council logo
Contact
About

Integrating energy and the environment in the Columbia River Basin

About the Council
Mission and Strategy Members and Staff Bylaws Policies Careers / RFPs
News

See what the Council is up to.

Read the Latest News
Read All News Press Resources Newsletters International Columbia River

Explore News By Topic

Fish and Wildlife Planning Salmon and Steelhead Wildlife Energy Planning Energy Efficiency Demand Response
Fish and Wildlife

The Council works to protect and enhance fish and wildlife in the Columbia River Basin. Its Fish & Wildlife Program guides project funding by the Bonneville Power Administration.

Fish and Wildlife Overview

The Fish and Wildlife Program

2025-26 Amendment Process 2014/2020 Program Program Tracker: Resources, Tools, Maps Project Reviews and Recommendations Costs Reports

Independent Review Groups

  • Independent Economic Analysis Board (IEAB)
  • Independent Scientific Advisory Board (ISAB)
  • Independent Scientific Review Panel (ISRP)

Forums and Workgroups

  • Asset Management Subcommittee
  • Ocean and Plume Science and Management Forum
  • Regional Coordination
  • Science and Policy Exchange
  • Toxics Workgroup
  • Columbia Basin Research, Monitoring and Evaluation Workgroup
  • Informal Hatchery Workgroup
  • Strategy Performance Indicator Workgroup

Topics

Adaptive Management Anadromous Fish Mitigation Blocked Areas Hatcheries & Artificial Production Invasive and Non-Native Species Lamprey Predation: Sea lions, pike, birds Protected Areas Research Plan Resident Fish Program Tracker: Resources, Tools, Maps Sockeye Sturgeon
Power Planning

The Council develops a plan, updated every five years, to assure the Pacific Northwest of an adequate, efficient, economical, and reliable power supply.

Power Planning Overview

The Northwest Power Plan

9th Northwest Power Plan The 2021 Northwest Power Plan 2021 Plan Supporting Materials 2021 Plan Mid-term Assessment Planning Process and Past Power Plans

Technical tools and models

Advisory Committees

Climate and Weather Conservation Resources Demand Forecast Demand Response Fuels Generating Resources Resource Adequacy System Analysis Regional Technical Forum (RTF) RTF Policy

Topics

  • Energy Efficiency
  • Demand Response
  • Power Supply
  • Resource Adequacy
  • Energy Storage
  • Hydropower
  • Transmission

ARCHIVES

Meetings
See next Council Meeting June 10 - 11, 2025 in Missoula › See all meetings ›

