council logo
Contact
About

Integrating energy and the environment in the Columbia River Basin

About the Council
Mission and Strategy Members and Staff Bylaws Policies Careers / RFPs
News

See what the Council is up to.

Read the Latest News
Read All News Press Resources Newsletters International Columbia River

Explore News By Topic

Fish and Wildlife Planning Salmon and Steelhead Wildlife Energy Planning Energy Efficiency Demand Response
Fish and Wildlife

The Council works to protect and enhance fish and wildlife in the Columbia River Basin. Its Fish & Wildlife Program guides project funding by the Bonneville Power Administration.

Fish and Wildlife Overview

The Fish and Wildlife Program

2025-26 Amendment Process 2014/2020 Program Program Tracker: Resources, Tools, Maps Project Reviews and Recommendations Costs Reports

Independent Review Groups

  • Independent Economic Analysis Board (IEAB)
  • Independent Scientific Advisory Board (ISAB)
  • Independent Scientific Review Panel (ISRP)

Forums and Workgroups

  • Asset Management Subcommittee
  • Ocean and Plume Science and Management Forum
  • Regional Coordination
  • Science and Policy Exchange
  • Toxics Workgroup
  • Columbia Basin Research, Monitoring and Evaluation Workgroup
  • Informal Hatchery Workgroup
  • Strategy Performance Indicator Workgroup

Topics

Adaptive Management Anadromous Fish Mitigation Blocked Areas Hatcheries & Artificial Production Invasive and Non-Native Species Lamprey Predation: Sea lions, pike, birds Protected Areas Research Plan Resident Fish Program Tracker: Resources, Tools, Maps Sockeye Sturgeon
Power Planning

The Council develops a plan, updated every five years, to assure the Pacific Northwest of an adequate, efficient, economical, and reliable power supply.

Power Planning Overview

The Northwest Power Plan

9th Northwest Power Plan The 2021 Northwest Power Plan 2021 Plan Supporting Materials 2021 Plan Mid-term Assessment Planning Process and Past Power Plans

Technical tools and models

Advisory Committees

Climate and Weather Conservation Resources Demand Forecast Demand Response Fuels Generating Resources Resource Adequacy System Analysis Regional Technical Forum (RTF) RTF Policy

TOPICS

Energy Efficiency Demand Response Power Supply Resource Adequacy Hydropower Transmission Annual Studies

