RTF decisions
also see measures and meetings
| Date | Measure(s) | Decision |
| 1/17/2012 | Residential: Weatherization - Manufactured Home | Approve "under review" status for manufactured housing weatherization UES measures. RTF to conduct a quality control check on the workbook. |
| 12/13/2011 | Accept the use of SEEM 94 as calibrated for space heat energy consumption in manufactured homes when using the RTF’s prototypes and a thermostat setting of 69.4°F with 61.6°F 9-hour night setback (independent of heating system type). | |
| 12/13/2011 | Adopted the updated version of SEEM94, with its new infiltration calculations, for use in modeling site-built houses and manufactured houses. | |
| 11/1/2011 | The RTF approved the amendment of 25 UES measures without sunset criteria dates or with sunset criteria dates in 2012 to 1/30/2013 with a status of "Under Review for Compliance with RTF Guidelines." | |
| 11/1/2011 | Residential: New Construction - Energy Star Homes SF - Oregon 2012 | The RTF approved the Oregon Energy Star Home 2012 specifications and unit energy savings with active status with the measure workbook amended with window incremental cost data from the Pacific Northwest National Laboratories national survey and with sunset criteria of the date that a new residential energy code is adopted in Oregon. |
| 11/1/2011 | Residential: Weatherization - Manufactured Home Residential: Weatherization - Multi-Family Residential: Weatherization - Single Family | The RTF approved the Residential Weatherization Inspector Examination and method developed by the Residential Weatherization Specification Subcommittee. |
| 11/1/2011 | Residential: New Construction - Energy Star Homes SF - Oregon 2009 | The RTF deactivated the Single Family NW Energy Star Home measure for homes permitted under the new Oregon Energy Code. |
| 10/4/2011 | Commercial: Smart Plug Power Strips | Approve commercial smart power strip with load sensing control to active status with UES of 100 kwh and a sunset date of October 30, 2014. |
| 10/4/2011 | Residential: DHW - HPWH | Approved the Heat Pump Water Heater UES Measure, as revised during the meeting, under provisional status to include Tier I systems in all applications and Tier II In buffered unconditioned spaces (interior applications expected at a later date), with the assumed cost of the GE Unit set at $1,200 and overall measure cost adjusted accordingly, and with the study design directed by an RTF sub-committee, and a sunset date of December 31, 2014 . |
| 10/4/2011 | Residential: Heating/Cooling - Ground Source Heat Pump Upgrades | The RTF approves the Ground Source Heat Pump (GSHP) specifications as proposed by the RTF Subcommittee with a sunset date of October 30, 2014. |
| 8/30/2011 | Residential: Weatherization - Manufactured Home Residential: Weatherization - Multi-Family Residential: Weatherization - Single Family | Approve the Residential Weatherization Specifications developed by the Residential Weatherization Specification Subcommittee dated August 31, pending development of an inspection test with a sunset date of three years from the date of adoption of the inspector test. |
| 8/30/2011 | Residential: Weatherization - Manufactured Home Residential: Weatherization - Multi-Family Residential: Weatherization - Single Family | The RTF advises that the region undertake an evaluation of the impact of the non-whole house air sealing weatherization measures through pre and post blower door tests with the RTF establishing a subcommittee to develop an evaluation design. |
| 8/30/2011 | Commercial: Grocery - Strip Curtains (Provisional) | The RTF approves an extension of the evaluation plan period for Provisional UES for Grocery Refrigeration Strip Curtains with a sunset date of August 30, 2013. |
| 8/30/2011 | Residential: Lighting - CFLs | The RTF approves the Direct Mail of Standard CFL UES as proposed, with a limit of 10 lamps per mailing, and a sunset date of August 30, 2013. |
| 8/30/2011 | Residential: Lighting - Specialty CFLs and LED Downlights | The RTF approves the Provisionsal UES of Direct Mail of Specialty CFL's limited to requested lamps only, a limit of 10 lamps per request, and with a sunset date of August 30, 2013. |
| 8/30/2011 | Commercial: Grocery - Night Covers | The RTF deactivated the grocery refrigeration night cover UES measure. |
| 8/2/2011 | Residential: Heating/Cooling - Ground Source Heat Pump Upgrades | The RTF approves the Ground Source Heat Pump (GSHP) UES Measure for heating zones 2 and 3 with the provision that RTF Staff edit the table to correct for increased electricity use for air conditioning when an electric forced air furnace without air conditioning is replaced with a GSHP and reduction in measure cost when an electric forced air furnace with air conditioning is replaced with a GSHP with a sunset date of August 30, 2016. |
| 8/2/2011 | Commercial: Grocery Refrigeration System Measures | The RTF approves the Standard Savings Estimation Protocol for grocery refrigeration systems measures under provisional status until sufficient provisional data has been collected to allow the protocol to modified and adopted by the RTF without provisional data requirements or August 31, 2014, whichever comes first. |
| 6/28/2011 | Residential: New Construction - Montana House 2 | The RTF approved the Montana House2 measure to active status with a sunset date of July 1, 2014 when the measure will be placed under review to address the EISA compact fluorescent standards, any adoption of a Montana residential energy code or other changes in state of federal standards. |
| 6/28/2011 | Commercial: Non-Res - Network Computer Power Management | The RTF approved the Network PC Power Management UES measure to active status with a sunset date of July 2013. |
| 6/1/2011 | Residential: Lighting - CFLs | Approve the residential compact fluorescent lighting measure for unit energy savings measure status based on the proposed EISA phase in in baseline wattage, adjusted hours of operation, and with a sunset date of December 31, 2013. This is approved as an active measure. |
| 6/1/2011 | Residential: DHW - Showerheads | Approve the residential low flow showerhead measure for unit energy savings measure status with a sunset date of June 1, 2016 with interim review upon any shwerhead changes in national standards (Energy Star, WaterSense, state codes, or publication of new reliable reports on low flow showerhead measure performance or program impact evaluations. This is approved as an active measure. |
| 5/3/2011 | Residential: Lighting - CFLs | Advised the compact fluorescent light measure review contractor and RTF staff to go back to the calculation and make changes in the methodology to calculate the baseline and efficient-case wattage by category, perform an analysis of cost of halogen lamps, and to bring the measure back with the updated measure workbook and necessary documentation for RTF consideration. |
| 5/3/2011 | Commercial: Non-Res - Network Computer Power Management | Advised the Network PC Power Management measure review contractor and staff to use Sixth Plan numbers for heating and cooling interaction and rerun the models for load shape and divide results into schools and other building types and bring those findings back for RTF consideration. |
| 5/3/2011 | Commercial: DHW - Showerheads (Provisional) | Advised the residential showerhead measure review contractor and staff to procede on the cost-effectiveness work proposed for multifamily applications, and to bring the measure back with the updated measure workbook and necessary documentation to support any study findings incorporated into the work for RTF consideration. Advised the contractor to present more detail regarding the measure savings analysis at the upcoming RTF meeting. |
| 5/3/2011 | Advised the Residential Weatherization Subcommittee to base its ventilation requirements on the 2010 ASHRAE 62.2. | |
| 5/3/2011 | Residential: Weatherization - Single Family | Approved UES values and costs for single family residential weatherization measures. This is approved as an active measure. |
| 5/3/2011 | Residential: Heating/Cooling - Electronic Thermostats | Approved UES values and costs for the line voltage thermostat measure. This is approved as an active measure. |
| 5/3/2011 | Residential: Appliances - Refrigerators | Approved UES values and costs for the residential refrigerator measure. This is approved as an active measure. |
| 5/3/2011 | Residential: Heating/Cooling - PTCS Duct Sealing SF | Approved UES values and costs for the single family duct sealing measure. This is approved as an active measure. |
| 5/3/2011 | Residential: Heating/Cooling - Air Source Heat Pump Conversions SF | Approved UES values and costs for the single familyheat pump conversion measure. This is approved as an active measure. |
| 4/5/2011 | The RTF approved PECI's documentation plan for DOE 2.2R inputs and outputs generated from their Grocer Smart 4.0 software for non-deemed measures. (This is not an approval of the documentation requirements described under the Standard Protocol section of the Guidelines.) | |
| 4/5/2011 | The RTF recommends the proposal for use of the Grocer Smart 4.0 software tool as an RTF-approved calculation method be sent back to the subcommittee for a subcommittee recommendation to the RTF, including a written abstract on the plan to calibrate the tool. | |
| 3/1/2011 | Commercial: Non-Res - Network Computer Power Management | The RTF approved a motion to send the computer power management measure to SBW as a deemable measure, with the additional recommendation to include a requirement in the specs that the software actually be activated. |
| 3/1/2011 | The RTF recommends RTF staff hire a contractor to package the work completed by NBI, Cadmus, and BPA on the Roof Top Unit Protocol into a Standard Protocol compliant with the RTF Guidelines for review and decision by the RTF at a future meeting. | |