Recent and Upcoming Meetings

Swipe left or right
NOV 2024
WED
06
1:00 pm—4:00 pm
System Analysis Advisory Committee
NOV 2024
THU
07
10:00 am—12:00 pm
Demand Response Advisory Committee
NOV 2024
WED THU
13 - 14
Council Meeting
NOV 2024
TUE WED
19 - 20
RTF Meeting
NOV 2024
THU
21
1:00 pm—2:00 pm
Resource Cost Framework in Power Plan Webinar
NOV 2024
FRI
22
9:30 am—11:30 am
Fuels Advisory Committee
DEC 2024
MON
02
11:00 am—12:00 pm
Demand Response Advisory Committee
DEC 2024
WED
04
10:00 am—12:00 pm
Climate and Weather Advisory Committee
1:00 pm—4:00 pm
RTF Policy Advisory Committee Q4
DEC 2024
TUE WED
10 - 11
Council Meeting
DEC 2024
TUE
17
9:00 am—4:00 pm
RTF Meeting
JAN 2025
WED
08
9:30 am—3:30 pm
Conservation Resources Advisory Committee
JAN 2025
MON
13
10:00 am—12:00 pm
Demand Forecasting Advisory Committee
JAN 2025
TUE WED
14 - 15
Council Meeting
JAN 2025
WED
22
1:00 pm—4:00 pm
RTF New Member Orientation
JAN 2025
THU
23
9:00 am—4:00 pm
RTF Meeting
JAN 2025
MON
27
1:00 pm—3:00 pm
Fuels Advisory Committee
JAN 2025
FRI
31
9:30 am—3:30 pm
Generating Resources Advisory Committee
FEB 2025
WED
05
9:00 am—12:00 pm
System Analysis Advisory Committee
FEB 2025
TUE WED
11 - 12
Council Meeting
FEB 2025
WED
19
2:00 pm—4:00 pm
Demand Forecast Advisory Committee
FEB 2025
THU
20
9:00 am—12:15 pm
RTF Meeting
1:30 pm—4:30 pm
Demand Response Advisory Committee
FEB 2025
FRI
21
9:30 am—12:30 pm
Conservation Resources Advisory Committee
FEB 2025
THU
27
1:00 pm—4:00 pm
Resource Adequacy and System Analysis Advisory Committees Combined Meeting
MAR 2025
FRI
07
9:00 am—12:00 pm
Approach to Modeling Operational Risks from Wildfires Webinar
MAR 2025
MON WED
10 - 12
Council Meeting
MAR 2025
TUE
18
9:00 am—4:00 pm
RTF Meeting
MAR 2025
THU
20
1:00 pm—4:00 pm
Demand Response Advisory Committee
MAR 2025
WED
26
1:00 pm—3:00 pm
Generating Resources Advisory Committee
MAR 2025
THU
27
9:00 am—11:00 am
Resource Adequacy Advisory Committee - Steering Committee
12:30 pm—1:30 pm
Special Council Meeting
APR 2025
THU
03
1:00 pm—3:00 pm
Climate and Weather Advisory Committee
APR 2025
TUE WED
08 - 09
Council Meeting
APR 2025
THU
10
9:00 am—11:00 am
Fuels Advisory Committee Meeting
APR 2025
TUE
15
9:00 am—11:30 am
RTF Meeting
APR 2025
WED
16
1:30 pm—4:00 pm
Demand Response Advisory Committee
APR 2025
MON
21
1:00 pm—5:00 pm
Conservation Resources Advisory Committee
APR 2025
THU
24
9:00 am—10:00 am
Public Affairs Committee
APR 2025
TUE
29
1:00 pm—3:00 pm
Council Meeting
MAY 2025
TUE WED
13 - 14
Council Meeting
MAY 2025
FRI
16
2:00 pm—4:00 pm
Demand Forecast Advisory Committee
MAY 2025
THU
22
9:00 am—2:30 pm
RTF Meeting
MAY 2025
THU
29
9:00 am—12:00 pm
Conservation Resources Advisory Committee
MAY 2025
FRI
30
1:30 pm—3:00 pm
Demand Response Advisory Committee
JUN 2025
TUE WED
10 - 11
Council Meeting
JUN 2025
TUE WED
17 - 18
RTF Meeting
JUL 2025
TUE WED
15 - 16
Council Meeting
JUL 2025
TUE
22
9:00 am—4:00 pm
RTF Meeting
AUG 2025
TUE WED
12 - 13
Council Meeting
AUG 2025
TUE WED
19 - 20
RTF Meeting
SEP 2025
TUE WED
09 - 10
Council Meeting
SEP 2025
TUE
16
9:00 am—4:00 pm
RTF Meeting
OCT 2025
WED THU
15 - 16
Council Meeting
OCT 2025
TUE
21
9:00 am—4:00 pm
RTF Meeting
NOV 2025
THU
13
9:00 am—1:00 pm
RTF Meeting
NOV 2025
TUE WED
18 - 19
Council Meeting
DEC 2025
TUE
09
9:00 am—4:00 pm
RTF Meeting
DEC 2025
TUE WED
16 - 17
Council Meeting
View Council Meetings View All Meetings
Reports and Documents

Browse reports and documents relevant to the Council's work on fish and wildlife and energy planning, as well as administrative reports.

Browse Reports

REPORTS BY TOPIC

Power Plan Fish and Wildlife Program Subbasin Plans Financial Reports Independent Scientific Advisory Board Independent Scientific Review Panel Independent Economic Analysis Board

COLUMBIA RIVER HISTORY PROJECT

Draft Fifth Northwest Electric Power and Conservation Plan

A Guide for the Northwest's Energy Future

Council Document Number: 
2004-15
Published date: 
Oct. 1, 2004
Document state: 
Published

Background

The Northwest is unique in how it plans its energy future. Through the Northwest Power and Conservation Council's power plan (see draft plan and appendices), strategies to ensure the affordability and adequacy of the power system are developed in an open forum where the public can voice its opinion. Why is this so important? With the building of the region's first mainstem Columbia River dams in the 1930s, the Northwest would have access to inexpensive electricity for many years. But by the 1960s, increased demand led energy planners to believe that hydro-generating resources would soon be unable to keep up with the demand for electricity.

In the 1970s, the Bonneville Power Administration-the federal agency that markets the electricity generated at federal dams on the Columbia River-began working with public and private utilities in the region to develop major new generating resources, including several nuclear plants. But the projects proved to be hugely expensive and electricity rates, as a consequence, skyrocketed. Growth in electricity demand fell far short of earlier projections, in part because of the high rates. The region was left with an energy surplus in the early 1980s, eliminating the need for most of these new and expensive generating plants. Many of the projects were abandoned, and the region was left with the then-largest municipal bond default in U.S. history. Northwest customers continue to make payments on part of this debt.