ARCHIVES

Meetings
See current meeting Today in via Webinar › See all meetings ›

Recent and Upcoming Meetings

Swipe left or right
APR 2025
THU
24
9:00 am—10:00 am
Public Affairs Committee
APR 2025
TUE
29
1:00 pm—3:00 pm
Council Meeting
MAY 2025
TUE WED
13 - 14
Council Meeting
MAY 2025
FRI
16
2:00 pm—4:00 pm
Demand Forecast Advisory Committee
MAY 2025
THU
22
9:00 am—2:30 pm
RTF Meeting
MAY 2025
WED
28
Council Meeting Executive Session
MAY 2025
THU
29
9:00 am—12:00 pm
Conservation Resources Advisory Committee
MAY 2025
FRI
30
1:30 pm—3:00 pm
Demand Response Advisory Committee
JUN 2025
TUE WED
10 - 11
Council Meeting
JUN 2025
TUE
17
9:00 am—4:00 pm
RTF Meeting
JUN 2025
WED
25
3:00 pm—4:00 pm
Conservation Resources Advisory Committee
JUN 2025
THU
26
8:30 am—2:00 pm
Council Meeting
JUL 2025
WED
09
1:00 pm—3:00 pm
RTF Policy Advisory Committee
JUL 2025
TUE WED
15 - 16
Council Meeting
JUL 2025
THU
17
9:30 am—3:30 pm
System Analysis Advisory Committee
JUL 2025
MON
21
10:30 am—12:00 pm
Public Affairs Committee
JUL 2025
TUE
22
9:00 am—4:00 pm
RTF Meeting
AUG 2025
TUE WED
12 - 13
Council Meeting
AUG 2025
TUE
19
9:00 am—1:00 pm
RTF Meeting
AUG 2025
WED FRI
20 - 22
Congressional tour: Sun Valley Idaho
AUG 2025
TUE
26
9:00 am—12:00 pm
System Analysis and Resource Adequacy Combined Advisory Committees
SEP 2025
TUE WED
09 - 10
Council Meeting
SEP 2025
TUE
16
9:00 am—3:30 pm
RTF Meeting
SEP 2025
THU
18
1:00 pm—2:30 pm
RTF Policy Advisory Committee
SEP 2025
TUE WED
23 - 24
Council Work Session
SEP 2025
MON
29
1:00 pm—5:00 pm
Regional Coordination Forum (RCF) - Adaptive Management Work Session
OCT 2025
WED
01
9:00 am—3:30 pm
System Analysis and Resource Adequacy Combined Advisory Committees
OCT 2025
TUE THU
14 - 16
Council Meeting
OCT 2025
TUE
21
9:00 am—4:00 pm
RTF Meeting
OCT 2025
TUE WED
28 - 29
Council Work Session on F&W Amendments
NOV 2025
WED
05
9:00 am—12:00 pm
System Analysis Advisory Committee
NOV 2025
THU
13
9:00 am—1:00 pm
RTF Meeting
NOV 2025
TUE WED
18 - 19
Council Meeting
DEC 2025
TUE
09
9:00 am—4:00 pm
RTF Meeting
DEC 2025
TUE WED
16 - 17
Council Meeting
JAN 2026
TUE THU
13 - 15
Council Meeting
JAN 2026
WED
21
9:00 am—4:00 pm
RTF Meeting
FEB 2026
TUE THU
10 - 12
Council Meeting
FEB 2026
WED THU
18 - 19
RTF Meeting
MAR 2026
TUE THU
10 - 12
Council Meeting
MAR 2026
TUE
17
9:00 am—4:00 pm
RTF Meeting
APR 2026
TUE THU
14 - 16
Council Meeting
APR 2026
TUE
21
9:00 am—4:00 pm
RTF Meeting
MAY 2026
TUE THU
12 - 14
Council Meeting
MAY 2026
TUE
19
9:00 am—4:00 pm
RTF Meeting
JUN 2026
TUE THU
16 - 18
Council Meeting
JUN 2026
TUE WED
23 - 24
RTF Meeting
JUL 2026
TUE THU
14 - 16
Council Meeting
JUL 2026
TUE
21
9:00 am—4:00 pm
RTF Meeting
AUG 2026
TUE WED
11 - 12
Council Meeting
AUG 2026
TUE WED
18 - 19
RTF Meeting
SEP 2026
WED THU
09 - 10
Council Meeting
SEP 2026
TUE WED
15 - 16
RTF Meeting
OCT 2026
WED THU
14 - 15
Council Meeting
OCT 2026
TUE
20
9:00 am—4:00 pm
RTF Meeting
NOV 2026
TUE
10
9:00 am—1:00 pm
RTF Meeting
NOV 2026
TUE WED
17 - 18
Council Meeting
DEC 2026
TUE
08
9:00 am—4:00 pm
RTF Meeting
DEC 2026
TUE WED
15 - 16
Council Meeting
View Council Meetings View All Meetings
Reports and Documents

Browse reports and documents relevant to the Council's work on fish and wildlife and energy planning, as well as administrative reports.

Browse Reports

REPORTS BY TOPIC

Power Plan Fish and Wildlife Program Subbasin Plans Financial Reports Independent Scientific Advisory Board Independent Scientific Review Panel Independent Economic Analysis Board

COLUMBIA RIVER HISTORY PROJECT

Achievable Savings: A Retrospective Look at the Northwest Power and Conservation Council’s Conservation Planning Assumptions

Council Document Number: 
2007-13
Published date: 
Aug. 1, 2007
Document state: 
Published

The Northwest Power Act of 1980, the federal law that authorized the states of Idaho, Montana, Oregon, and Washington to form the Northwest Power and Conservation Council, directs the Council and the Bonneville Power Administration to treat energy conservation --improved efficiency of electricity use -- as a resource equal to electricity generation when planning to meet future demand for power. The Act requires Bonneville to acquire all cost-effective conservation first before acquiring new power from generating resources.

The Act also directs the Council to prepare, and to periodically review, a regional electric power plan to assure an adequate, efficient, economical, and reliable electricity supply in the Pacific Northwest. The administrator of Bonneville is required by the Act to make resource acquisition decisions that are consistent with the Council’s power plan. Consistent with the Power Act, energy conservation is the highest-priority resource in the Council’s power plan.

To assist the Council in determining the cost-effectiveness of generating and conservation resources that are included in the power plan, the Act establishes three criteria. A cost-effective resource or measure is one that is forecast by the Council to be 1) reliable, 2) available when it is needed, and 3) no more expensive than the least-cost alternative resource.