| 3/1/2011 | Residential: Heating/Cooling - Room Air Conditioners | The RTF voted to change the status of the Residential Energy Star Room Air Conditioner measure from "deemed" to "out-of-compliance". |
| 3/1/2011 | Residential: Lighting - LED Holiday Strings | The RTF voted to change the status of the Residential LED Holiday Light UES measure from "deemed" to "out-of-compliance". |
| 3/1/2011 | Residential: New Construction - Multifamily Low Rise | The RTF voted to change the status of the Residential Multifamily Low-Rise New Construction measure from "deemed" to "deactivated". |
| 2/1/2011 | Residential: New Construction - Montana House | The RTF changed the status of this measure to "deactivated." |
| 2/1/2011 | Residential: Appliances - Refrigerators | The RTF maintained the deemed status of the refrigerators measure. The sunset date was also changed to 2/1/2012. |
| 2/1/2011 | Residential: Heating/Cooling - Electronic Thermostats | The RTF moved the status of this measure to "under review." |
| 2/1/2011 | Industrial: Motors | The status of this measure was changed from deemed to deactivated. |
| 2/1/2011 | Residential: Heating/Cooling - PTCS Duct Sealing SF | The status of this measure was changed to "under review." |
| 2/1/2011 | Residential: Lighting - CFLs | The status of this measure was changed to "under review." |
| 2/1/2011 | Agricultural: Irrigation Hardware | The status of this measure was changed to out-of-compliance |
| 2/1/2011 | Agricultural: Motors | The status of this measure was changed to out-of-compliance |
| 1/4/2011 | Residential: Lighting - Specialty CFLs and LED Downlights | Presenters should bring their proposal back in the template format with a study plan for getting the measure to provisional status |
| 12/7/2010 | Residential: New Construction - Energy Star Homes SF - WA/ID/MT DHP TCO (provisional) | The RTF approved provisional savings numbers according to the chart in Larson's presentation for Washington, Idaho, and Montana; a three-year sunset; an annual report on the location of homes; and if available, the types of builders who use the TCO. |
| 12/7/2010 | Residential: New Construction - Energy Star Homes SF - ID/MT BOP2 | The RTF approved the deemed savings for zonal electric Energy Star homes in Idaho and Montana |
| 11/2/2010 | Commercial: Grocery - Floating Head Pressure Controls for Single Compressor Systems | Measure accepted, analysis will be run to gauge the effect of modeling different refrigerants, with the potential of splitting the savings between R404 and R22s, and that Jerome, Hadley, and Grist will review the results |
| 9/28/2010 | Commercial: Grocery - Rooftop Unit Supply Fan VFDs | Adopt savings on the basis of the16-line tables with steps in the presentation. The savings are by horsepower and hours of operation – 12, 16, or 24 hours |
| 9/28/2010 | Commercial: Grocery - Display Case LEDs (Open Cases) | Include L79 testing by an approved laboratory with the requirement of 50 lumens per watt; two-year sunset, and T10s and T12s are included for that period. |
| 9/28/2010 | Commercial: Grocery - Walk-in Evaporator Fan ECMotor Controllers | Provisionally deem the savings for 18 months, with a recommendation to collect field data on motor power draw and runtimes |
| 8/25/2010 | Residential: New Construction - Energy Star Homes SF - WA/ID/MT | Accept the Washington Builder Option Packages 1 and 2 savings |
| 8/25/2010 | Residential: New Construction - Energy Star Homes SF - WA/ID/MT | Adopt the savings for the Energy Star heat pump and gas homes in Idaho and Montana |
| 8/25/2010 | Residential: New Construction - Built Green Washington | Adopt the savings numbers associated with Built Green, including the condition for a QA and QC process |
| 8/3/2010 | Residential: Appliances - Clothes Washers in SF | The RTF agreed not to change the baseline from 1.93 MEF |
| 6/29/2010 | Residential: Appliances - Clothes Washers in SF | The RTF adopted the proposal on methodology, baseline (1.93 MEF), and results (approve savings for residential clothes washers for 2.2 MEF and above). |
| 5/4/2010 | Utility: Voltage Optimization Protocol | RTF adopted the simplified voltage optimization protocal as proposed. |
| 4/6/2010 | Residential: Lighting - Specialty CFLs and LED Downlights | The RTF made a series of decisions:
|
| 3/2/2010 | Residential: Methods for Evaluating Behavior-Based Energy Conservation Programs in the PNW | Adopted a motion that behavior-based programs go forward with the evaluation potocol guidance, if program providers see opportunities to apply it. |
| 1/5/2010 | Agricultural: Irrigation Hardware | Methodology accepted for calculating deemed savings numbers on irrigation hardware, with estimates adjusted by state and a sunset within 13 months |
| 11/9/2009 | Commercial: Appliances - Dishwashers | Accept the savings with a weighted average calculated in four categories - fuel type (gas and electric) and high and low water temperature, all based on EnergyStar data |