Amidst the turmoil caused by this massive planning failure, Congress enacted the 1980 Pacific Northwest Electric Power Planning and Conservation Act authorizing the states of Idaho, Montana, Oregon, and Washington to form the Council, an interstate agency. The Act requires the Council to develop a 20-year power plan to assure the region of an adequate, efficient, economical, and reliable power system; and to develop a fish and wildlife program to protect, mitigate, and enhance fish and wildlife affected by the dams. The Act also requires the Council's power plan to give first priority to cost-effective conservation; second to renewable resources; third to generating resources utilizing waste heat or generating resources of high fuel conversion efficiency; and fourth to all other resources. The power plan is updated every five years.

The experience of the 2000-2001 West Coast electricity crisis, when the wholesale power market exhibited extreme volatility and price spikes, only reinforces the importance of the Council's role. The Council doesn't set rates; it doesn't finance or build power projects. Its power plan lays the framework for the region's energy future. The question the power plan tries to answer is: What should be doing now to prepare for the future?

Recommendation: Conservation

With respect to resource choices, the Council recommends that the region increase its efforts to secure cost-effective conservation immediately. The Council considers improved energy efficiency to be a resource for meeting future electricity demand. Although conservation may result in small rate increases in the short-term, it can reduce both cost and risk in the long-term.

The power plan calls for aggressive and sustained development of conservation: 700 average megawatts between 2005 and 2009.

Recommendation: Demand response

The Council also recommends developing demand response programs-agreements between utilities and customers to reduce demand for power during periods of high prices and short supply. The Council recommends developing 500 megawatts of demand response between 2005 and 2009. Demand response has proven helpful in stabilizing electricity prices and in preventing outages. The Council's analysis shows that although it will probably be used infrequently, demand response reduces both cost and risk compared to developing additional generation.

Recommendation: Wind

Wind generation figures prominently as a resource in the next decade. The attractiveness of wind depends on a number of estimates: that wind incentives will continue unless carbon dioxide emissions controls are enacted; that the trend of decreasing costs will continue over time; that the cost of integrating wind energy into the power system will remain relatively low; that development of large areas of good wind resources west of the Rocky Mountains region will be possible; and the likelihood that some form of increased restrictions on CO2 emissions will be imposed in the future.

Over the next five years, the power plan calls for gathering more experience and information about wind resources and their performance and cost within the regional power system. The Council recommends developing wind generation at a moderate commercial scale-between 50 to 100 megawatts per year-at geographically diverse wind resource areas to resolve the uncertainties associated with this resource and to prepare for its eventual large-scale development. The level of near-term development is consistent with the wind development identified in the resource plans of regional utilities.

Recommendation: Prepare for new power plants

Although the region as a whole currently enjoys a surplus of generating capacity due to reduced demand and the construction of new generating plants over the past three years, the region should secure sites and permits to be prepared to begin construction of new coal generating resources as early as 2010, and to construct additional wind generation shortly thereafter. Later in the 20-year planning period, some additional gas-fired generation may be needed.

Transmission upgrades should be identified so all these resources can be built and brought on line quickly when required. If major transmission upgrades are needed, that work will have to begin before construction of the power plants.

Key policy issues

Along with the Council's recommended resource development plan'the least risk development plan according to the Council's analysis?the power plan includes recommendations on key policy issues confronting the region. These include transmission operation and planning issues, the establishment of resource adequacy standards, and the future role of the Bonneville Power Administration in power supply.

With respect to Bonneville's role, the Council recommends that the agency sell the electricity from the existing Federal Columbia River Power System to eligible customers at cost. Customers that request more power than Bonneville can provide from the existing system should be required to pay the additional cost of providing that service. The Council recommends that Bonneville implement this change through new long-term contracts to be offered in 2007.

Regarding the other issues, the power plan supports the collaborative processes in the region currently underway to address these problems.

Recommended action items for next five years

1)  Develop resources now that can reduce cost and risk to the region

  • 700 average megawatts of conservation, 2005 - 2009
  • 500 megawatts of demand response, 2005 - 2009
  • Secure cost-effective cogeneration and renewable energy projects
  • Develop cost-effective generating resources when needed

2)  Prepare to construct additional resources

  • Maintain an inventory of ready-to-construct projects
  • Resolve uncertainties associated with large-scale wind development
  • Encourage use of state-of-the-art generating technology when siting and permitting projects
  • Plan for needed transmission
  • Improve utilization of available transmission capacity

3)  Confirm the availability and cost of additional resources that promise cost and risk mitigation benefits