From this instruction, the Council developed a methodology to identify all of the technically feasible potential conservation measures in the region and any timing constraints to their implementation. With this methodology, the Council forecasts the rate of annual deployment of conservation measures and the maximum achievable potential of the measures over the 20-year horizon of the power plan (the Act requires the Council to plan 20 years into the future and to review the plan every five years).

The Council divides conservation measures into two categories: those that can be acquired at any time, such installing low-flow shower heads (these are called non-lost opportunity measures), and those that can only be acquired under specific conditions or at a specific time, such as wall insulation in buildings that are under construction (these are called lost-opportunity measures -- if they aren’t implemented, the opportunity is lost). For planning purposes, the Council sets penetration limits, with respect to time, for both types of conservation.

In its planning, the Council assumes that the upper limit of conservation (this is called “penetration”) that can reasonably be acquired by all mechanisms available. These mechanisms include more than utility programs alone. The mechanisms include incentive payments from utility and system benefit charge programs, improved state and local building codes, federal and state appliance standards, market transformation programs, marketing efforts, voluntary programs, electricity pricing mechanisms and other tools. The Council’s assumptions estimate achievable penetration rates without respect to what fraction will be acquired by utility programs versus other mechanisms such as market transformation, codes, standards, or electricity price effects.

Over the twenty-year planning horizon the long-term cumulative upper limit of market penetration in the region is 85 percent of the economically (i.e., cost-effective) and technically achievable potential for non-lost opportunity measures and about 65 percent for lost-opportunity measures over a 20 year period. In addition to long-term penetration limits, the Council sets annual near-term limits on how much conservation can reasonably be developed. These annual limits are a more critical assumption for regional planning and implementation than the long-term penetration limits.

The annual limit for non-lost-opportunity measures is 120 average megawatts per year. The annual limit for lost-opportunity measures gradually increase from 15 percent to 85 percent of annually available and cost-effective lost-opportunity measures over the first twelve years of plan implementation. These annual limits have the effect of reducing the near-term achievable potential significantly. For example, in the first ten years of plan implementation, the resultant cumulative limit of achievable potential is 62 percent of the 20-year economically and technically available potential for non-lost opportunities and 21 percent for lost-opportunity resources. In aggregate, across both non-lost opportunity and lost-opportunity resources, the Council’s 5th Plan limits achievable potential to about 44 percent of the 20-year technical and economic potential over the first ten years.

There is ample historic evidence to support retaining these near-term and long-term planning assumptions, as both are supported by actual experience during the last 20 years. There are many examples of better than 85 percent penetration for lost-opportunity measures. For example, before the end of 1992 -- not quite 10 years after the Council issued its first power plan -- Washington and Oregon, the two most populous states in the region, already had met the energy-savings goals in the plan set forth for new residential and commercial construction. By 2002 all four Northwest states had met the goals of the plan for conservation in new residential construction and also exceeded the goals for conservation in new commercial buildings by at least 10 percent.

Examples of historic penetration rates for non-lost-opportunity measures are more difficult to analyze on a retrospective basis by measure because of data limitations and a lack of sustained efforts for many measures. The Hood River Weatherization Project demonstrated over 85 percent penetration in just two years with a 100 percent incentive and a large marketing effort. Recent data shows over 32 percent penetration in just six years for residential compact fluorescent lighting. Furthermore, there are two episodes of high region-wide acquisition rates in the early 1990s and 2000s that demonstrate the capability to acquire over 100 average megawatts per year through utility programs alone.

It is more relevant today to reliably predict the pace at which conservation programs can be “ramped up” and maintained over the near-term than it is to plan 20 years into the future. The 20-year timeframe stipulated in the Act for the Council’s power and conservation planning is less important for conservation than the near-term acquisition rates for two reasons. In 1980, new generating plants took up to 15 years to site, license, and build. Today, new generating facilities and transmission system expansions can be brought on line in three to five years. Second, the Council develops a new power plan every five years or so. Conservation potential is reassessed in each plan which allows a fresh look at accomplishments as well as what exists for future potential.

ISRP 2021-05 LibbyMFWPfollow-up1June.pdf

Public comments from draft version

Orr
Cherniack
Faste
Donahue
Bishop
Joslin 
NWEC
Benton
Tacoma Power
Sierra
SOS
WISE
Cowlitz
Multiple copies of form letter
Download the full report

Sign up for our newsletter

  •    

Contact

  • Central Office
  • Idaho Office
  • Montana Office
  • Oregon Office
  • Washington Office
  • Council Members

Social Media

Facebook Instagram LinkedIn Vimeo Flickr

© NW Power & Conservation Council

Privacy policy Terms & Conditions Inclusion Statement