Contact
About

Integrating energy and the environment in the Columbia River Basin

About the Council
Mission and Strategy Members and Staff Bylaws Policies Careers / RFPs
News

See what the Council is up to.

Read the Latest News
Read All News Press Resources Newsletters International Columbia River

Explore News By Topic

Fish and Wildlife Planning Salmon and Steelhead Wildlife Energy Planning Energy Efficiency Demand Response
Fish and Wildlife

The Council works to protect and enhance fish and wildlife in the Columbia River Basin. Its Fish & Wildlife Program guides project funding by the Bonneville Power Administration.

Fish and Wildlife Overview

The Fish and Wildlife Program

2020 Addendum 2014/2020 Columbia River Basin Fish and Wildlife Program Subbasin Plans Project Reviews and Recommendations

Independent Review Groups

  • Independent Economic Analysis Board (IEAB)
  • Independent Scientific Advisory Board (ISAB)
  • Independent Scientific Review Panel (ISRP)

Forums and Workgroups

  • Asset Management Subcommittee
  • Ocean and Plume Science and Management Forum
  • Regional Coordination
  • Science and Policy Exchange
  • Toxics Workgroup
  • Columbia Basin Research, Monitoring and Evaluation Workgroup
  • Informal Hatchery Workgroup
  • Strategy Performance Indicator Workgroup

Topics

  • Adaptive Management
  • Anadromous Fish Mitigation
  • Blocked Areas
  • High-level Indicators
  • Invasive and Non-Native Species
  • Lamprey
  • Predation: Sea lions, pike, birds
  • Protected Areas
  • Research Plan
  • Resident Fish
  • Resource Tools and Maps
  • Sockeye
  • Sturgeon
  • Hatchery Map
Energy

The Council develops a plan, updated every five years, to ensure the region’s power supply and acquire cost-effective energy efficiency.

Energy Overview

The Northwest Power Plan

The 2021 Northwest Power Plan 2021 Plan Supporting Materials Planning Process and Past Power Plans

Technical Tools and Models

  • Regional Portfolio Model
  • Generation Evaluation System Model (GENESYS)

Energy Advisory Committees

  • Regional Technical Forum
  • Conservation Resources Advisory Committee
  • Demand Forecast Advisory Committee
  • Demand Response Advisory Committee
  • Generating Resources Advisory Committee
  • Natural Gas Advisory Committee
  • Resource Adequacy Advisory Committee
  • System Analysis Advisory Committee
  • RTF Policy Advisory Committee
  • System Integration Forum
  • Resource Strategies Advisory Committee (Not Active)

Energy Topics

  • Energy Efficiency
  • Demand Response
  • Power Supply
  • Resource Adequacy
  • Energy Storage
  • Hydropower
  • Transmission

Energy Forums and Workgroups

  • Pacific NW Demand Response Project
  • Northwest Wind Integration Forum (Archive)
Meetings
See next F&W Committee Meeting and Council Meeting July 06 - 07, 2022 in Webinar › See all meetings ›