| 11/9/2009 | Commercial: Cooking Equipment - Combination Ovens | Adopted the combination oven provision with an 18-month life span and then revisit it with new Energy Star data. In addition, the calculation would be based on weighting the efficiency. |
| 11/9/2009 | Commercial: Cooking Equipment - Convection Ovens | Adopted the deemed savings based on the calculation presented, with the exception that the efficiency would be set at a number closer to the weighted average of sales from data about Energy Star appliances. |
| 9/15/2009 | Electric generation from waste heat at an individual facility, for in-plant use, cannot be counted toward conservation targets. | |
| 8/4/2009 | Commercial: Traffic Signals | The RTF adopted a recommendation to continue using the deemed savings assumptions from April 2001 and updating O&M savings to 2006 dollars. |
| 8/4/2009 | Agricultural: Motors | The RTF approved the proposed changes to the irrigation motor replacement savings. |
| 8/4/2009 | Commercial: Appliances - Clothes Washers | The RTF approved the recommendation for deemed savings for laundromat clothes washers, using a measure life of seven years. |
| 7/7/2009 | Agricultural: Stock Watering Tanks | The RTF approved the existing deemed energy savings (1,137kWh/year) and cost ($370) for stock watering tanks. |
| 7/7/2009 | Agricultural: Motor Rewind | The RTF approved the recommendation to accept the existing savings and costs for the green motors program. |
| 7/7/2009 | Industrial: Motor Rewind | The RTF approved the recommendation to accept the existing savings and costs for the green motors program. |
| 6/2/2009 | Residential: New Construction - Montana House | The RTF approved geothermal as the baseline heating system for computing deemed savings for geothermal heat pump conversion and calculations assuming an upgrade from a standard efficiency GSHP to an Energy Star unit. A previous motion, to approve zonal as the baseline, was defeated. |
| 6/2/2009 | Commercial: Cooking Equipment - Fryers | The RTF approved the deemed savings at 539 kWh/yr with a cost of $808 and measure life of 12 years. |
| 5/5/2009 | Commercial: Cooking Equipment - Hot Food Holding Cabinets | The RTF approved the energy savings and costs for hot food holding cabinets (incremental cost was $788 for half-size, $710 for ¾ size and $1,505 for full-size; kWh savings varied from 876 for half-size to 1,314 for ¾ size to 1,752 for full-size). |
| 5/5/2009 | Commercial: Cooking Equipment - Steamers | The RTF approved the energy savings and costs for steamers (incremental cost varied from $132 for 3-pan to $215 for 5-pan to $209 for 6-pan; kWh savings were 888 for 3-pan, 1,671 for 5-pan and 2,020 for 6-pan). |
| 5/5/2009 | Residential: Heating/Cooling - PTCS Ducts Inside | The RTF approved the proposed costs and savings, with a minor modification to use crawlspace/slab on grade weightings from NEEA's recent new construction report. |
| 5/5/2009 | Commercial: Cooking Equipment - Fryers | The RTF deferred approval of proposed costs and savings for commercial fryers to reconsider a higher-efficency baseline assumption and with a premium efficiency tier set at a higher efficiency. |
| 4/7/2009 | Commercial: Cooking Equipment - Pre-Rinse Spray Valves | The RTF approved a single baseline number (the federal minimum, 1.18 gpm) for the region, and to use the median hours of use per day by facility type (rather than the average) and to make no adjustment for post-flow rate since the tested cleanability for the 0.65 PRSV is similar to the other federal minimum PRSV's cleanability. |
| 4/7/2009 | Agricultural: Variable Frequency Drives - Potato/Onion Shed | The RTF approved recommendations for BPA and others to: a) use 1,000 kWh/year per horsepower as the deemed value for VSD potato and onion shed ventilation fans, and b) derive an estimated cost for this measure using the following equation: Measure cost = $229.61*HP + $4,727.43. |
| 4/7/2009 | Residential: Smart Plug Power Strips | The RTF provisionally deemed the smart plug power strips measure at 100 kWh for both residential and commercial sectors, with the provisio that these provisional savings expire in a year, at which time preliminary results will be provided to the RTF. In addition, the measure will have an associated installation and application specification. |
| 3/2/2009 | Residential: New Construction - Energy Star and Ecorated Homes MH | The RTF approved the EcoRated costs and savings and the updated Energy Star Manufactured Home costs and savings. |
| 11/4/2008 | Agricultural: Variable Frequency Drives - Potato/Onion Shed | The RTF adopted a deemed savings value of 1,000 kWh per hp for the spud/onion shed VFD measure, with a provisio that people are free to bring custom projects to the table for consederation. |
| 4/13/2004 | Utility: Automated CVR Protocol No. 1 | The RTF adopted the draft protocol for estimating savings from automated CVR, including temperature normalization and re-verification, as revised. |