council logo
Contact
About

Integrating energy and the environment in the Columbia River Basin

About the Council
Mission and Strategy Members and Staff Bylaws Policies Careers / RFPs
News

See what the Council is up to.

Read the Latest News
Read All News Press Resources Newsletters International Columbia River

Explore News By Topic

Fish and Wildlife Planning Salmon and Steelhead Wildlife Energy Planning Energy Efficiency Demand Response
Fish and Wildlife

The Council works to protect and enhance fish and wildlife in the Columbia River Basin. Its Fish & Wildlife Program guides project funding by the Bonneville Power Administration.

Fish and Wildlife Overview

The Fish and Wildlife Program

2025-26 Amendment Process 2014/2020 Program Program Tracker: Resources, Tools, Maps Project Reviews and Recommendations Costs Reports

Independent Review Groups

  • Independent Economic Analysis Board (IEAB)
  • Independent Scientific Advisory Board (ISAB)
  • Independent Scientific Review Panel (ISRP)

Forums and Workgroups

  • Asset Management Subcommittee
  • Ocean and Plume Science and Management Forum
  • Regional Coordination
  • Science and Policy Exchange
  • Toxics Workgroup
  • Columbia Basin Research, Monitoring and Evaluation Workgroup
  • Informal Hatchery Workgroup
  • Strategy Performance Indicator Workgroup

Topics

Adaptive Management Anadromous Fish Mitigation Blocked Areas Hatcheries & Artificial Production Invasive and Non-Native Species Lamprey Predation: Sea lions, pike, birds Protected Areas Research Plan Resident Fish Program Tracker: Resources, Tools, Maps Sockeye Sturgeon
Power Planning

The Council develops a plan, updated every five years, to assure the Pacific Northwest of an adequate, efficient, economical, and reliable power supply.

Power Planning Overview

The Northwest Power Plan

9th Northwest Power Plan The 2021 Northwest Power Plan 2021 Plan Supporting Materials 2021 Plan Mid-term Assessment Planning Process and Past Power Plans

Technical tools and models

Advisory Committees

Climate and Weather Conservation Resources Demand Forecast Demand Response Fuels Generating Resources Resource Adequacy System Analysis Regional Technical Forum (RTF) RTF Policy

Topics

  • Energy Efficiency
  • Demand Response
  • Power Supply
  • Resource Adequacy
  • Energy Storage
  • Hydropower
  • Transmission

ARCHIVES

Meetings
See next Council Meeting June 10 - 11, 2025 in Missoula › See all meetings ›