Recent and Upcoming Meetings

Swipe left or right
AUG 2021
TUE
31
9:00 am—2:45 pm
RTF Meeting
SEP 2021
MON
13
9:00 am—12:00 pm
Strategy Performance Indicator Workgroup
SEP 2021
TUE WED
14 - 15
Council Meeting
SEP 2021
TUE
21
10:00 am—11:00 am
Informal Hatchery Workgroup Meeting
SEP 2021
TUE WED
21 - 22
RTF Meeting
SEP 2021
MON
27
Power Plan Public Hearing Hosted by Montana
SEP 2021
WED
29
9:00 am—11:30 am
RTF Policy Advisory Committee Meeting
OCT 2021
THU
07
Power Plan Public Hearing Hosted by Washington
OCT 2021
TUE
12
Power Plan Public Hearing Hosted by Oregon
OCT 2021
TUE WED
12 - 13
Council Meeting
OCT 2021
THU
14
Power Plan Public Hearing Hosted by Idaho
OCT 2021
TUE
19
9:30 am—3:00 pm
RTF Meeting
NOV 2021
TUE
09
9:00 am—1:00 pm
RTF Meeting
NOV 2021
TUE WED
16 - 17
Council Meeting
NOV 2021
TUE
30
1:00 pm—3:00 pm
RTF Policy Advisory Committee Meeting
DEC 2021
TUE WED
07 - 08
RTF Meeting
DEC 2021
MON
13
9:00 am—11:00 am
Strategy Performance Indicator Workgroup
DEC 2021
TUE WED
14 - 15
Council Meeting
JAN 2022
TUE WED
11 - 12
Council Meeting
JAN 2022
WED
19
1:00 pm—5:00 pm
Ocean and Plume Science and Management Forum
JAN 2022
TUE
25
9:00 am—12:00 pm
RTF New Member Orientation: January 25, 2022
JAN 2022
WED
26
9:00 am—1:00 pm
RTF Meeting
JAN 2022
FRI
28
8:30 am—11:30 am
Power Committee Meeting
FEB 2022
MON
14
9:00 am—10:30 am
Informal Hatchery Workgroup Meeting
FEB 2022
TUE WED
15 - 16
Council Meeting
FEB 2022
WED
23
9:00 am—2:30 pm
RTF Meeting
MAR 2022
WED
02
9:30 am—3:00 pm
System Integration Forum: Scope of Work on Potential Lower Snake River Dam Analysis
MAR 2022
TUE
08
1:30 pm—2:30 pm
Public Affairs Committee Meeting
MAR 2022
MON TUE
14 - 15
Council Meeting
MAR 2022
FRI
18
9:00 am—11:00 am
Fish and Wildlife Committee Meeting
MAR 2022
TUE WED
22 - 23
RTF Meeting
MAR 2022
WED
30
9:30 am—12:00 pm
RTF Policy Advisory Committee Q1 Meeting
APR 2022
TUE WED
12 - 13
Council Meeting
APR 2022
TUE WED
19 - 20
RTF Meeting
MAY 2022
TUE WED
10 - 11
F&W and Power Committee Meetings
MAY 2022
WED
18
Council Meeting
MAY 2022
TUE
24
9:00 am—2:30 pm
RTF Meeting
JUN 2022
WED
08
1:00 pm—3:30 pm
System Analysis Advisory Committee
9:30 am—11:30 am
RTF Policy Advisory Committee Q2 Meeting
JUN 2022
TUE WED
14 - 15
Council Meeting
JUN 2022
WED
22
9:00 am—2:00 pm
RTF Meeting
JUL 2022
WED THU
06 - 07
F&W Committee Meeting and Council Meeting
JUL 2022
FRI
08
9:00 am—10:30 am
Resource Adequacy Adv Comm - Steering Committee
JUL 2022
TUE WED
12 - 13
Council Meeting
JUL 2022
TUE
19
9:00 am—4:00 pm
RTF Meeting
JUL 2022
WED
27
9:30 am—3:30 pm
Resource Adequacy and System Analysis Committee Meeting
AUG 2022
TUE
09
9:00 am—4:00 pm
RTF Meeting
AUG 2022
TUE WED
16 - 17
Council Meeting
SEP 2022
TUE WED
13 - 14
Council Meeting
SEP 2022
TUE WED
20 - 21
RTF Meeting
SEP 2022
WED
28
9:00 am—12:00 pm
RTF Policy Advisory Committee Q3 Meeting
OCT 2022
TUE WED
04 - 05
F&W and Power Committee Meetings
OCT 2022
TUE WED
11 - 12
Council Meeting
OCT 2022
TUE WED
18 - 19
RTF Meeting
NOV 2022
TUE
08
9:00 am—4:00 pm
RTF Meeting
NOV 2022
TUE WED
15 - 16
Council Meeting
NOV 2022
WED
30
9:00 am—12:00 pm
RTF Policy Advisory Committee Q4 Meeting
DEC 2022
TUE WED
06 - 07
RTF Meeting
DEC 2022
TUE WED
13 - 14
Council Meeting
View Council Meetings View All Meetings
Reports and Documents

Browse reports and documents relevant to the Council's work on fish and wildlife and energy planning, as well as administrative reports.

