Energy arrow Resource Adequacy arrow Meetings

July 28, 2010 - Technical Committee Agenda

PNGC Power
711 NE Halsey
Portland, OR 97232

Conference Line: 503.528.5301, guest code 764209
GoToMeeting web conference: https://www1.gotomeeting.com/join/429644241

10:00 AM Model Enhancements
  • Hydro flexibility (Shearer)
  • Light-load hour purchase logic (Shearer)
  • Visual Basic interface (short update by Byrne)
11:00 AM Data Updates
  • Load forecast (1mb PDF) and treatment of conservation (Jourabchi)
  • Non-hydro resource changes (110k PowerPoint) since 2008 (King)
12:00 PM LUNCH - On your own
1:00 PM Data Updates (continued)
  • Status of temperature-correlated wind data (Koehler)
  • Hydro capacity survey (Don Long contract)
    • Comparison (1mb PowerPoint) to NRF data (McReynolds)
    • Comparison (70k PowerPoint) to White Book data (Koehler)
      >> Worksheet (55k Excel)
    • Comparison (480k PowerPoint) to Trapezoidal Model results (Fazio)
2:00 PM Phase I Completion
  • Remaining data and/or model requirements (Fazio)
    >> Genesys Model (90k PowerPoint Slideshow)
  • Interim results (500k PowerPoint) - not for distribution (Fazio)
2:30 PM Phase II Issues
  • PSRI contract status report (Fazio)
  • Dealing with local transmission bottlenecks (Fazio)
3:00 PM Schedule Next Meeting / Adjourn