  • Oil sands cogeneration
  • Coal gasification
  • Carbon sequestration
  • Energy storage technologies
  • Demonstration of renewable and high efficiency generation with Northwest potential

4)  Establish the policy framework to ensure the ability to develop needed resources

  • Carry out a process to establish voluntary adequacy targets for the Northwest and the rest of the Western system
  • Work through the Grid West, Regional Representatives Group process to address emerging transmission issues within the next two years
  • Revise the role of the Bonneville Power Administration in power supply, consistent with the Council's May 2004 recommendations

5)  Monitor key indicators that could signal changes in plans

  • Periodically report on the regional load-resource situation and indicate whether there is a need to accelerate or slow resource development activities
  • Monitor conservation development and be prepared to intensify efforts or develop alternative resources, if necessary
  • Monitor efforts to resolve uncertainties regarding the cost and availability of wind generation, and prepare to develop alternatives, if necessary
  • Monitor climate change science and policy for developments that would affect resource choices

Graphs and tables

Range forecast of electricity demand

This graph shows the range of forecasts compared to historical consumption. Electricity demand dropped by 2,800 average megawatts between 2000 and 2002 because of electricity price increases and the economic slowdown.

Annual average load/resource balance (under driest conditions)

Since 2000, over 4,500 megawatts of generating capacity has been built in the Northwest. This, combined with the loss of load shown in the demand forecast graph, has led to a surplus of generation. The bars in this graph show the amount of generation in excess of load for three demand forecasts. The graph indicates that under the most likely range of load growth, new generating resources are unlikely to be needed until the end of the decade.

Historical and forecast natural gas prices

Natural gas prices have risen significantly and are expected to remain at high levels in the future.

Resource supply forecast (beginning with least cost)

Levelized costs
in cents per
kilowatt hour
Energy in
average megawatts
1Commercial New & Replacement Lighting1.22245
2Commercial New & Replacement Infrastructure1.4211
3New & Replacement AC/DC Power Converters1.49156
4Residential Dishwashers1.610
5Agriculture ? Irrigation1.680
6Commercial New & Replacement Shell1.6213
7Industrial Non-Aluminum1.7350
8Residential Compact Fluorescent Lights1.7535
9Commercial Retrofit Lighting1.84114
10Residential Refrigerators2.15
11Residential Water Heaters2.280
12Commercial Retrofit Infrastructure2.2105
13Commercial New & Replacement Equipment2.2284
14Chemical Recovery Boiler Upgrades (incremental cost)2.34280
15Residential New Space Conditioning? Shell2.540
16Central MT Wind for local load, firmed and shaped2.59100(typical project)
17Residential Existing Space Conditioning ? Shell2.695
18Commercial Retrofit Shell2.879
19Residential HVAC System Efficiency Upgrades2.965
20Commercial New & Replacement HVAC3.03148
21Residential HVAC System Commissioning3.120
22Eastern WA/OR Wind3.23100(typical project)
23Commercial Retrofit HVAC3.29117
24Commercial Retrofit Equipment3.45109
25Landfill Gas Energy Recovery3.75150
26Montana pulverized coal for local load3.81400(typical project)
27Goldendale CCCT (Cost to complete)4.17248
28Eastern WA/OR Integrated coal gasification w/o carbon dioxide separation4.29425(typical project)
29Residential HVAC System Conversions4.370
30Residential Heat Pump Water Heaters4.3195
31Eastern WA/OR Pulverized Coal or MT Coal w/ TX to Mid-C at embedded cost4.31400(typical project)
32Grays Harbor CCCT (Cost to complete)4.31640
33Montana First Megawatts (Cost to complete)4.39240
34Residential Hot Water Heat Recovery4.425
35Mint Farm CCCT (Cost to complete)4.55286
36Eastern WA/OR CCCT4.71610
37Animal Manure Energy Recovery4.8350
38Residential Clothes Washers5.2135
39Wood Residue Energy Recovery (non-cogen)5.5425
40MT Coal Steam w/ TX to MidC at cost of expansion6.041000each sized to capacity
of 500 KV
transmission expansion
41Central MT Wind w/ TX to MidC, firmed and shaped6.081000
42MT Integrated coal gasification w/ TX to MidC and carbon dioxide separation6.91000
Topics: 
Energy

ISRP 2021-05 LibbyMFWPfollow-up1June.pdf

Download the full report

Sign up for our newsletter

  •    

Contact

  • Central Office
  • Idaho Office
  • Montana Office
  • Oregon Office
  • Washington Office
  • Council Members

Social Media

Facebook threads Instagram LinkedIn Vimeo Flickr

© NW Power & Conservation Council

Privacy policy Terms & Conditions Inclusion Statement