Browse Reports

REPORTS BY TOPIC

Power Plan Fish and Wildlife Program Subbasin Plans Financial Reports Independent Scientific Advisory Board Independent Scientific Review Panel Independent Economic Analysis Board

COLUMBIA RIVER HISTORY PROJECT

II. Investment strategy

II. Investment strategy

Published date: 
Dec. 30, 2014
Document state: 
Published

Share

Strategy

Assure funding to identified program priorities to maximize the biological response resulting from ratepayer and cost-shared investments.

Rationale

The Council’s program contains hundreds of measures at the basinwide, mainstem and subbasin levels. Program measures are funded and implemented not just by Bonneville, but also through programs under the authority of the U.S. Army Corps of Engineers (the Corps), the Bureau of Reclamation (the Bureau) and the Federal Energy Regulatory Commission as its licensed non-federal hydroproject operators.

Bonneville has chosen to implement many of its Northwest Power Act requirements through a series of long-term commitments that it believes help address its legal obligations through at least 2018 and beyond in some cases. Bonneville continues to prioritize ESA responsibilities in its investment plan, although it also funds elements of the Council’s program that address the other, non-listed fish and wildlife affected by the hydrosystem.

The program represents a substantial investment by the ratepayers of the Northwest and the nation’s citizens. For example, over the last three decades Bonneville and the other program implementers have made substantial investments in a wide variety of physical structures and land acquisitions to benefit fish and wildlife. There is a growing need throughout the Columbia River Basin to protect or upgrade these investments as facilities age or become obsolete, structural standards change, and extreme-event damages accumulate.

The Council recognizes that ratepayer funding requires some basic controls and that there is not unlimited funding to address every need for fish and wildlife affected by the development of the federal hydrosystem, all at once. At the same time, the Council received recommendations to continue the ongoing work under the program along with recommendations for new or expanded work. Bonneville’s existing budget commitments limit its flexibility for funding new work, constrain expansion of ongoing work, may leave unfunded some of the state and federal fish and wildlife agencies’ and tribes’ priorities, and provide for only limited capacity for maintenance of past investments.

To assure thoughtful use of Bonneville funding to maximize benefits to fish and wildlife, the Council has identified the following principles and priorities to guide the funding and implementation of program priorities by Bonneville, the Corps, the Bureau, project sponsors, and their partners.

Principles

  • Bonneville will fulfill its commitment to meet all of its fish and wildlife obligations.
  • Program funding levels should take into account the level of impact caused by the federally operated hydropower system and the off-site protection and mitigation provisions of the Northwest Power Act enabling program investments in related spawning grounds and habitat.
  • Wildlife mitigation should emphasize addressing areas of the basin with the highest proportion of unmitigated losses.
  • The Council will continue to evaluate the distribution of funding to provide fair and adequate treatment across the program. Meanwhile, the Council maintains the current funding allocation for anadromous fish (70 percent), resident fish (15 percent), and wildlife (15 percent).
  • Hydropower facility site-specific invasive species prevention actions and toxics reduction activities are ongoing maintenance issues. Funding for these efforts should be derived primarily from the Corps and the Bureau operations and maintenance budgets rather than from Bonneville’s fish and wildlife budget to implement the program.
  • The Council believes that final determination of a yearly direct program budget should occur no later than one year before the relevant projects are to be funded. Generally these projects’ budgets are difficult to forecast more than three years in advance of initiation; so the budget is expected to be a rolling three-year spending plan, developed by Bonneville, that will have a current spending estimate replaced by a new three-year estimate every year.
  • Priority work funded through the Columbia River Fish Mitigation Program (CRFM) should not go unfunded because of competing priorities between districts of the Corps (e.g., between the Columbia/Snake hydropower projects and the Willamette Basin projects). The Council urges the action agencies to meet their Willamette and FCRPS Biological Opinion implementation and mitigation obligations.
  • Provide for timely ongoing operation and maintenance costs associated with existing investments. Some existing projects are aging and need repair. Long term maintenance for existing projects including fish screens, hatchery structures, wildlife acquisitions, and other long term needs must be supported to meet project and program objectives.
  • Bonneville and the action agencies should allocate and assure adequate funding for the application and recovery or detection of PIT tags, coded wire tags, acoustic and radio tags, and genetic tags.
  • Bonneville will continue to provide adequate support for terminal fisheries in the estuary and other basinlocations.