Recent and Upcoming Meetings

Swipe left or right
NOV 2024
WED
06
1:00 pm—4:00 pm
System Analysis Advisory Committee
NOV 2024
THU
07
10:00 am—12:00 pm
Demand Response Advisory Committee
NOV 2024
WED THU
13 - 14
Council Meeting
NOV 2024
TUE WED
19 - 20
RTF Meeting
NOV 2024
THU
21
1:00 pm—2:00 pm
Resource Cost Framework in Power Plan Webinar
NOV 2024
FRI
22
9:30 am—11:30 am
Fuels Advisory Committee
DEC 2024
MON
02
11:00 am—12:00 pm
Demand Response Advisory Committee
DEC 2024
WED
04
10:00 am—12:00 pm
Climate and Weather Advisory Committee
1:00 pm—4:00 pm
RTF Policy Advisory Committee Q4
DEC 2024
TUE WED
10 - 11
Council Meeting
DEC 2024
TUE
17
9:00 am—4:00 pm
RTF Meeting
JAN 2025
WED
08
9:30 am—3:30 pm
Conservation Resources Advisory Committee
JAN 2025
MON
13
10:00 am—12:00 pm
Demand Forecasting Advisory Committee
JAN 2025
TUE WED
14 - 15
Council Meeting
JAN 2025
WED
22
1:00 pm—4:00 pm
RTF New Member Orientation
JAN 2025
THU
23
9:00 am—4:00 pm
RTF Meeting
JAN 2025
MON
27
1:00 pm—3:00 pm
Fuels Advisory Committee
JAN 2025
FRI
31
9:30 am—3:30 pm
Generating Resources Advisory Committee
FEB 2025
WED
05
9:00 am—12:00 pm
System Analysis Advisory Committee
FEB 2025
TUE WED
11 - 12
Council Meeting
FEB 2025
WED
19
2:00 pm—4:00 pm
Demand Forecast Advisory Committee
FEB 2025
THU
20
9:00 am—12:15 pm
RTF Meeting
1:30 pm—4:30 pm
Demand Response Advisory Committee
FEB 2025
FRI
21
9:30 am—12:30 pm
Conservation Resources Advisory Committee
FEB 2025
THU
27
1:00 pm—4:00 pm
Resource Adequacy and System Analysis Advisory Committees Combined Meeting
MAR 2025
FRI
07
9:00 am—12:00 pm
Approach to Modeling Operational Risks from Wildfires Webinar
MAR 2025
MON WED
10 - 12
Council Meeting
MAR 2025
TUE
18
9:00 am—4:00 pm
RTF Meeting
MAR 2025
THU
20
1:00 pm—4:00 pm
Demand Response Advisory Committee
MAR 2025
WED
26
1:00 pm—3:00 pm
Generating Resources Advisory Committee
MAR 2025
THU
27
9:00 am—11:00 am
Resource Adequacy Advisory Committee - Steering Committee
12:30 pm—1:30 pm
Special Council Meeting
APR 2025
THU
03
1:00 pm—3:00 pm
Climate and Weather Advisory Committee
APR 2025
TUE WED
08 - 09
Council Meeting
APR 2025
THU
10
9:00 am—11:00 am
Fuels Advisory Committee Meeting
APR 2025
TUE
15
9:00 am—11:30 am
RTF Meeting
APR 2025
WED
16
1:30 pm—4:00 pm
Demand Response Advisory Committee
APR 2025
MON
21
1:00 pm—5:00 pm
Conservation Resources Advisory Committee
APR 2025
THU
24
9:00 am—10:00 am
Public Affairs Committee
APR 2025
TUE
29
1:00 pm—3:00 pm
Council Meeting
MAY 2025
TUE WED
13 - 14
Council Meeting
MAY 2025
FRI
16
2:00 pm—4:00 pm
Demand Forecast Advisory Committee
MAY 2025
THU
22
9:00 am—2:30 pm
RTF Meeting
MAY 2025
THU
29
9:00 am—12:00 pm
Conservation Resources Advisory Committee
MAY 2025
FRI
30
1:30 pm—3:00 pm
Demand Response Advisory Committee
JUN 2025
TUE WED
10 - 11
Council Meeting
JUN 2025
TUE WED
17 - 18
RTF Meeting
JUL 2025
TUE WED
15 - 16
Council Meeting
JUL 2025
TUE
22
9:00 am—4:00 pm
RTF Meeting
AUG 2025
TUE WED
12 - 13
Council Meeting
AUG 2025
TUE WED
19 - 20
RTF Meeting
SEP 2025
TUE WED
09 - 10
Council Meeting
SEP 2025
TUE
16
9:00 am—4:00 pm
RTF Meeting
OCT 2025
WED THU
15 - 16
Council Meeting
OCT 2025
TUE
21
9:00 am—4:00 pm
RTF Meeting
NOV 2025
THU
13
9:00 am—1:00 pm
RTF Meeting
NOV 2025
TUE WED
18 - 19
Council Meeting
DEC 2025
TUE
09
9:00 am—4:00 pm
RTF Meeting
DEC 2025
TUE WED
16 - 17
Council Meeting
View Council Meetings View All Meetings
Reports and Documents

Browse reports and documents relevant to the Council's work on fish and wildlife and energy planning, as well as administrative reports.

Browse Reports

REPORTS BY TOPIC

Power Plan Fish and Wildlife Program Subbasin Plans Financial Reports Independent Scientific Advisory Board Independent Scientific Review Panel Independent Economic Analysis Board

COLUMBIA RIVER HISTORY PROJECT

Step One Response Review of Snake River Basin Steelhead Kelt Reconditioning Facility Master Plan (Project #2007-401-00)

Council Document Number: 
ISRP 2016-12
Published date: 
Sept. 27, 2016
Document state: 
Published

In response to the Northwest Power and Conservation Council’s request of July 18, 2016, the Independent Scientific Review Panel (ISRP) reviewed a revised Snake River Basin Steelhead Kelt Reconditioning Facility Master Plan prepared by the Columbia River Inter-Tribal Fish Commission (CRITFC) and the Nez Perce Tribe (hereafter “project proponents”). In the preliminary review dated May 13, 2016, the ISRP found the original Master Plan to be well written, containing an excellent summary of the extensive steelhead reconditioning work that has occurred in the Basin, but needing clarification on nine issues (ISRP 2016-8). The project proponents revised the Master Plan and included an appendix in response to the ISRP’s preliminary review.

