| 1. |
All: Introductions |
| 2. |
Sara: Brief summary of October 3 Executive Committee meeting |
| 3. |
Sara: Proposed template for final recommendations |
template (70k Word) |
| 4. |
All: Discussion of Total Resource Cost (TRC) test
- What is it and how (and if) it gets applied by NPCC, BPA, individual utilities and utility commissions (10 minutes)
- How does the TRC act as a barrier to increased energy efficiency (10 minutes)
- What changes can be proposed to overcome the barriers, what needs to happen for the change to occur, what needs to happen for the change to occur, what are the pros and cons of changes
(25 minutes)
- TRC paper - cost effectiveness
(50k Word)
- NPCC background
paper on cost effectiveness (50k Word)
|
| 5. |
Sara: Summary of discussion and next steps |
| 6. |
Prioritize remaining subgroup issues:
- free ridership
- low-income measure cost-effectiveness
- point of application of cost-effectiveness criteria
- implications of post-2011 BPA power sales contracts on avoided costs
- interaction of codes and standards with existing equipment and buildings
- recovery of costs for indirect expenditures
- state energy code differences
|