost harvest opportunities, must be reconciled with the objectives of ESA recovery and threats such production poses to the restoration of healthy natural populations. Implementation of artificial production must consider scientific insights about the need to maintain the diversity of heterogeneous populations and habitats that confer resilience. Hatchery fish provide important benefits to some of the Basin's stakeholders and populations, but the trade-off in costs to natural production and other environmental consequences remain poorly understood. The ISAB recommends that the artificial strategies be revised to incorporate conclusions from the Hatchery Scientific Review Group’s review and that supplementation, harvest, and habitat restoration programs must be well integrated to be effective.
Harvest plans need to be scientifically justified and consistent with subbasin and other plans that establish viability parameters for salmon and steelhead populations. It is not clear whether harvest management plans have been scientifically reviewed and analyzed to assess compatibility with the Program. If not, an independent scientific review should be encouraged. The amended Program should also promote development of capability to monitor hatchery and natural-origin fish separately so that the productivity and abundance of the naturally-reproducing stock can be tracked and used to develop escapement goals and harvest rates.
Key advice on moving forward
Three fundamental issues warrant reconsideration in amending the Program. First, it would be timely for the Council and region to re-evaluate the scientific foundation in light of accomplishments of the Program during the past 30 years. A review of the Program’s foundation might lead to reassessment of the long-term objectives and the strategies to achieve those objectives. Second, there is a need to move away from qualitative goals toward quantitative objectives with specified timelines. Third, there is a need for increased socioeconomic engagement as part of a landscape approach. The current Program is intended to be habitat-based but in reality, relies heavily on artificial production; the amended Program should be ecosystem-based and fully acknowledge social aspects of the Program that can contribute to its success.
The ISAB believes that the scientific foundation should be modified to more explicitly consider the basis of resilience and adaptability, and to include additional emphasis on the landscape approach to fish and wildlife management (ISAB 2011-1, 2011-4). Accordingly, the ISAB proposes six revised principles based on recent advances in scientific knowledge about the nature of ecosystems. These new principles are intended to replace the original eight principles, but they retain most of the original content.
Establishing quantitative performance goals both for the biological objectives and restoration strategies is an essential feature of adaptive management and provides measurable thresholds for determining success. True objectives are focused and measurable benchmarks whereas many of the “objectives” identified in the 2009 Program express general intentions as unquantified goals or strategies to achieve goals. The amended Program should include quantitative biological objectives that can be regularly monitored and evaluated as a means to determine whether the Program is on target or in need of change.
Social aspects of the Program should include stronger efforts to foster leadership and to build the structures that provide governance needed for broad collaboration and effective integration across science-management disciplines and social, political, and ecological boundaries. The revised Program should recommit to regional partnerships and explore similar ideas to strengthen regional coordination efforts, and share information and learning among projects with common settings or issues. The Program should be amended to describe techniques for engaging broader public involvement and to explain how socioeconomic engagement will be measured and monitored.
A primary conclusion of this review is that continuing to implement the Program on its existing trajectory is highly uncertain to achieve the Council’s biological objectives for the Basin. The ISAB suggests a revised focus on sustainability with strategies to protect diversity and resilience, and to build adaptability.The ISAB is concerned that artificial propagation is a risky foundation for restoration, and that adaptive management, long considered an integral component of the Program, has not been conducted in the manner originally envisioned. A landscape perspective, drawing from broader community involvement, could help build consensus on Program objectives and strategies, or if this is not possible, it could at least help to create strategies that keep options open, consistent with a diversity of visions for the future. The ISAB recommends that Council decisions be guided by the precautionary principle and structured decision making, within an adaptive management cycle.
See the full report for the ISAB’s full rationale and details.