This evaluation is part of the Council’s Three Step Review Process for artificial production programs. The Master Plan is a component of Project #2007-401-00, Kelt Reconditioning and Reproductive Success Evaluation Research. The proponents are proposing to modify the Nez Perce Tribal Hatchery (NPTH) and install six 20-foot and four 15-foot circular tanks to support the long-term reconditioning of up to 750 Snake River Basin steelhead kelts. This infrastructure would support the annual release of 180 reconditioned kelts – “the equivalent of a 6% increase in B-run adult steelhead escapement relative to the base period considered in the Supplemental Comprehensive Analysis Steelhead Kelt Appendix (Bellerud et al. 2008).”

The proponents acknowledge that the submitted Master Plan does not yet have all the necessary components for a Step 1 review. It currently lacks a Hatchery Genetic Management Plan (HGMP), and work is needed on the program’s Research, Monitoring and Evaluation (M&E) Plan, Comprehensive Environmental Assessment, Value Engineering review, and final design. Before producing these elements of the Master Plan, the proponents requested that the ISRP determine if the program’s preferred location for a long-term reconditioning facility for Snake River B-run steelhead is appropriate. The ISRP agrees that the NPTH provides the best location, among those considered, for the proposed kelt reconditioning facility. The proponents now need to complete the components of their Master Plan that were delayed until this assessment was made.

ISRP Recommendation: Meets Scientific Review Criteria (Qualified)

The proponents provided good detailed responses to the issues that were raised in the last ISRP review. A lingering issue, however, is the possibility that B-run steelhead abundance might be constrained by density dependent factors during the spawner to smolt stage rather than by low numbers of spawning adults. Monitoring studies to assess density dependent effects will be challenging to implement because of the remote locations of some of the populations. Moreover, collecting biological information is difficult due to high flows and turbidity during the spring when adults are returning to spawn and smolts are emigrating. Even so, Idaho Department of Fish and Game (IDFG) researchers (Copeland et al. 2013) developed recruits per spawner (R/S) relationships in two Snake River steelhead streams (Fish Creek, 15 broodyears, Lochsa River, Clearwater subbasin; Rapid River, 4 broodyears, Little Salmon River, Salmon subbasin). In both cases, density-dependent effects were detected.

The proponents are convinced (the ISRP less so) that increasing adult escapement will augment B-run population abundance. They hypothesize that reconditioned kelts from their program will increase the abundance and productivity of B-run steelhead populations located above Lower Granite Dam (LGR). The ISRP acknowledges that even if density dependence is currently limiting abundance, ongoing habitat and fish passage restoration work may help alleviate some population bottlenecks and lead to increased productivity. Also, reconditioned adults are buffered from environmental conditions that affect survival rates in mainstem and ocean habitats. Thus, these fish may become an important conservation resource when the survival of maiden steelhead is impacted by poor marine and river conditions. The project also directly addresses the issue of declining iteroparity in Snake River steelhead. Additionally, it provides an opportunity to assess the viability of using reconditioned kelts in population recovery. Consequently, the program offers a “spread-the-risk” strategy that can provide potential benefits not possible through any other existing or proposed action. The Council may wish, however, to weigh these potential benefits against those that might be obtained by alternative actions which improve B-run steelhead survival in tributary and mainstem habitats.

Qualification - The ISRP recommends that the proponents address the following four issues during the next phase of project development:

  1. Of the proposed locations for the kelt reconditioning facility, the NPTH appears to be the best option. The existing HGMP and Environmental Assessment for the NPTH will need to be modified to account for the reconditioning program.
  2. A comprehensive M&E Plan with an adaptive management component is needed. The M&E plan should describe quantitative objectives, sampling designs, data collection, and an assessment methodology that will be used to evaluate density dependence in B-run steelhead populations.
  3. Biologically based escapement goals that consider density dependence should also be included in the M&E Plan. Such goals will help the proponents assess the contributions that reconditioned kelts are making toward B-run recovery on a population-specific basis.
  4. The M&E plan should also provide more information on the level of effort that will be expended on collecting natural origin B-run kelts and on how they will be identified. How, for example, will the inadvertent inclusion of unclipped B-run hatchery kelts in the program be avoided?
Topics: 
Fish and wildlife
Tags: 
SteelheadKeltSnake RiverISRP2007-401-00

ISRP 2021-05 LibbyMFWPfollow-up1June.pdf

Download the full report

Sign up for our newsletter

  •    

Contact

  • Central Office
  • Idaho Office
  • Montana Office
  • Oregon Office
  • Washington Office
  • Council Members

Social Media

Facebook threads Instagram LinkedIn Vimeo Flickr

© NW Power & Conservation Council

Privacy policy Terms & Conditions Inclusion Statement