Emerging program priorities

The Northwest Power Act establishes Bonneville’s obligation to protect and mitigate for fish and wildlife impacts from the development and operation of the hydropower system. The Council recognizes its obligation, in turn, to construct a program that guides Bonneville’s protection and mitigation efforts. Work necessary to satisfy Bonneville’s mitigation obligation must be sized appropriately during Bonneville’s rate cases and as it projects its capital and expenditure budgets, so as to provide equitable treatment to high-priority fish and wildlife projects, regardless of whether or not they are identified in a biological opinion or in an accord, while also accommodating yearly budget limitations.

Many of the program’s current measures represent ongoing activities that already have multi-year funding and implementation commitments from Bonneville and the other federal agencies for the foreseeable future. These ongoing activities and existing program areas represent a set of priorities from earlier programs and largely continue into the new program.

At the same time, the Council received recommendations for many new measures for inclusion into the 2014 Program. All measures are subject to the same legal obligation on the part of the federal agencies with responsibilities toward the Council’s program under the Northwest Power Act. Some of the new measures recommended for inclusion in the 2014 Program expand existing work in new or additional directions; others represent new directions for the program.

The Council is providing the following guidance to Bonneville, the other federal agencies, and the region in general as to which of these new measures are emerging priorities for implementation in the next five years. During the course of the next five years, the Council anticipates that Bonneville will take the necessary steps to integrate these priorities into the program and will report annually to the Council on its progress. The Council may adjust the following ordered program priorities:

  1. Provide for funding long-term maintenance (Appendix P) of the assets that have been created by prior program investments
  2. Implement adaptive management (including prioritized research on critical uncertainties) throughout the program by assessing the effectiveness of ongoing projects, developing program objectives when appropriate and taking into account the effects of climate change
  3. Preserve program effectiveness by supporting: (1) expanded management of predators; (2) mapping and determining hotspots for toxic contaminants; and (3) aggressively addressing non-native and invasive species
  4. Investigate blocked area mitigation options through reintroduction, passage and habitat improvement, and implement if warranted
  5. Implement additional sturgeon and lamprey measures (passage and research)
  6. Update the subbasin plans most in need of updates
  7. Continue efforts to improve floodplain habitats

Bonneville funding for emerging program priorities

Bonneville should fund any new fish and wildlife obligations from identifying savings within the current program and as necessary, from additional expenditures. Savings from the current program should not compromise productive projects that are addressing needs identified in this program. For example, additional funding can be obtained when projects complete their goals, such as a research project, or when a project is no longer reporting useful results. Funding should also be sought in general overhead budgets including Bonneville’s overhead for its Fish and Wildlife Division. To the extent that targeted savings are insufficient to meet Bonneville’s financial obligations in this program, Bonneville should consider increasing expenditures. Prior to every rate case Bonneville should report to the Council how it plans to budget for implementation of the fish and wildlife program. [see cost-effectiveness recommendations from the IEAB].

ISRP 2021-05 LibbyMFWPfollow-up1June.pdf

Sign up for our newsletter

  •    

Contact

  • Central Office
  • Idaho Office
  • Montana Office
  • Oregon Office
  • Washington Office
  • Council Members

Social Media:

Facebook Twitter Instagram LinkedIn Vimeo Flickr

Copyright 2022

Privacy policy Terms & Conditions Inclusion Statement