Interactions between Fish and Wildlife Program and Sixth Power Plan (Phase 1): Task 138

February 2009  |  document IEAB 2009-1

read full document > (100k PDF)

Executive Summary

This report describes some interactions between the Fish and Wildlife Program (FWP) and the Sixth Power Plan, suggests that some of these interactions be considered in the Power Plan, and discusses additional analyses that may be appropriate.

Mainstem operations for fish in the Federal Columbia River Power System (FCRPS) under the recent Biological Opinions (BiOp) have been extensively documented in the form of hydrosystem, and power generation and value models. This paper does not focus on these models and their results. Rather, this paper identifies potential changes over the 20-year Power Plan time horizon relative to recent conditions and analyzes some other, less-studied interactions.

The IEAB concludes that several important interactions between the power system and the FWP should be analyzed and discussed in the Sixth Power Plan:

Interactions that may not need analysis but should be acknowledged in the Power Plan are:

Interactions that are judged to be less important are: