council logo
Contact
About

Integrating energy and the environment in the Columbia River Basin

About the Council
Mission and Strategy Members and Staff Bylaws Policies Careers / RFPs
News

See what the Council is up to.

Read the Latest News
Read All News Press Resources Newsletters International Columbia River

Explore News By Topic

Fish and Wildlife Planning Salmon and Steelhead Wildlife Energy Planning Energy Efficiency Demand Response
Fish and Wildlife

The Council works to protect and enhance fish and wildlife in the Columbia River Basin. Its Fish & Wildlife Program guides project funding by the Bonneville Power Administration.

Fish and Wildlife Overview

The Fish and Wildlife Program

2025-26 Amendment Process 2014/2020 Program Program Tracker: Resources, Tools, Maps Project Reviews and Recommendations Costs Reports

Independent Review Groups

  • Independent Economic Analysis Board (IEAB)
  • Independent Scientific Advisory Board (ISAB)
  • Independent Scientific Review Panel (ISRP)

Forums and Workgroups

  • Asset Management Subcommittee
  • Ocean and Plume Science and Management Forum
  • Regional Coordination
  • Science and Policy Exchange
  • Toxics Workgroup
  • Columbia Basin Research, Monitoring and Evaluation Workgroup
  • Informal Hatchery Workgroup
  • Strategy Performance Indicator Workgroup

Topics

Adaptive Management Anadromous Fish Mitigation Blocked Areas Fish Screens Hatcheries & Artificial Production Invasive and Non-Native Species Lamprey Predation: Sea lions, pike, birds Protected Areas Research Plan Resident Fish Program Tracker: Resources, Tools, Maps Sockeye Sturgeon
Power Planning

The Council develops a plan, updated every five years, to assure the Pacific Northwest of an adequate, efficient, economical, and reliable power supply.

Power Planning Overview

The Northwest Power Plan

9th Northwest Power Plan The 2021 Northwest Power Plan 2021 Plan Supporting Materials 2021 Plan Mid-term Assessment Planning Process and Past Power Plans

Technical tools and models

Advisory Committees

Climate and Weather Conservation Resources Demand Forecast Demand Response Fuels Generating Resources Resource Adequacy System Analysis Regional Technical Forum (RTF) RTF Policy

TOPICS

Energy Efficiency Demand Response Power Supply Resource Adequacy Hydropower Transmission Annual Studies

ARCHIVES

Meetings
See next Council Meeting February 10, 2026 in Portland › See all meetings ›

Recent and Upcoming Meetings

Swipe left or right
JUL 2025
THU
17
9:30 am—3:30 pm
System Analysis Advisory Committee
JUL 2025
MON
21
10:30 am—12:00 pm
Public Affairs Committee
JUL 2025
TUE
22
9:00 am—4:00 pm
RTF Meeting
AUG 2025
TUE WED
12 - 13
Council Meeting
AUG 2025
TUE
19
9:00 am—1:00 pm
RTF Meeting
AUG 2025
WED FRI
20 - 22
Congressional tour: Sun Valley Idaho
AUG 2025
TUE
26
9:00 am—12:00 pm
System Analysis and Resource Adequacy Combined Advisory Committees
SEP 2025
TUE WED
09 - 10
Council Meeting
SEP 2025
TUE
16
9:00 am—3:30 pm
RTF Meeting
SEP 2025
THU
18
1:00 pm—2:30 pm
RTF Policy Advisory Committee
SEP 2025
TUE WED
23 - 24
Council Work Session
SEP 2025
MON
29
1:00 pm—5:00 pm
Regional Coordination Forum (RCF) - Adaptive Management Work Session
OCT 2025
WED
01
9:00 am—3:30 pm
System Analysis and Resource Adequacy Combined Advisory Committees
OCT 2025
TUE THU
14 - 16
Council Meeting
OCT 2025
TUE
21
9:00 am—4:00 pm
RTF Meeting
OCT 2025
TUE WED
28 - 29
Council Work Session on F&W Amendments
NOV 2025
WED
05
9:00 am—12:00 pm
System Analysis Advisory Committee
NOV 2025
THU
13
9:00 am—1:00 pm
RTF Meeting
NOV 2025
TUE WED
18 - 19
Council Meeting
DEC 2025
WED THU
03 - 04
Council Work Session on F&W Amendments
DEC 2025
TUE
09
9:00 am—3:15 pm
RTF Meeting
DEC 2025
TUE
16
9:00 am—11:00 am
Council Meeting
DEC 2025
FRI
19
9:00 am—10:00 am
Council Meeting Executive Session
JAN 2026
TUE
13
9:00 am—6:00 pm
Council Meeting
4:00 pm—6:00 pm
Public hearing on Draft 2026 Columbia River Basin Fish and Wildlife Program
JAN 2026
WED
21
9:00 am—4:00 pm
RTF Meeting
JAN 2026
WED
28
9:00 am—12:00 pm
Conservation Resources Advisory Committee
JAN 2026
THU
29
9:00 am—4:00 pm
System Analysis Advisory Committee
4:00 pm—6:00 pm
Public hearing on Draft 2026 Columbia River Basin Fish and Wildlife Program (Lewiston)
4:00 pm—6:00 pm
Public hearing on Draft 2026 Columbia River Basin Fish and Wildlife Program (Kalispell)
FEB 2026
TUE
03
4:30 pm—6:30 pm
Public hearing on Draft 2026 Columbia River Basin Fish and Wildlife Program (Spokane)
FEB 2026
WED
04
4:30 pm—6:30 pm
Public hearing on Draft 2026 Columbia River Basin Fish and Wildlife Program (Yakima)
FEB 2026
TUE
10
Council Meeting
FEB 2026
THU
12
4:00 pm—6:00 pm
Public hearing on Draft 2026 Columbia River Basin Fish and Wildlife Program (Bend)
4:00 pm—6:00 pm
Public hearing on Draft 2026 Columbia River Basin Fish and Wildlife Program (Boise)
FEB 2026
TUE
17
4:30 pm—6:30 pm
Public hearing on Draft 2026 Columbia River Basin Fish and Wildlife Program (Seattle)
FEB 2026
WED
18
9:00 am—12:25 pm
RTF Meeting
FEB 2026
TUE
24
Public hearing on Draft 2026 Columbia River Basin Fish and Wildlife Program
FEB 2026
THU
26
1:30 pm—3:00 pm
Conservation Resources Advisory Committee
MAR 2026
TUE THU
10 - 12
Council Meeting
MAR 2026
TUE
17
9:00 am—4:00 pm
RTF Meeting
APR 2026
TUE THU
14 - 16
Council Meeting
APR 2026
TUE
21
9:00 am—4:00 pm
RTF Meeting
MAY 2026
TUE THU
12 - 14
Council Meeting
MAY 2026
TUE
19
9:00 am—4:00 pm
RTF Meeting
JUN 2026
TUE THU
16 - 18
Council Meeting
JUN 2026
TUE WED
23 - 24
RTF Meeting
JUL 2026
TUE WED
14 - 15
Council Meeting
JUL 2026
TUE
21
9:00 am—4:00 pm
RTF Meeting
AUG 2026
TUE WED
11 - 12
Council Meeting
AUG 2026
TUE WED
18 - 19
RTF Meeting
SEP 2026
WED THU
09 - 10
Council Meeting
SEP 2026
TUE WED
15 - 16
RTF Meeting
OCT 2026
WED THU
14 - 15
Council Meeting
OCT 2026
TUE
20
9:00 am—4:00 pm
RTF Meeting
NOV 2026
TUE
10
9:00 am—1:00 pm
RTF Meeting
NOV 2026
TUE WED
17 - 18
Council Meeting
DEC 2026
TUE
08
9:00 am—4:00 pm
RTF Meeting
DEC 2026
TUE WED
15 - 16
Council Meeting
View Council Meetings View All Meetings
Reports and Documents

Browse reports and documents relevant to the Council's work on fish and wildlife and energy planning, as well as administrative reports.

