The Technical Appendix, which is published separately from the Program,
contains reference materials which provide further information and
assistance in implementing this program. In most instances, these
materials amplify the provisions of the program with information at a
greater level of detail than the main text of the program. The materials
in the Technical Appendix have been approved by the Council for inclusion
in the Technical Appendix, but have not been formally adopted as part of
this program and may be changed without amending the program itself.
The contents of the Technical Appendix are under development and may be
modified periodically. The following appendices are completed or will be
available soon:
- The Scientific Foundation. This document is a more detailed
discussion of the information underlying the scientific principles and
ecological provinces in the program.
- Artificial
Production Review Report (text from the APR including policies and
purposes for artificial production).
- Project management and implementation guidelines, including the subbasin
assessment template (50k PDF), the
subbasin plan template, three step review procedures and
implementation of statutory requirements regarding cost-effectiveness
and consideration of ocean conditions.
- Review of the
U.S. Army Corps of Engineers Capital Construction Program, a
report of the Independent Scientific Advisory Board (1998).
- Schedule of dates for reports requested under this program (to be
approved by the Council following consultation with the affected
parties).
- Estimates of
hydropower-related losses, consisting of Appendix D
("Compilation of Information on Salmon and Steelhead Losses in
the Columbia River Basin") and Appendix E ("Numerical
Estimates of Hydropower-Related Losses") from the 1987 Fish and
Wildlife Program.
The Technical Appendix may be expanded as appropriate to include other
documents that will be valuable as references in implementing the
Council's program.
^ top |