Comments on Draft Program Amendments, document 2008-11
posted Mar 8, 2013
Error loading MacroEngine script (file: program2008CommentsDraft.cshtml)2009 Columbia River Basin Fish and Wildlife Program
posted Mar 7, 2013
Lower Columbia/Estuary Province
Columbia Estuary Subbasin
- Oregon Department of Fish and Wildlife recommendation
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Lower Columbia Fish Recovery Plan (1 and 2)
- Lower Columbia River Estuary Partnership recommendation
Cowlitz, Elochoman, Grays, Kalama, Lewis, Little White Salmon, Lower Columbia Mainstem, Washougal, Wind Subbasins
- Oregon Department of Fish and Wildlife recommendation
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Lower Columbia Fish Recovery Plan (1 and 2)
- Natural Solutions recommendation, to the extent it complements existing and future work by the agencies and tribes
- Oregon Department of Fish and Wildlife recommendation
- Columbia Basin Fish Accords (Warm Springs)
- Confederated Tribes of Grande Ronde recommendation
- Willamette Biological Opinion (Chapter 9)
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- City of Portland recommendation, to the extent it complements existing and future work by the fish and wildlife agencies and tribes
Columbia Gorge Province
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft program
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Oregon Department of Fish and Wildlife recommendation
- Columbia Basin Fish Accords (Warm Springs)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Oregon Department of Fish and Wildlife recommendation
- Columbia Basin Fish Accords (Warm Springs)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Hood Watershed Group recommendation, to the extent these actions complement the existing and future work by the fish and wildlife agencies and tribes
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish Accords (Yakama)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
Columbia Gorge mainstem subbasin
- Oregon Department of Fish and Wildlife recommendation
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Northwest Sportsfishing Industry Association recommendation, to the extent it complements the existing and future work by the fish and wildlife agencies and tribes
Columbia Plateau Province
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Oregon Department of Fish and Wildlife recommendation
- Columbia Basin Fish Accords (Warm Springs)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Deschutes Basin Board of Control recommendation, to the extent it complements the existing and future work by the fish and wildlife agencies and tribes
- Oregon Department of Fish and Wildlife recommendation
- Columbia Basin Fish Accords (Umatilla)
- Columbia Basin Fish Accords (Warm Springs)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Nez Perce Tribe recommendation
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Snake River Salmon Recovery Plan for Southeast Washington
- Oregon Department of Fish and Wildlife recommendation
- Columbia Basin Fish Accords (Umatilla)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Oregon Department of Fish and Wildlife recommendation
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish Accords (Umatilla)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Snake River Salmon Recovery Plan for Southeast Washington
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish Accords (Yakama)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Yakima Steelhead Recovery Plan
Lower Middle Columbia/Lower Snake Subbasins
- Oregon Department of Fish and Wildlife recommendation
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish Accords (Yakama)
- Nez Perce Tribe recommendation
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Snake River Salmon Recovery Plan for Southeast Washington
Columbia Cascade Province
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish Accords (Yakama)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan and recommendation
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Columbia Basin Fish Accords (Yakama)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan and recommendation
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish Accords (Colville)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia United Tribes recommendation
- Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan and recommendation
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish Accords (Yakama)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan and recommendation
Upper Middle Columbia Subbasin
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish Accords (Colville)
- Columbia Basin Fish Accords (Yakama)
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan and recommendation
Intermountain Province
- Idaho Department of Fish and Game/Office of Species Conservation recommendation
- Coeur d’Alene Tribe recommendation, as modified by comments on the recommendations
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia United Tribes recommendation
- Idaho Department of Fish and Game/Office of Species Conservation recommendation
- Coeur d’Alene Tribe recommendation, as modified by comments on the recommendations
- Kalispel Tribe recommendation
- Kootenai Tribe of Idaho recommendation
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia United Tribes recommendation
San Poil/Lake Rufus Woods/Upper Columbia Mainstem Subbasins
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Columbia Basin Fish Accords (Colville)
- Spokane Tribe recommendation
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia United Tribes recommendation
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Coeur d’Alene Tribe recommendation, as modified by comments on the recommendations
- Spokane Tribe recommendation
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia United Tribes recommendation
Mountain Columbia Province
- Columbia Basin Fish Accords (Montana) and Montana Fish Wildlife and Parks recommendation, as modified by comments on draft program
- Confederated Salish and Kootenai Tribes recommendation
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Idaho Department of Fish and Game/Office of Species Conservation recommendation
- Montana Fish Wildlife and Parks recommendation, as modified by comments on draft program
- Confederated Salish and Kootenai Tribes recommendation
- Kootenai Tribe of Idaho recommendation
- Kootenai White Sturgeon Biological Opinion
- Libby Dam Biological Opinion settlement
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Upper Columbia United Tribes recommendation
Blue Mountain Province
- Washington Department of Fish and Wildlife recommendations, as modified by comments on the draft Program
- Nez Perce Tribe recommendation
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Snake River Salmon Recovery Plan for Southeast Washington
- Oregon Department of Fish and Wildlife recommendation
- Columbia Basin Fish Accords (Umatilla)
- Nez Perce Tribe recommendation
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Oregon Department of Fish and Wildlife recommendation
- Nez Perce Tribe recommendation
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
- Columbia Basin Fish Accords (Idaho) and Idaho Department of Fish and Game/Office of Species Conservation recommendation
- Nez Perce Tribe recommendation
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section
Mountain Snake Province
- Columbia Basin Fish Accords (Idaho) and Idaho Department of Fish and Game/Office of Species Conservation recommendation
- Columbia Basin Fish Accords (Shoshone-Bannock) and Shoshone-Bannock Tribes recommendation
- Nez Perce Tribe recommendation
- FCRPS Biological Opinion
- Columbia Basin Fish and Wildlife Authority recommendation and revised resident fish section