Browse Reports

REPORTS BY TOPIC

Power Plan Fish and Wildlife Program Subbasin Plans Financial Reports Independent Scientific Advisory Board Independent Scientific Review Panel Independent Economic Analysis Board

COLUMBIA RIVER HISTORY PROJECT

Clarification on ISRP review comments on the proposed Shoshone-Bannock/Shoshone-Paiute Joint Culture Facility

Council Document Number: 
ISRP 2001-3 addendum
Published date: 
Aug. 6, 2001
Document state: 
Published

This memo responds to a May 4, 2001 memorandum from Mark Fritsch (NPPC staff) to the ISRP, in which the ISRP is directed to provide additional detail and clarification regarding review of the Shoshone-Bannock/Shoshone-Paiute Joint Culture Facility. The ISRP reviewed the Step 3 document of the SBT/SPT Joint Culture Facility (Project #199500600) in February 2001 and the Council, following the recommendation of the ISRP (ISRP 2001-3), did not approve the Step 3 Review.

We appreciate the concerns of the Council and the project sponsors in seeking additional clarification with respect to the review, while noting that responding at this level of detail to individual reviews is something the ISRP has rarely engaged in, finding it generally counterproductive to the independent peer review process. In this instance, we hope the additional communication will provide clarification and constructive criticism.

The communication from the Shoshone-Bannock and Shoshone-Paiute tribes requesting clarification was structured so that the ISRP concern or question was noted followed by responses from either the Shoshone-Bannock Tribes (SBT) staff or the Shoshone-Paiute Tribes (SPT) staff or both. Responses from each were color coded, so throughout the document, it was clear which comments came from the SBT or the SPT. While the Joint Culture Facility proposal is for a single artificial production facility jointly operated by the tribes, the SBT and SPT proposed activities represent two programs that are quite distinct from one another. Consequently, our response deals first with the SPT redband portion of the proposal, then with the SBT portion of the proposal.

Shoshone-Paiute Tribe – Redband Portion of Joint Culture Facility Proposal

The need for an artificial production facility to support the SPT's proposed stocking of Lake Billy Shaw with indigenous redband trout is yet to be demonstrated, as the Sho-Pai tribal fisheries staff itself recognizes in its responses to ISRP concerns. Only after the distributional, abundance, and genetic assessment studies are completed on DVIR redband trout populations, can the need for an artificial production facility be assessed. These studies are presently underway.

Results of these studies should indicate whether DVIR stream redband trout populations are robust enough that they can be subsampled and used as stocking sources for Lake Billy Shaw, thus obviating the need for a redband production facility, or whether artificial production is needed to supply the stocking needs for Lake Billy Shaw. Until the studies are completed and an overall assessment occurs, any decision about the Shoshone-Paiute needs for a joint culture artificial production facility would be premature.

Shoshone-Bannock Tribe – Fort Hall Bottoms Portion of Joint Culture Facility Proposal

The response statements and questions from the Shoshone-Bannock Tribe appear to fall into several major themes, focusing on project justification, scientific-technical approach, the peer review process in general, and proposal preparation (e.g., specific questions about missing details in the proposal). Another major concern of the reviewers was that the proposal did not reflect current developments in conservation biology and fisheries science, particularly with respect to integration of recent relevant literature.

Recent Developments and Literature

Recent studies by Idaho Fish and Game, including genetic analysis of putative Yellowstone cutthroat trout populations in the upper Snake River system (above Shoshone Falls) indicate that numerous genetically intact Yellowstone cutthroat trout populations exist throughout the southeast Idaho area (Powell and Williams, unpublished data). Consequently, priority for the restoration of Yellowstone cutthroat trout in the Fort Hall Bottoms system seems uncertain. These data also suggest that numerous donor populations may exist from which translocations of Yellowstone cutthroat trout into the Fort Hall Bottoms system could occur, if the problem of continued hybridization with naturalized rainbow trout and the presence of brook trout can be successfully addressed.

As an example of the importance of non-native fish control, a recent publication in the North American Journal of Fisheries Management (Harig, A., K. Fausch, and M. Young. 2000. NAJFM 20:994-1004) examined factors influencing the success or failure of greenback cutthroat trout translocations as part of the ESA-driven restoration efforts for greenback cutthroat trout in Colorado. The authors found that one of the primary factors influencing whether a translocation succeeded or not, was whether non-native trout were present in the translocation site. Translocations at sites where non-native trout were absent or had been eliminated were significantly more successful than efforts at sites where non-native trout existed. These findings have strong implications for the SBT's proposed restoration program for Yellowstone cutthroat trout in the Fort Hall Bottoms system.

Scientific Approach and Project Justification

It appears from the response that the project proponents have a very different understanding of the Council's review process than does the ISRP. They state repeatedly that the ISRP needs to tell them what to do that will result in funding for a hatchery. Their conceptual model for peer review seems to be: complete steps a, b, c, then build a hatchery. We, on the other hand, have been looking for biological/scientific justification that a hatchery was needed and would work to the benefit of, and not to the detriment of, fish and wildlife. The primary problem with the Shoshone-Bannock Tribe (SBT) portion of the Joint Culture Facility proposal is not just that it contains too little data or the wrong data; rather it is that the data available not only do not suggest that a hatchery is a good idea (in terms of benefit to fish and wildlife, production or protection of self-sustaining populations of wild fish and the ecosystems that sustain them, or other FWP and Gorton amendment criteria), they suggest it is a bad one, likely not to solve the problems present and likely to worsen some of the them.

Given the consistency the ISRP's Step 3 review with past ISRP reviews of the project, and the similarity of concerns raised by the Pacific Northwest National Laboratory in its Step 2 review of the project, it seems logical to suggest that the project sponsors radically revisit their proposed approach to restoring Yellowstone cutthroat trout populations in the Fort Hall Bottoms, rather than simply revising the existing proposal for resubmittal in the upcoming Upper Snake provincial review. Most native trout restoration programs in the western U.S. focus their efforts on habitat improvement or restoration and suppression or elimination of non-native fish. These actions are often accompanied by transplants of native fish from nearby populations into the restored habitat. Such an approach appears worthy of serious consideration in the Fort Hall Bottoms situation, as the initial review material suggests that such an approach is more biologically justified than the proposed approach.

However, until the status of Yellowstone cutthroat trout (YCT) populations in the area are much more thoroughly described than they were in the proposal (distribution, abundance, hybridization status, description of limiting factors, habitat status, status of non-native trout, etc.), it will impossible to determine whether they can be managed effectively to avoid continued hybridization with naturalized rainbow trout in the area and whether there is a justifiable role for an artificial production facility in their management. Statements in the Step 3 proposal and in the SBT response indicate that the project sponsors are unable or unwilling to remove rainbow trout from the system, placing any plan to restore cutthroat trout to the system in serious jeopardy, if not predestining it to failure. Presence of brook trout in the system is also troubling, and reviewers saw no indication of adequate assessment of that issue.

Proposal Preparation and the Peer Review Process

The ISRP review of the Step 3 proposal for the Fort Hall Bottoms portion of the proposed Joint Culture facility described many concerns about the project's approach and deficiencies in technical aspects of the proposal including the project's technical justification, literature review, data presentation, and proposed monitoring and evaluation plans. These concerns had also been noted in previous ISRP reviews and by the Step 2 review from the Pacific Northwest National Laboratory.

As noted above, a common theme in the response from the SBT was a call for the ISRP to identify specific levels of detail that are presently missing in the Joint Culture proposal (e.g., which specific reference citations, what additional data, what stocking densities, etc.). The ISRP has worked extensively with CBFWA personnel since the ISRP's formation in 1996 to define the elements of technically sound, logically persuasive proposals. In each of our annual reports reviewing FWP proposals (1998, 1999, and 2000), we identified a small number of proposals (2-4) that were very well written and could serve as models for other project sponsors. We appreciate the concern, as well as the evident frustration of the SBT project sponsors. Unfortunately, the ISRP cannot provide detailed specific guidance to individual project sponsors in proposal preparation without compromising our primary responsibility to the region to conduct peer review.

Topics: 
Fish and wildlife
Tags: 
ISRP

ISRP 2021-05 LibbyMFWPfollow-up1June.pdf

Download the full report

Sign up for our newsletter

  •    

Contact

  • Central Office
  • Idaho Office
  • Montana Office
  • Oregon Office
  • Washington Office
  • Council Members

Social Media

Facebook Instagram LinkedIn Vimeo Flickr

© NW Power & Conservation Council

Privacy policy Terms & Conditions Inclusion Statement